Loading the records…
Loading the records…
Air Force and Space Force · FA8128 AFNWC PZN
Air Force and Space Force is planning to buy "Elevon Actuator Controller (EAC) Remanufacture". This is an early notice: it is not taking bids yet. The original due date (Oct 10, 2025) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 4 companies, usually for about $38.8M per award. An award could come any day: the usual time to award has passed.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation FA8128-26-X-XXXX-EAC in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
nt limiting, and buffer circuits to output position, motor current monitor signals and motor voltage monitor signals. The EAC accepts analog voltage inputs proportional to the elevon position command, 28 VDC power, and +- 15 VDC power. The 28 vdc and +- 15 dc grounds are isolated outside of the servo assembly. The FCSA controls the elevon which guides the missile to its intended target. The purpose of this remanufacture effort is to provide a full rate production effort of the remanufactured EACs that meets the original design requirements and all nuclear hardness requirements. The contractor shall be capable of producing 550 remanufactured EACs with the work to include disassembly, cleaning, inspection, assembly, testing, troubleshooting, and root-cause failure analysis to return an unserviceable EAC to a serviceable or like-new condition. The contractor shall be capable of furnishing all labor, materials, facilities, and equipment required to accomplish the remanufacture and all required testing to include functional testing and product reliability verification testing (PRVT). Specifically, the contractor shall be capable of producing EAC-specific test equipment to confirm each produced EAC�s conformance to the requirements of envelope drawing 232-11704. Additionally, the contractor may be responsible for supply chain management, logistics planning, long-lead time parts procurement, diminishing manufacturing sources, and material shortage issues. Throughout this effort, the contractor shall be responsible for refining the remanufacturing procedures and test procedures for the EAC. The Contractor shall be responsible for maintaining configuration changes to the EAC down to the shop replaceable unit (SRU) and component level and updating the technical data package (TDP) accordingly.
4 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Air Force and Space Force), same NAICS 336419.
Single-winner award sizes (4): middle half $22.2M to $71.7M, median $38.8M; range $4.7M to $138.2M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| MARVIN ENGINEERING CO, INC | 1 | $138.2M | May 1, 2026 |
| THE BOEING COMPANY · $BA · $94.9B | 1 | $49.5M | Jul 7, 2026 |
| BK MANUFACTURING CO INC | 1 | $28.0M | Aug 28, 2026 |
| WAVELINK INC | 1 | $4.7M | Jan 21, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
One award's total value against one year of revenue; many awards are paid over several years.
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.