Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Army Corps of Engineers · W072 ENDIST PITTSBURGH
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W911WN26QA072 in this department, oldest first.
- Sep 24, 2026 · this noticePre-solicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
PRESOLICITATION NOTICE DISCLAIMER: This document is issued solely for informational and planning purposes as a Presolicitation Notice and does not constitute a Request for Quotation (RFQ), or a promise to issue an award or solicitation in the future. The information and requirements outlined herein are subject to change. Specifications, drawings, schedules, wage rate determinations, and solicitation instructions will be provided upon the official posting of the formal RFQ. 1. Project Overview & Background The Canonsburg-Houston Local Protection Project (LPP) is an authorized federal flood dama… (show all)
ge reduction project spanning over 20,500 linear feet of channel improvements along Chartiers Creek. Originally constructed by USACE in two phases (Houston unit completed in 1970; Canonsburg unit completed in 1976), operation and maintenance responsibilities were subsequently transferred to Washington County. Severe storm events resulted in substantial damage to the channel embankment along the right bank of Chartiers Creek, including displacement of stone protection and loss of subgrade stabilization. This rehabilitation contract encompasses repair and re-armoring of the degraded channel reach to restore federal project integrity and design conveyance capacity. The Anticipated Cost of Construction is between $150,000.00 and $300,000.00. The project is to be completed within 120 Calendar Days after written Notice to Proceed (NTP). 2. Technical Scope of Work & Execution Limits The contractor must furnish all management, supervision, labor, heavy equipment, materials, water control, and environmental controls necessary to execute the repairs. Repair Reach Limits: Repair work is concentrated along the right bank of Chartiers Creek between approximate stations STA 164+00 and STA 166+50. Site Access & Clearing: Access to the creek channel will be achieved from the left bank access ramp near STA 163+00. The ramp requires clearing of dense brush and vegetation in strict accordance with PennDOT Publication 408, Section 201. Geotextile Underlayment: Existing geotextiles within the damage limits are assumed damaged and must be excavated and replaced. The contractor must furnish and place Class 4, Type A non-woven geotextile fabric conforming to PennDOT 408 Section 735. Panels must be placed over prepared, compacted subgrade with a minimum 18-inch overlap, placing upstream panels over downstream panels. Stone Protection (R-5 Riprap): Riprap protection will be restored using PennDOT R-5 stone (minimum 1�-6� layer thickness) conforming to PennDOT 408 Section 850 and ASTM D5519. Stones must be placed with zero free fall and a maximum drop height not exceeding 12 inches to prevent fabric puncturing and stone segregation. Hand or mechanical rearrangement is required to achieve a dense, evenly graded mass free of stone clusters or void pockets. Temporary Water Diversion & Dewatering: In-channel work must be performed in completely dewatered conditions. The contractor is responsible for the complete engineering, installation, continuous pumping/diversion, maintenance, and final removal of a temporary water diversion system. All pumped effluent must pass through certified sediment/debris control devices prior to discharge back into the creek. Removed streambed material must be stockpiled and replaced upon completion. Demolition & Waste Disposal: Damaged geotextile, dead vegetative matter, and unserviceable excavated fill must be excavated, loaded, and disposed of off-site at a commercially permitted landfill or recycling facility in accordance with PADEP 258-2182-773 (Management of Fill). 3. Key Personnel & Qualification Thresholds On-site supervisory staff must satisfy strict USACE qualifications and maintain designated physical presence: Project Superintendent: Minimum of 5 years of construction experience, including at least 5 years serving as superintendent on comparable earthwork and channel restoration projects. Must possess demonstrated proficiency in USACE EM 385-1-1 safety compliance and hazard mitigation. Dedicated role; cannot serve concurrently as the QCSM or SSHO. Contractor Quality Control System Manager (QCSM): Minimum of 5 years of construction experience on similar stream restoration and civil earthwork projects. Must be directly employed by the prime contractor and hold a valid Construction Quality Management for Contractors (CQM-C) certification issued by USACE/NAVFAC. Required to be on site at all times during construction activities. Site Safety and Health Officer (SSHO): Must meet Level 1 SSHO qualifications outlined in EM 385-1-1 (2024 edition) and be formally designated via ENG Form 6282. Full-time responsibility reporting directly to a corporate officer; must be on-site whenever active operations occur. Dual-Hat Allowance: The SSHO may concurrently serve as the QCSM (provided all CQM-C requirements are satisfied) but cannot serve as the Project Superintendent. Safety Compliance: Safety Compliance (EM 385-1-1): Offerors are advised that all work on this project must strictly comply with the latest edition of the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1) (Link: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf). Prior to commencing work, the contractor must submit and secure Government approval for a site-specific Accident Prevention Plan (APP) and comprehensive Activity Hazard Analyses (AHAs). 4. Key Performance Constraints & Operational Rules 25-Foot Embankment Exposure Limit: To prevent catastrophic washout during sudden high streamflows, the contractor must limit stripped subgrade or exposed geotextile fabric to maximum 25-foot linear sections, or lengths that can be fully backfilled and armored with R-5 riprap within the same working shift. Embankments covered solely by geotextile fabric are formally classified as unprotected. NWS Weather Monitoring & High-Water Action Thresholds: The contractor must continuously monitor National Weather Service (NWS) hydrologic forecasts for the Chartiers Creek tributary basin. Upon the issuance of any NWS Flash Flood Watch or Flash Flood Warning, all in-channel operations must be immediately suspended, equipment evacuated to high ground, and incremental work secured. Protection of Incremental Work: Work must be sequenced so that initiated features can be completed, stabilized, or protected prior to forecasted high-water events. Any equipment, materials, or partially installed work damaged by stream currents or inadequate water diversion must be replaced at the contractor�s expense. 5. General Information The North American Industrial Classification Code (NAICS) is 237990 � Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The solicitation will be issued on or about 9 October 2026, via the Procurement Integrated Enterprise Environment (PIEE), which posts the opportunity to SAM.gov. The anticipated award date is 13 November 2026. The basis of award will be of best value to the Government. Basis of Award is best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO 12.203(a), price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Small Business Contractors are advised that APEX Accelerators provide free, expert assistance to small businesses interested in competing for federal, state, and local government contracts. Small businesses are strongly encouraged to connect with their local APEX Accelerators to leverage these valuable services. The APEX Accelerators Website is: https://www.apexaccelerators.us/#/. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adj
Who won similar work
13 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 237990.
| Winner | Awards | Value | Last |
|---|---|---|---|
| C. J. MAHAN CONSTRUCTION COMPANY | 2 | $22.3M | Jan 30, 2026 |
| ALLTECH ENGINEERING CORP | 2 | $15.2M | Sep 25, 2026 |
| MAVERICK CONSTRUCTION LLC | 2 | $621K | Sep 4, 2026 |
| SAF INC | 1 | $10.6M | Apr 6, 2026 |
| SIEVERT ELECTRIC SERVICE AND SALES COMPANY | 1 | $6.9M | Jul 15, 2025 |
| EARTHMOVERS UNLIMITED INC | 1 | $5.6M | Jul 15, 2025 |
| MARION HILL ASSOCIATES, INC | 1 | $3.6M | Jul 15, 2025 |
| GFM PARTNERS LLC | 1 | $1.5M | Mar 20, 2025 |
| GALE CONSTRUCTION COMPANY | 1 | $899K | Jul 15, 2025 |
| BRANNON CONTRACTING & MAINTENANCE SERVICES, LLC | 1 | $153K | Aug 20, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 25, 2026ALLTECH ENGINEERING CORP$4.1MConemaugh Dam Gantry Crane Machinery Housing Roof Replacement
- Sep 4, 2026MAVERICK CONSTRUCTION LLC$329KCrooked Creek Jib Crane Work Platform and Safety Updates
- Aug 20, 2026BRANNON CONTRACTING & MAINTENANCE SERVICES, LLC$153KTionesta Dam Control Tower Concrete Repair
- Apr 6, 2026SAF INC$10.6MBraddock Locks and Dam Hydraulic System Upgrades
- Jan 30, 2026C. J. MAHAN CONSTRUCTION COMPANY$13.6MEmsworth and Dashields Locks and Dam Tow Haulage System Replacement Project
- Jul 29, 2025MAVERICK CONSTRUCTION LLC$292KTionesta Lake Jib Crane Work Platform and Safety Updates
- Jul 15, 2025SIEVERT ELECTRIC SERVICE AND SALES COMPANY$6.9MGantry Cranes Rehabilitation at Loyalhanna River Lake
- Jul 15, 2025MARION HILL ASSOCIATES, INC$3.6MDashields Locks and Dam Upper Guide Wall Stabilization
- Jul 15, 2025C. J. MAHAN CONSTRUCTION COMPANY$8.6MReplace Back Channel Hydraulic Dam Gate Cylinders
- Jul 15, 2025EARTHMOVERS UNLIMITED INC$5.6MCity of Johnstown FY24 Sediment Removal and Concrete Repairs
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.