USCGC HEALY CO2 Pull System Upgrade
Coast Guard · SFLC PROCUREMENT BRANCH 2(00085)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 70Z08526Q0028325 in this department, oldest first.
- Sep 21, 2026 · this noticeCombined Synopsis/Solicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire … (show all)
Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment. 3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on 31 Oct 2026. 3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at Coast Guard Base Seattle 3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best routing for the new pull cables. The Generator rooms have many interferences to consider during the planning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested contractors must contact the POC's to coordinate a ship's visit. 3.8 Ship-check will be at no cost to the government. Points of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil). WORK ITEM 1: Fire Pull, Replace 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls connecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1 (1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the CO2 Room (1-65-1-K) 1.2 Government-furnished property. None 2. REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams Coast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods Coast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts & Dets Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure Carbon Dioxide Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures OTHER REFERENCES None 3. REQUIREMENTS CLIN 001 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified distributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the following on site: . Provide manufacturer's proprietary system/ equipment information, software, and tools. . Assist with installation and testing of the equipment/system. . Ensure compliance with manufacturer's procedures and standards during system installation and testing. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated it on their r�sum�. 3.1.2.2 Submit the name and r�sum� of the Tech Rep with the solicitation response. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below: . Decks . Bulkheads . Machinery . Insulation/lagging . Piping . Monorail trolley system . Lighting . Wiring NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 Operational test - initial. Prior to commencement of work, in the presence of the Engineering Officer or their designee the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.3 Pull Station Plan. The Contractor must provide the following information with the solicitation: . An approximated route for the new pull station cables. This can be neatly hand-drawn on a copy of CG Drawing 420-WAGB-079-002, 420-WAGB-801-001, or with marked up photographs. . An estimate for the number of corner pulleys and their locations. . The make, model, and location of the new pull devices located in the ECC. . The make, model, and location of any new dual pull mechanisms. 3.4 Existing Pull Station Rip-out. The Contractor must remove and dispose of the two existing ECC Generator #1 and #2 pull stations, their associated conduit, cable, and corner pulleys up to the Dual Pull Mechanism for the Control Heads and Control Stop Valves. Some of the conduit may be reused. 3.4.1 Any penetrations through decks or bulkheads, where the penetration will no longer be used, must be cut to within six inches of the bulkhead/deck and have a cap or plug welded on either side of the penetration in accordance with SFLC Std Spec 0740. 3.5 Pull Station Install. The Contractor must install the new ECC pull stations for Generator Room #1 & #2, all conduit, cables and corner pulleys to their associated Dual Pull Mechanism in accordance with TP 5207. Deviations from the plan submitted in the solicitation must be approved by the Coast Guard. 3.5.1 The Contractor must adhere to the maximum corner pulley and cable limitations outlined in TP 5207. 3.6 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this work item using one of the methods described in SFLC Std Spec 0740, Appendix C in the presence of the Engineering Officer or their designee. 3.7 Operational test � post repairs. After completion of work, in the presence of the Engineering Officer or their designee the Contractor must observe a test of all shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. 3.7.1 Demonstrate that the pull station will activate the CO2 bottle. If the force required for activation exceeds 40 lbs., the contractor must adjust the system until a satisfactory pull force is reached. 3.7.2 Perform a test of the discharge indicating panels located in ECC (01-105-0-C). 3.7.3 Ensure the CO2 system for both generator rooms is fully functional in all modes of activation. 3.8 The Contractor must repair/replace any damaged insulation in accordance with CG Drawing 420- WAGB-635-001. 3.9 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.) 4. Period of Performance (POP) 01 Oct 26 - 31 Oct 2026. All work to be performed at cutter's homeport in Seattle W
Who won similar work
6 award notices on SAM.gov in the last 24 months. Matched by: Same office (SFLC PROCUREMENT BRANCH 2(00085)), same product/service code (PSC) J020.
Single-winner award sizes (6): middle half $15K to $38K, median $26K; range $9K to $1.1M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Colonna's Ship Yard, INCORPORATED | 1 | $1.1M | Jun 4, 2025 |
| ROLLS-ROYCE SOLUTIONS AMERICA INC | 1 | $41K | Jul 16, 2025 |
| HIGHMARK MARINE FABRICATION LLC | 1 | $30K | Apr 8, 2025 |
| HONOLULU COMMERCIAL CARPET CLEANING LLC | 1 | $23K | Jul 14, 2026 |
| NRC ENVIRONMENTAL SERVICES INC. | 1 | $13K | Jan 23, 2025 |
| DEFENSE MARITIME SOLUTIONS Chesapeake VA 23323 USA | 1 | $9K | May 5, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Jul 14, 2026HONOLULU COMMERCIAL CARPET CLEANING LLC$23KCGC KIMBALL BILGE CLEANINGNo listed company matched (Materiality N/A)
- Jul 16, 2025ROLLS-ROYCE SOLUTIONS AMERICA INC$41KCGC Stratton NR2 MDE Governor MTUNo listed company matched (Materiality N/A)
- Jun 4, 2025Colonna's Ship Yard, INCORPORATED$1.1MPropulsion Shaft Inspection and PreservationNo listed company matched (Materiality N/A)
- May 5, 2025DEFENSE MARITIME SOLUTIONS Chesapeake VA 23323 USA$9KHAMILTON RUDDER SEALSNo listed company matched (Materiality N/A)
- Apr 8, 2025HIGHMARK MARINE FABRICATION LLC$30KUSCGC Alex Haley Diver Support for FM Pipe RepairsNo listed company matched (Materiality N/A)
- Jan 23, 2025NRC ENVIRONMENTAL SERVICES INC.$13KCGC MUNRO - Oily Waste Offload (over the water)No listed company matched (Materiality N/A)
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied U.S. Coast Guard (USCG) since 2024 (0 filings)
- 0 of their lobbyists list a past U.S. Coast Guard (USCG) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 433 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.