Pre-solicitationPosted Aug 4, 2026·Responses due Aug 19, 2026

Youghiogheny Resource Managers Building Siding Replacement

Army Corps of Engineers · W072 ENDIST PITTSBURGH

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
238170
Value
Not stated
Solicitation
W911WN26QA059
Set-aside
Small Business Set Aside - Total
PSC
Y1QA
Place
Not stated
Contact
Aaron Barr (aaron.m.barr@usace.army.mil)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation W911WN26QA059 in this department, oldest first.

Early notice
  • Aug 4, 2026 · this notice
    Pre-solicitation
  • Aug 4, 2026
    Pre-solicitation
    Open
Solicitation
  • Aug 20, 2026
    Solicitation
    Open
  • Sep 1, 2026
    Solicitation
    Open
  • Sep 10, 2026
    Solicitation
    Open
  • Sep 22, 2026
    Solicitation
    Open
Award
Not yet. Typical award: Sep 14, 2026 to Dec 8, 2026, middle of the range Oct 9, 2026.
Measured from 718 past early notices at Dept of the Army that later posted an award (middle half of cases, counted from Aug 4, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

USACE, Pittsburgh District, has an upcoming requirement to replace the siding of the Resource Managers Office at Youghiogheny River Lake. The work described herein shall be performed at the Youghiogheny Resource Managers Office (RMO) building located within the Youghiogheny River Lake project area in Confluence, Pennsylvania. The building currently serves as administrative office space for the U.S. Army Corps of Engineers. The RMO building was constructed in 1986 and is a multi-level, timber-framed structure built into the hillside overlooking the impoundment side of the dam. The exterior wall… (show all)

s consist of 2x6 wood stud framing with 6-inch fiberglass batt insulation (R-19, foil-faced). Interior partitions consist of 2x4 wood studs with 1/2-inch gypsum wallboard. The existing exterior wall assembly consists of 1/2-inch asphalt-saturated fibrous sheathing with 5/8-inch cedar-faced T1-11 plywood siding, for a combined nominal thickness of 1-1/8 inches. Exterior trim and fascia consist of various widths of cedar lumber. The building is supported by cast-in-place concrete footings and 12-inch concrete masonry unit (CMU) foundation walls. The rear wall section and balcony framing are supported by 4 feet-0 inches wide by 5 feet-0 inches deep concrete footings, laminated wood columns (8-3/4 inches x 15 feet-0 inches), and laminated wood beams (8-3/4 inches x 15 feet-0 inches).This project consists of the removal and replacement of the existing exterior wall cladding system. The Contractor shall remove and dispose of the existing T1-11 siding and 1/2-inch asphalt-saturated fibrous sheathing in their entirety. The Contractor shall furnish and install a new exterior wall assembly consisting of 1/2-inch APA-rated structural wood sheathing, a continuous weather-resistive barrier (WRB), 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer requirements. The new wall assembly is intended to match the existing wall thickness (approximately 1-1/8 inches) to maintain alignment with existing window and door openings. Minor dimensional variation within normal construction tolerances are acceptable and shall not require modification or resetting of existing windows and doors. The Contractor shall not reset, relocate, or otherwise modify existing windows and doors. Furring strips shall be installed vertically over the WRB at a maximum spacing of 16 inches on center and shall be fastened through the sheathing into wall framing members. Fiber cement siding shall be installed horizontally over the furring strips and fastened through the furring and sheathing into wall framing members. Furring strips are intended to provide a drainage and ventilation cavity and shall not be used as the sole fastening substrate for the fiber cement lap siding. The Contractor shall ensure that all fiber cement lap siding edges are supported by framing members or approved blocking in accordance with manufacturer requirements. The Contractor shall furnish and install all required trim at windows, doors, corners, and transitions. Trim material shall be fiber cement. The cedar hand railing on the balconys is to be new capped PVC or capped composite decking of matching color to fiber cement board siding. The Contractor shall provide complete flashing at all required locations, including but not limited to head flashing at windows and doors, Z-flashing at horizontal joints and transitions, and kick-out flashing at roof-to-wall intersections. All flashing shall be integrated with the WRB in a shingle-lap manner to maintain a continuous drainage plane.

Who won similar work

68 award notices on SAM.gov in the last 24 months. Match: Same agency (Army Corps of Engineers), same industry group (NAICS 2381).

WinnerAwardsValueLast
BRAZOS ROOFING INTERNATIONAL OF SOUTH DAKOTA, INC.7$14.4MAug 25, 2026
AR6-Cram Construction & Roofing LLC6$13.8MJul 27, 2026
BRN GROUP LLC4$218KAug 27, 2026
CARMEN ROOFING SERVICES, LLC2$4.8MAug 13, 2026
DEFENSE ROOFING SOLUTIONS, LLC2$4.4MJul 29, 2026
JAXON CONSTRUCTION INC2$491KJun 22, 2026
THE INSPIRED GROUP, LLC2$92KJul 30, 2025
Martinez Services, Inc.1$99.0MNov 18, 2024
AAECON GENERAL CONTRACTING LLC1$99.0MNov 18, 2024
REASOR BUILDING GROUP LLC1$99.0MNov 18, 2024

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
  • 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.