Notice of Intent to Sole Source to Port of Portland - Columbia & Lower Willamette Rivers Pipeline Dredging
Army Corps of Engineers · W071 ENDIST PORTLAND
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
This notice has no solicitation number, so earlier and later notices cannot be tied to it.
- Jul 28, 2026 · this noticeSpecial Notice
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
THIS IS A SPECIAL NOTICE PREPARED IN ACCORDANCE WITH REVOLUTIONARY FAR OVERHAUL (RFO) PART 5, �PUBLICIZING CONTRACT ACTIONS� NAICS: 237990 Estimated Contract Start Date: 30 September 2027 Response Deadline: 12 August 2026 The U.S. Army Corps of Engineers (USACE), Portland District (NWP) intends to negotiate and award a sole-source, cost (no-fee) Indefinite Delivery/Indefinite Quantity (IDIQ) construction contract to the Port of Portland (UEI: HX4FCHE2H1M3, CAGE: 3DWW7). The anticipated contract consists of a five-year base period and one five-year option period (10-year total ordering period) … (show all)
with an estimated ceiling of $499M. The scope of work encompasses pipeline dredging operations, material placement, placement site preparation, and related channel maintenance activities in support of the Columbia and Lower Willamette (C&LW) Navigation Project. The requirement entails the annual dredging of approximately 2.5 million to 4 million cubic yards of material between 1 June and 31 December from the deep draft navigation channel between river mile 20+00 and 105+25, maintaining authorized depths of 43 to 48 feet Columbia River Datum (CRD). Upland placement of material is also required. Additional information is available in the prior sources sought announcement. Additionally, availability for out-of-season emergency dredging response is required. Therefore, the full pipeline dredging operation will need to remain proximal to the C&LW Navigation project year-round. If it becomes necessary, recapitalization of the Dredge OREGON would be within the scope of this contract. PRIOR SOURCES SOUGHT (DFARS PGI COMPLIANCE): In accordance with DFARS PGI 206.302-1, a Sources Sought announcement was posted to SAM.gov on January 8, 2026, to conduct market research and gauge industry capability prior to executing a sole-source justification. While response from firms was received, a review of the capability statements confirmed that no comparable large-capacity pipeline dredge and support equipment is currently homeported in the Columbia River system; a major driver of the higher anticipated price from sources other than the Port of Portland. By majority, respondents also indicated that they would not intend to leave a plant and equipment idle during the off season. While this is not in line with the current contract requirement, we recognize the benefit to USACE and the Nation by allowing a plant to address other dredging requirements outside the regular C&LW dredging season. As result, USACE chose to analyze the cost of this annual mob/demob alternate strategy alongside the intended idle/available strategy currently required. REASON FOR SOLE SOURCE ACQUISITION: The statutory authority for this non-competitive acquisition is 10 U.S.C. � 3204(a)(1) as implemented by Revolutionary FAR Overhaul (RFO) 6.103-1(c)(2)(i), "Substantial duplication of cost to the Government that is not expected to be recovered through competition." The Port of Portland is the only source that possesses a large-capacity pipeline dredge (Dredge OREGON) permanently homeported within the Columbia River system capable of meeting USACE�s annual production requirements. Furthermore, USACE possesses explicit Congressional authorization to contract with the Port of Portland for these services on a reimbursable, cost (no-profit) basis. The Port of Portland C&LW Pipeline Dredging FY25 cost (roughly $25M) was used as the baseline for accomplishing a standard/average season of work. USACE estimates that should Port of Portland recapitalize the Dredge Oregon, the amount allocable to USACE annually would be roughly $7.5M once the vessel is put into service. In comparison, awarding to an alternate source is expected to increase the cost to accomplish the work in two primary categories, depending on the final contract requirements. Dredging. It is expected the price to dredge and place 2.5 million to 4 million cubic yards of material would be between $41M and $52M, over the 7-month period. This price includes upland placement where required, and in-system remobilizations. The price for the plant and equipment to remain �idle� the remaining 5-months of the year is incorporated in the $41M to $52M estimate. Mobilization, demobilization and idle/standby time. Strategy A: Mobilizing once and maintaining the plant and equipment in proximity to the C&LW at all times. It is expected a single mobilization (~$7M) and demobilization (~$5.5M) for the 10-year contract would cost in excess of $10M for all plant and equipment. Strategy B: Annual mobilization/demobilization to accomplish other work. It is expected that by allowing a firm to demobilize after each dredging season, the cost of remobilization the following season would be roughly similar to the price USACE would otherwise pay for the plant and equipment to remain idle with the C&LW area. USACE would then not have a plant to quickly mobilize for urgent dredging requirements during the 5-month �off-season� though, which is not an allowable risk, or aligned with current project requirements. Regardless of the strategy used, significant duplication of cost remains. Even when combining the Port of Portland�s standard season baseline ($25M) with the potential (not yet approved) annual recapitalization allocation ($7.5M), the total estimated annual cost to the Government remains approximately $32.5M. In contrast, the lowest possible commercial alternative, combining the $41M dredging floor with an initial ~$7M for mobilization cost, is approximately $15M more than what USACE expects to pay to Port of Portland. Therefore, awarding to an alternate source would result in a minimum duplication of cost of $15M the first year, and approximately $8.5M per year afterward, plus ~$5.5M in demobilization costs following the final year of dredging. Over the anticipated 10-year lifecycle of this IDIQ, this represents at least $97M in duplicated costs that the Government does not expect to recover through competition. The Government intends to begin negotiations with Port of Portland on or around 1 November 2026. At this time, a solicitation does not exist. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. NO PHONE INQUIRIES, PLEASE. CAPABILITY STATEMENT SUBMISSION REQUIREMENTS (PLEASE REVIEW ALL BELOW) Point of Contact name, email address and phone number, CAGE code and UEI number (if available); In the event that the organization is a small business, please state the category of small business, such as 8(a), HUBZone, SDVOSB/VOSB, Women-Owned Small Business; The Government will evaluate the capabilities of an interested party based on their ability to perform the above-described dredging services without creating a substantial duplication of cost to the Government. Submissions must explicitly detail how the firm intends to be price competitive with the cost (no-fee) mechanism available through Congressional authorization to contract directly with Port of Portland. Email responses with subject line, "PANNWD-26-P-0000-028896 � C&LW Pipeline Dredging Notice of Intent" to the contacts listed in this notice.
Who won similar work
19 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 237990.
| Winner | Awards | Value | Last |
|---|---|---|---|
| HME CONSTRUCTION INC | 4 | $30.4M | Jul 31, 2026 |
| MANSON CONSTRUCTION CO Seattle WA 98134 USA | 2 | $72.6M | Mar 25, 2026 |
| ANVIL BUILDERS INC | 1 | $35.9M | Feb 2, 2026 |
| Odin Environmental Solutions, LLC | 1 | $29.0M | Feb 2, 2026 |
| ORION GOVERNMENT SERVICES LLC · $ORN | 1 | $26.7M | Sep 11, 2026 |
| SIEVERT ELECTRIC SERVICE AND SALES COMPANY | 1 | $21.6M | Aug 4, 2026 |
| BIG RIVER CONSTRUCTION INC | 1 | $18.5M | Aug 21, 2026 |
| ADVANCED AMERICAN CONSTRUCTION, INC. | 1 | $18.0M | Oct 24, 2024 |
| SNC CORE JV, LLC | 1 | $6.6M | Oct 10, 2025 |
| SUULUTAAQ, INC. | 1 | $3.0M | Sep 24, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 11, 2026T1 CONSTRUCTION LLC$761KDetroit Dam Interim Regulating Outlet Repairs - Award Notice
- Sep 11, 2026ORION GOVERNMENT SERVICES LLC$26.7MAward Notice - MOUTH OF THE COLUMBIA RIVER - NORTH JETTY MAJOR MAINTENANCE - PHASE II -
- Aug 21, 2026BIG RIVER CONSTRUCTION INC$18.5MMILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS
- Aug 4, 2026SIEVERT ELECTRIC SERVICE AND SALES COMPANY$21.6MBONNEVILLE SPILLWAY GANTRY CRANE REHABILITATION
- Jul 31, 2026HME CONSTRUCTION INC$13.0MOregon/Washington Clamshell Maintenance Dredging 2026
- Jun 18, 2026DIXON MARINE SERVICES, INC.$1.8MGaribaldi Depoe Bay Pipeline Dredging 2026
- Jun 17, 2026HME CONSTRUCTION INC$8.0MCottonwood Pile Dike Repairs
- Mar 25, 2026MANSON CONSTRUCTION CO Seattle WA 98134 USA$39.8MWest Coast Hopper Maintenance Dredging 2026
- Feb 2, 2026Odin Environmental Solutions, LLC$29.0MMount Saint Helens - Sediment Retention Structure Crest Raise
- Feb 2, 2026ANVIL BUILDERS INC$35.9MMount Saint Helens - Sediment Retention Structure Crest Raise
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 1 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.