- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling… (show all)
Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.
Who won similar work
8 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 237990.
| Winner | Awards | Value | Last |
|---|---|---|---|
| GREAT LAKES DREDGE & DOCK CO, LLC | 1 | $69.5M | Sep 15, 2026 |
| Mohawk Northeast, Inc | 1 | $24.4M | Jan 22, 2026 |
| AGATE CONSTRUCTION COMPANY | 1 | $10.6M | Feb 25, 2026 |
| MANSON CONSTRUCTION CO Seattle WA 98134 USA | 1 | $2.9M | Sep 9, 2026 |
| AGM MARINE CONTRACTORS INC | 1 | $2.1M | Feb 6, 2026 |
| PONTIAC DRYWALL SYSTEMS INC. | 1 | $1.2M | Jul 11, 2025 |
| BUILDING INNOVATORS LLC | 1 | $1.1M | Feb 15, 2025 |
| JP SOLUTION LLC | 1 | $12K | Jul 8, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 15, 2026GREAT LAKES DREDGE & DOCK CO, LLC$69.5MNew Haven Harbor Improvement Dredging, New Haven, CT
- Sep 9, 2026MANSON CONSTRUCTION CO Seattle WA 98134 USA$2.9MMaintenance Dredging, Kennebec River, Kennebec Maine
- Jul 8, 2026JP SOLUTION LLC$12KDrainage Basin Installation, Mansfield Hollow Dam, Mansfield, CT
- Feb 25, 2026AGATE CONSTRUCTION COMPANY$10.6MConstruction Services for Bar Harbor Breakwater Repair Project, Bar Harbor, Maine
- Feb 6, 2026AGM MARINE CONTRACTORS INC$2.1MMaintenance Dredging, Wareham Harbor, Wareham, MA
- Jan 22, 2026Mohawk Northeast, Inc$24.4MConstruction of a Spur Jetty at Camp Ellis Beach in Saco, Maine
- Jul 11, 2025PONTIAC DRYWALL SYSTEMS INC.$1.2MBulkhead Replacement to Support the Raymark Superfund Site Remediation in Stratford, Connecticut
- Feb 15, 2025BUILDING INNOVATORS LLC$1.1MConcrete Repairs, Blackwater Dam, Webster, NH
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.