SolicitationPosted Oct 16, 2026·Responses due Oct 27, 2026

Airfield Blast Shield

Air Force and Space Force · FA4661 7 CONS CD

Stage
Open solicitation
NAICS
238120
Value
Not stated
Solicitation
FA466126R0008
Set-aside
Small Business Set Aside - Total
PSC
Y1BZ
Place
Dyess AFB, TX, USA
Contact
James Lynch (james.lynch.18@us.af.mil)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation FA466126R0008 in this department, oldest first.

Early notice
  • Aug 5, 2026
    Sources Sought
    Open
  • Aug 7, 2026
    Sources Sought
    Open
  • Aug 18, 2026
    Pre-solicitation
    Open
Solicitation
  • Sep 18, 2026
    Solicitation
    Open
  • Oct 13, 2026
    Solicitation
    Open
  • Oct 16, 2026 · this notice
    Solicitation
Award
Not yet. Typical award: Oct 17, 2026 to Dec 11, 2026, middle of the range Nov 9, 2026.
Measured from 688 past solicitations at Dept of the Air Force that later posted an award (middle half of cases, counted from Sep 18, 2026).
Responses are due Oct 27, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Amendment 0002 (16 Oct 2026) The purpose of this amendment is to: 1. Incorporate the attached Questions and Answers (Q&A) document providing Government responses to submitted solicitation questions. 2. All other solicitation requirements remain unchanged and in full effect. Amendment 0001 (13 Oct 2026): The purpose of this amendment is to 1. Extend the Proposal Due Date to 27 October 2026. 2. All other solicitation requirements remain unchanged and in full effect. 1.1 PROJECT DESCRIPTION: 1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, material… (show all)

s, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL�s), and all applicable Federal, State and local regulations/codes. 2.1 GENERAL: 2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be considered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors may be considered provided the drawings and specifications of alternate types are approved by Contracting Officer. The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast fence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ? velocity @ 900 MPH. 2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. 2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area, the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. 2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size. 2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. 3.1 BLAST DEFLECTOR CONTRUCTION: 3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and prefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum of 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches curbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range. 3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts, shall be made of all-steel, self-locking type. 4.1 BLAST DEFLECTOR ANCHORAGE 4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16�. Lynnco "Epoxy-Locked" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast deflectors. 5.1 BLAST DEFLECTOR ASSEMBLY: 5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing or burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer. 6.1 BLAST DEFLECTOR FINISH: 6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural members, parts, and corrugated metal will be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized surfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise repaired to the satisfaction of the Contracting Officer. 6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors. The Contactor shall provide a 2�x2� number sign mounted 15� above the concrete at the midpoint on the backside of the blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings. 7.1 BLAST DEFLECTOR ALTERNATIVES: 7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an alternate type of blast deflector, providing that the following information and data is submitted, prior to the time of bid opening and approved in writing. 7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and certified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power of similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the deflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi, temperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of blast impingement on deflector. The results of all such readings may not be greater than the readings submitted for the specified deflector, for each corresponding item. 7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and gases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors. 7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for continued testing of similar aircraft and jet engines. 7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting surface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load calculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to blast temperatures. 7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors may not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.

Who won similar work

30 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Air Force and Space Force), same industry group (NAICS 2381).

Single-winner award sizes (30): middle half $107K to $2.0M, median $260K; range $20K to $450.0M.

WinnerAwardsValueLast
JAXON CONSTRUCTION INC3$988KSep 21, 2026
STG PACIFIC, LLC2$5.3MSep 25, 2026
TRUMBLE CONSTRUCTION LLC2$4.2MJul 1, 2026
T & T CONSTRUCTION ENTERPRISES, LLC2$2.0MSep 30, 2026
Enzo Group LLC2$367KAug 1, 2025
STONEWING BUILDERS, INC2$49KJun 3, 2025
See Description Details JBSA Lackland TX 78236 USA1$450.0MJul 13, 2026
PER AARSLEFF GRONLAND APS Nuuk 3900 GRL1$5.6MJul 29, 2025
CONSOLIDATED ENTERPRISES INC1$3.1MSep 25, 2026
CFF CONSULTING INC.1$2.6MMay 15, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Air Force, Dept of since 2024 (0 filings)
  • 0 of their lobbyists list a past Air Force, Dept of job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.