Z1DA--631-23-016 Abate Asbestos Renovation 2024
Veterans Affairs · 241-NETWORK CONTRACT OFFICE 01 (36C241)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24124B0054 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
631-23-016 Abate Asbestos Renovation 2024 Site Visit Questions and Answers Q1: Does the VA have a certain sequence for the rooms or are we able to schedule rooms in an order which is most efficient? A1: There is no ordered sequence, however, the VA to have 35 calendar days notice prior to start detailing specific room start dates and finishes. Coordinate with COR. Room 2109 MUST be completely abated during off hours, and over a weekend. Starting FRIDAY 1630 MONDAY 0630. All areas are to be abated off hours. Re-finishing can occur during business hours. Sequencing of room abatement and refinish… (show all)
to be kept to absolute minimum in order for VA to return these spaces to use. Q2: Will the VAIH be able to get TEM results within <12 hours to allow an area to be abated one night and the containment removed the next? A2: Typical wait time for TEM results is 24hrs. This will depend on time of day delivered to lab and day of week. VA not planning on expediting TEMs. Q3: Is the CPIH required to be onsite during the VAIHs clearance collection and during containment removal activities? A3: Yes, CPIH is required to be onsite during all abatement activities see Specification Section 2.2 for the scope of the CPIH. The CPIH is also expected to accompany the VPIH on all visual clearance inspections. Q4: Can B044 and B046 be done together at one time? A4: B044 and B046 can both be completed at the same time. However, the VA planned this to be done as separate containments and would need to be abated that way but can be done at same time. However, VA to have 35 calendar days notice prior to start detailing specific room start dates and finishes. Coordinate with COR. Q5: At B12 Room 7, the door will need to remain open while awaiting the TEM results. Do you require plywood to be secured within the opening for security purposes? A5: The SOW was incorrect in Room Number see attachment B12 Room 004 but correct is Room 4 the landing and room connected to the stairwell. There are three doors so it is expected that the outer door will be able to remain closed during abatement. Decon can go in Room B2 and window opens in B3 and can be used for negative air. Window unit will need to be removed (or moved) potentially so GC to include. Q6: There is no vent location in 2109.� Since this room requires TEM sampling, the containment will have to remain up for at least one daytime shift while the hospital is under operation.� Can we vent through 2108?� Keep in mind this will require HEPA exhaust tubing to be suspended from the ceiling until the containment is removed.� A6: Reference attachment Ventilation in Room 2109 . Depending on when construction starts there are 3x windows that can be used for ventilation, rooms 2129, 2150, and 2152. VA to have 35 calendar days notice prior to start detailing specific room starts and finishes. Room 2109 MUST be completely abated during off hours, over a weekend. Starting FRIDAY 1630 MONDAY 0630. Coordinate with COR. GC will have to remove the whole window unit if they want to use window in room 2108. Q7: Can you please provide the sign in sheet from the site walk? A7: Yes, the sign in sheet is attached. Q8: Is the base to be installed vinyl or carpet?� And it all appeared to be 6", is that correct? A8: Johnsonite 6 height Color: Snow White or equivalent. Supersedes 4 that is in the spec. Q9: Waiting Room 2109 - Where is the closest exhaust/ventilation opening to route negative air? A9: See answer to Q6. Q10: Rooms 1072,1299,1293,2109 - Please confirm that there is tile and mastic under the carpet in these rooms. A10: Based on previous adjacent abatement and homogeneous finish, the above rooms are presumed to have mastic and leveler that need to be abated. Q11: Is the VA carrying a VPM for this off-hour project? A11: The VA is providing a VPIH, the Contractor is responsible for a CPIH. VA will be using Mabbett and Associates Inc for VPIH services. Q12: Who is responsible for paying for the TEM?� A12: VA is paying for the first TEM, contractor is responsible for subsequent TEMs if the first test fails. Q13: Will every room be available during the entire project, or will they be completed in phases? A13: There is no ordered sequence, however, the VA to have 35 calendar days notice prior to start - detailing specific room start dates and finishes. The ability to do multiple spaces will depend on the contractor # of crews, means and methods, and ability to immediately start refinishing after abatement activity. Coordinate with COR. Room 2109 MUST be completely abated during off hours, and over a weekend. Starting FRIDAY 1630 MONDAY 0630. All areas are to be abated off hours. Off Hours considered 1630-0630. Re-finishing can occur during business hours. Sequencing of room abatement and refinish to be kept to absolute minimum in order for VA to return these spaces to use. Q14: Thermoset Rubber base is listed on the Specifications but no brand, color, or Height. Just straight base for carpet and cove for LVT. Most of the rooms have 6-inch base, should we figure for 6-inch base or 4-inch base? A14: See Q8. Q15: Is self-leveling required?� A15: Yes see Spec 09 05 16. Q16: B044 Carpet Tile is Shaw Veil Match Existing Color. What color is the Existing color? A16: Product has been discontinued, replace with Structure 5T297 24 x 24 Q17: Who is responsible for moving furniture? A17: VA will move furniture. Q18: Is there a Wage Determination? A18: The appropriate wage determination is MA20240003 10/11/2024. See Attached. Q19: There is an Above Ceiling Work Permit attached in the solicitation, Does the VA anticipate work to be done above the ceiling? A19: It is not anticipated but if there is any reason for above ceiling work due to means and methods it is there for awareness on procedure. Q20: There is an electrical panel schedule attached to solicitation, does the VA anticipate Electrical work to be done? A20: No there is no anticipated electrical scope for this project. Q21: There is a Mechanical and plumbing system valve charts attached to the solicitation, Does the VA anticipate Mechanical and Plumbing work to be done? A21: No there is no anticipated mechanical or plumbing scope for this project. Q22: There is a hot work permit attached, does the VA anticipate hot work to be done? A22: It is not anticipated but if there is any reason for above ceiling work due to means and methods it is there for awareness on procedure. Q23: Shaw, Veil Carpet Tile, TME is this Shaw, Patcraft, S319V-Veiled? A23: Product has been discontinued, replace with Structure 5T297 24 x 24 Q24: Are transitions required for the new to existing finishes? Please specify. A24: Use Schluter Systems edge protector and profile trim. Select appropriate transition product between flooring. Use Satin Nickle Anodized Aluminum , provide samples with shop drawings.
Who won similar work
9 award notices on SAM.gov in the last 24 months. Matched by: Same office (241-NETWORK CONTRACT OFFICE 01 (36C241)), same product/service code (PSC) Z1DA.
Single-winner award sizes (9): middle half $268K to $3.9M, median $1.8M; range $94K to $5.9M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| AmeriTech Contracting LLC | 1 | $5.9M | Oct 30, 2024 |
| WILLIAMS BUILDING COMPANY | 1 | $4.0M | Jun 27, 2025 |
| Veteran Elevated Solutions, LLC | 1 | $3.9M | Feb 18, 2025 |
| JACKSON RYAN CONSTRUCTION SERVICES, INC. | 1 | $2.4M | Dec 16, 2024 |
| KEE SOLUTIONS LLC | 1 | $1.8M | Nov 5, 2025 |
| IRONCLAD SERVICES INC | 1 | $286K | Jul 23, 2025 |
| DIVERSIFIED SITE SERVICES LLC | 1 | $268K | Sep 19, 2025 |
| VETERANS DEVELOPMENT CORPORATION | 1 | $124K | Nov 13, 2024 |
| N-OVATION TECHNOLOGY GROUP LLC | 1 | $94K | Mar 4, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Nov 5, 2025KEE SOLUTIONS LLC$1.8MZ1DA--402-24-007 B200E Lobby FlooringNo listed company matched (Materiality N/A)
- Sep 19, 2025DIVERSIFIED SITE SERVICES LLC$268KZ1DA--Door Inspection and Repair Service ContractNo listed company matched (Materiality N/A)
- Jul 23, 2025IRONCLAD SERVICES INC$286KZ1DA--405-25-030 WRJ Bldg. 39 Flood Event RepairNo listed company matched (Materiality N/A)
- Jun 27, 2025WILLIAMS BUILDING COMPANY$4.0MZ1DA--523A4-CSI-221 Design Build Naeotom Alpha CTNo listed company matched (Materiality N/A)
- Mar 4, 2025N-OVATION TECHNOLOGY GROUP LLC$94KZ1DA--NextGen WiFi Upgrades 518-24-704No listed company matched (Materiality N/A)
- Feb 18, 2025Veteran Elevated Solutions, LLC$3.9MZ1DA--518-22-111 Elevator Replacement Ph. 3 ConstructionNo listed company matched (Materiality N/A)
- Dec 16, 2024JACKSON RYAN CONSTRUCTION SERVICES, INC.$2.4MZ1DA--650-CSI-351 Renovate Upgrade Angio OR Suite ConstructionNo listed company matched (Materiality N/A)
- Nov 13, 2024VETERANS DEVELOPMENT CORPORATION$124KZ1DA--518-25-303 Bldg #1 Hydrant & Bldg. #6 Waterline Repair Bedford Emergency SDVOSB Sole Source Award IAW VAAR 819.7008No listed company matched (Materiality N/A)
- Oct 30, 2024AmeriTech Contracting LLC$5.9MZ1DA--603-23-133 Third Floor Lab ConstructionNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 1 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (2 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.