Z2DA--Renovate Halls, Walls, Ceilings
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24624B0005 in this department, oldest first.
- Feb 27, 2024SolicitationOpen
- Mar 6, 2024SolicitationOpen
- Sep 26, 2024SolicitationOpen
- Sep 27, 2024SolicitationOpen
- Sep 27, 2024SolicitationOpen
- Oct 16, 2024SolicitationOpen
- Oct 16, 2024SolicitationOpen
- Oct 28, 2024SolicitationOpen
- Oct 28, 2024SolicitationOpen
- Oct 28, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 29, 2024SolicitationOpen
- Oct 31, 2024SolicitationOpen
- Oct 31, 2024SolicitationOpen
- Nov 22, 2024SolicitationOpen
- Nov 26, 2024SolicitationOpen
- Dec 18, 2024SolicitationOpen
- Dec 18, 2024SolicitationOpen
- Jan 22, 2025SolicitationOpen
- Jan 22, 2025SolicitationOpen
- Jan 31, 2025SolicitationOpen
- Jan 31, 2025SolicitationOpen
- Feb 14, 2025 · this noticeSolicitation
- Feb 14, 2025SolicitationOpen
- Feb 28, 2025SolicitationOpen
- Feb 28, 2025SolicitationOpen
- Mar 6, 2025SolicitationOpen
- Mar 6, 2025SolicitationOpen
- Mar 6, 2025SolicitationOpen
- Apr 3, 2025SolicitationOpen
- Apr 3, 2025SolicitationOpen
- Apr 3, 2025SolicitationOpen
- Apr 3, 2025SolicitationOpen
- Apr 3, 2025SolicitationOpen
- Apr 14, 2025SolicitationOpen
- Apr 14, 2025SolicitationOpen
- Apr 17, 2025SolicitationOpen
- Apr 17, 2025SolicitationOpen
- May 8, 2025SolicitationOpen
- Jun 27, 2025Award NoticeLOCKRIDGE FBI LLC · $1.6MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Item # RFI's AE Response 1 Please confirm that no new fire protection piping, sprinklers, or alarms are to be installed as part of this project. FA: No new Fire Alarm devices are included in the scope of work. FP: No new fire protection piping or sprinklers. Protect existing heads in place while ceiling is removed/replaced and painting is performed. Refer to General Note 26 on G-001. 2 Please confirm that no new mechanical equipment and/or ducts, diffusers, grilles, etc. are to be installed as part of this contract. Per Detail 2/M-001 Note 4, Flexible Duct at the diffuser is to be replaced. 3 … (show all)
Please confirm that no new electrical or low voltage devices and/or fixtures are to be installed as part of this contract. No new electrical or low voltage devices are included in the scope of work. Existing devices shall be protected in place, or removed and reinstalled, as indicated in the contract drawings. 4 During the site visit, it was observed that there were areas with split plastic walls that would present difficulties for maintain negative air. Can the VA please provide a solution for these areas? Contractor shall include building the appropriate walls per drawing, specification, and infection control to meet the negative air requirement. 5 Please confirm that since no new systems are being added, that systems testing is required. Reference Spec Section 01 00 00 - 24 para 1.21 No new low voltage systems included in the scope of work. System testing is not required. 6 Will the VA Permit the use of Procore for Construction & Document Management Software? Yes, procore or submittal exchange shall be used. VA can work with either one of these softwares. 7 Per Spec Section 01 35 26 - 10 para 1.7 A "The SSHO can not share responsibilities with the Superintendent". Please confirm that it is acceptable for the Superintendent to fulfill the responsibilities of the QCM and thus being a "Dual Hat" project. Yes, the Superintendent may fulfill the role of the QCM. 8 Has a hazardous material survey been conducted? If so, can the hazmat survey report be provided? A survey detailing pictures, locations, and levels of ACM and LBP will be required in order to provide an accurate estimate on abatement. ACM report was provided in the Bid Documents. Contractor is responsible for their own takeoffs as indicated on the plans 9 The amendments state that bidders must sign and return a copy of all amendments with bid submissions. Amendment 0003 does not currently have an SF30 for signature. It also appears Amendment 0001 is missing from the solicitation attachments. Will the Acknowledgement of Amendments on the SF1442 suffice for this requirement or will each bidder have to include the signed SF30 of all 13 amendments? Amendments 0001-0004 apply to the pre-solicitation. Sign and return Amendments 0005-0014. 10 Please confirm that there is no LBP intended to be abated but that the work with regards to LBP is limited to cleaning with a COTS (common off the shelf) cleaning solution. As per abatement report provided 11 Please confirm if monthly inspections will be required per Spec Section 01 35 26-12 para 1.9.B? Yes. 12 Will the hours remain the same for phase in solicitation or will there be any adjustments? Question is unclear. Need more clarification. 13 In specs call for QC manager/Superintendent, this only requirement one person from GC on site? No SHHO required? This is the same question on item 7 above. Superintendent may fulfill the role of the QCM. SSHO shall be provided as separate person. Superintendent will not fulfill the role of SSHO. 14 Who will disable the fire alarm disconnect and reconnect fire alarm devices? There is no electrical spec or cost associated with this. Refer to the Low Voltage Scope of Work narrative on sheet LV001. 15 Will a storage location be available for this project? No, contractor shall bring materials onsite as needed for the work. 16 Reference M-001 please provide a plumbing riser diagram/information to indicate the path of the pipes from the unit to the main or confirm that the water main is directly above the unit (in the corridor). Pipes route to the crawlspace and account for 25' to get to the main for supply and return piping. 17 Please confirm that the existing lights are independently supported (a code requirement) and not just nested in the existing ceiling grid. The contractor is responsible for temporarily supporting the existing luminaires from structural supports while the ceiling grid system is removed & replaced. Once the new grid is in place, the existing luminaires shall be reinstalled and supported independant of the grid system. 18 Reference Solicitation page 6 of 63 Site Requirements state that contractor and all subcontractors are required to have proof of OHSA 10 training. Does this mean that every construction worker on site has to have an OSHA 10 card? Yes, OSHA 30-hour for all trade CPs withing the past 5 years and OSHA 10-hour withing the past 5 years for all other construction workers. 19 Please confirm that the phases will only be executed in numerical order Phase 1, then Phase 2, 3, etc. or can the contractor re-organize the phases? Yes, the phases will only be executed in numerical order unless otherwise noted by the VA COR. 20 During the site visit there was discussion about the work being executed during normal business hours, however working hours on Drawing A-001 state that work is only to be done at nights and on weekends. Please clarify the working hours for this contract. Per Sheet Note F on Sheet A-001, no construction work is allowed during facility operation hours on the ground floor. Refer to Phasing, ICRA Plans and Sheet Note A for specific hours of operation. 21 There is no on-site storage guaranteed. Will a location be made available for demolition, abatement and construction debris dumpsters? Location for dumpster can be made available for the contractor on the cumpus with duration based on a reasonable demolition time. 22 Who is responsible for removing, packaging and storing VA artwork on walls that is to remain? Approximately how many wall hangings will be kept and stored? Refer to General Notes 15 and 16 on Drawing Sheet G-001. 23 The scope of work related to the expansion joints is not clear. In some cases, there are note stateing to replace the cover, other locations state to replace steel protection at both sides of the expansion joint. If the scope is to remove and replace the entire expansion joint, please provide a building standard or basis of design. Refer to Specification 07 95 13 Expansion Joint Cover Assemblies and Details 11, 12, 13 of Drawing Sheet A-501. See floor plans for locations and notes. Hallway Elevations 3 and 4 on Drawing Sheet A-201 indicate there are existing steel protection to be replaced on both sides of the new wall and floor EJ cover plate, must fit between steel protection. 24 If we close ½ of a hallway construction, how will the occupants of those spaces access those rooms? All construction work shall follow phasing schedule on Sheet A-001 Sheet Note "A" per General Note 11 on Sheet G-001. The schedule and hours listed on A-001 Sheet Note "A" are outside of the facility noraml operation hours. The VA COR shall coordinate with the contractor in advance if any specific rooms required access by the occupants during construction. Also refer to Item 20 above. 25 Are details available on the GFCI artwork to understand backing/bracing and installation requirements. According to Keynote 2 on Sheet A-102, the digital image on full height Inpro wall protection will be furnished by the VA installed by contractor. Please coordinate with the VA Interior Designer. 26 Will you be updating the� Wage Determination?� It is currently 13 months old. Wage determination (attached) is updated. 27 The RFP indicates 3 separate hats (Super., QCM.,� and SSHO) are required.� This seems excessive for a finishes upgrade and will significantly increase costs.� In some phases, there will be
Who won similar work
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same product/service code (PSC) Z2DA and NAICS 236220.
Single-winner award sizes (4): middle half $1.1M to $3.0M, median $2.0M; range $414K to $3.8M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BLUE CORD DESIGN AND CONSTRUCTION, LLC | 1 | $3.8M | Jul 30, 2026 |
| Yerkes South Inc. | 1 | $2.8M | Aug 24, 2026 |
| DAX SAFETY & STAFFING SOLUTIONS, LLC | 1 | $1.3M | Mar 6, 2026 |
| CONTEGO ENVIRONMENTAL LLC | 1 | $414K | Nov 7, 2024 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Aug 24, 2026Yerkes South Inc.$2.8MZ2DA--RENOVATE PROSTHETICSNo listed company matched (Materiality N/A)
- Jul 30, 2026BLUE CORD DESIGN AND CONSTRUCTION, LLC$3.8MZ2DA--Correct Site Structural DeficienciesNo listed company matched (Materiality N/A)
- Mar 6, 2026DAX SAFETY & STAFFING SOLUTIONS, LLC$1.3MZ2DA--Replace MRI 1.5TNo listed company matched (Materiality N/A)
- Nov 7, 2024CONTEGO ENVIRONMENTAL LLC$414KZ2DA--Helene 1 West Water DamageNo listed company matched (Materiality N/A)
Competitive landscape
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.