Sources SoughtPosted Sep 23, 2026·Responses due Oct 17, 2026

CFA-686 Carbon-based Fuels Capability - CO2 Storage Vessel

Energy · BATTELLE ENERGY ALLIANCE�DOE CNTR

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
Not stated
Value
Not stated
Solicitation
INL-26-056
Set-aside
None stated
PSC
Not stated
Place
Idaho Falls, ID, USA
Contact
Chase Egbert (chase.egbert@inl.gov)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation INL-26-056 in this department, oldest first.

Early notice
  • Sep 21, 2026
    Sources Sought
    Open
  • Sep 23, 2026 · this notice
    Sources Sought
Solicitation
None posted
Award
Not yet. Typical award: Oct 12, 2026 to Dec 12, 2026, middle of the range Oct 22, 2026.
Measured from 192 past early notices at Energy, Department of that later posted an award (middle half of cases, counted from Sep 21, 2026).
Responses are due Oct 17, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from prospective offerors to support the design, fabrication, testing, and inspection of a pressure vessel for the Central Facilities Area (CFA) Carbon-based Fuels Capability. PROCESS BEA is seeking qualified firms to compete for the design/build contract in support of the CFA-686 CO2 Storage Vessel (V-738). As determined by BEA, responders to this EOI may receive a Request for Proposal (RFP)… (show all)

that will require detailed technical and price proposals be provided for evaluation and ranking under a source selection process. Interested firms are advised that RFP release and the source selection/award decision timeline will be communicated following review of submitted EOIs. The contract award type will be firm?fixed price. The total anticipated duration for completion of all work is 28 weeks ARO, and the estimated sequential schedule is as follows: ASME Code design and analysis (3 weeks), shop fabrication drawings (4 weeks), WPS/PQR submittal and approval (3 weeks), complete shop fabrication including cleaning (25 weeks), install heating elements and insulate vessel (26 weeks), ship vessel to INL (27 weeks), and submission of the final Code Data Report, as?built drawings, and all other deliverables (28 weeks). PROJECT DESCRIPTION The vessel will be designed, fabricated, inspected, and delivered for the INL Central Facilities Area (CFA) Carbon-based Fuels Capability (CFA-686). The vessel, designated V-738, is a 200 cubic foot ASME BPVC Section VIII, Division 1 code "U" stamped pressure vessel for gaseous CO2 service, with a design pressure of 1,800 psig and a design temperature range of -40�F to 500�F. The vessel is a horizontal configuration with two saddle supports spaced 16 feet apart, a 36-inch inner diameter, minimum 2-inch shell thickness, minimum 1-inch hemispherical head thickness, and an overall shell length of 26 feet 3-1/2 inches. The vessel includes seven nozzles (inlet, outlet, five inspection ports, a low point drain, a pressure relief nozzle, and two instrumentation ports), nine band heating elements (3.6 kW total) to maintain the vessel above 150�F, and Foamglas (or equivalent) insulation with protective aluminum sheathing. The vessel will be installed outdoors at INL in a high desert environment, with an altitude of 4,900 ft, ambient temperatures ranging from -40�F to 100�F, and exposure to wind, blowing sand, dust, snow, and frost. The vessel must be designed for static, seismic, and wind loading in accordance with IBC 2024, ASCE 7-10, and ACI 318-19, and fabricated from 304/304L stainless steel pressure boundary materials. Specific fabrication drawings, foundation details, and design calculations will be provided to qualified offerors as part of the RFP process. PROCESS This EOI is the first step in identifying interested and qualified vendors for future solicitation. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested firms are requested to provide expressions of interest to Chase Egbert (chase.egbert@inl.gov) by close-of-business on 10/16/2026. Included must be sufficient written information confirming the responder's qualifications addressing each of the following criteria: Experience in ASME BPVC Section VIII, Division 1 pressure vessel design and fabrication, including possession of a current "U" stamp certificate for both design and fabrication. Experience with stainless steel pressure vessel welding, including full penetration butt welds, 100% radiography, and carbide precipitation control during welding. Capability to meet the design/build schedule outlined above. Capability to fabricate the vessel in the required configuration, including nozzle arrangement, saddle supports, band heating elements, and insulation system. Proper identification and execution plan for inspection, examination, and testing, including hydrostatic testing, positive material identification, liquid penetrant testing, and radiography or phased array ultrasonic testing. Agreement to maintain a written Quality Control System consistent with ASME BPVC Section VIII Division 1, Mandatory Appendix 10. Compliance with ASME BPVC Section VIII Division 1, Mandatory Appendix 47 requirements for pressure vessel design. Availability of a qualified and experienced project manager and Quality Control Manager to oversee the work. Note that responses must be no more than 5 pages in length. Only potentially qualified offerors, as determined by BEA, will receive the RFP for the project. Interested individuals are advised that the selection decision is anticipated in November 2026. If you have questions, need additional information, or need to speak with a BEA Point of Contact, please contact the following via email: Project Manager - Ben Bryson - Benjamin.Bryson@inl.gov Project Engineer - Chris Dudley- Christopher.Dudley@inl.gov Technical questions must be submitted in writing via email.

Who won similar work

834 award notices on SAM.gov in the last 24 months. Match: Same agency (Energy), any industry: a loose match.

Loose match: same agency, any industry. Read the titles before treating these as competitors.

WinnerAwardsValueLast
DH TECHNOLOGIES, INC.16$2.8MSep 29, 2026
VALI COOPER INTERNATIONAL LLC14$37.2MAug 5, 2026
ENERGY BY NATIVE AMERICAN DESIGN CORP11$2.8MJun 2, 2026
RLH INC.11$514KSep 2, 2026
COUNTERTRADE PRODUCTS, INC.11$300KSep 24, 2026
THUNDERCAT TECHNOLOGY, LLC9$3.4MAug 13, 2026
VECTOR RESOURCE INC8$85.9MAug 3, 2026
HUGHES BROTHERS INC8$10.3MAug 20, 2026
Aantilia LLC8$504KSep 24, 2026
SOFTWARE INFORMATION RESOURCE CORP.8$82KJul 27, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Energy, Dept of since 2024 (0 filings)
  • 0 of their lobbyists list a past Energy, Dept of job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 75 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.