SolicitationPosted Feb 12, 2025·Responses due Mar 14, 2025

Z2JZ--Jefferson Barracks St Louis Completion Contract

Veterans Affairs · OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)

Stage
Open solicitation
NAICS
238910
Value
Not stated
Solicitation
36C10F24R0098
Set-aside
None stated
PSC
Z2JZ
Place
Not stated
Contact
Gary L Fowler (gary.fowler@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C10F24R0098 in this department, oldest first.

Early notice
  • Sep 6, 2024
    Pre-solicitation
    Open
  • Jan 15, 2025
    Pre-solicitation
    Open
Solicitation
  • Jan 15, 2025
    Solicitation
    Open
  • Jan 16, 2025
    Solicitation
    Open
  • Feb 10, 2025
    Solicitation
    Open
  • Feb 12, 2025 · this notice
    Solicitation
  • Mar 7, 2025
    Solicitation
    Open
Award
  • Aug 20, 2025
    Award Notice
    RANDY KINDER EXCAVATING INC · $3.7M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

SCHEDULE OF CONTRACT LINE ITEMS AND PRICES/COSTS STL JV VAMC Completion List Project In accordance with the Request For Proposal, the contract drawings and specifications and amendments to either, the work of each Contract Line Item as defined herein in general terms includes, but is not limited to, provision of all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and performance of all construction services and incidental related work for completion of fully functional, integrated and operational site improvements. I… (show all)

tem No. 1: Add electrical power to steam manholes 4, 5, and 6 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 1: $ __________________________ Item No. 2: Reconnect/Replace Ballard lights at Fisher House. Investigate the lighting circuits and restore the operation of the exterior bollard lights using new 36 inch tall light bollard and new concrete bases where the existing bollard are located around the Fisher House. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 2: $ __________________________ Item No. 3: Replace water supply to Fisher House GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 3: $ __________________________ Item No. 4: Reconnect/Replace Ballard lights at Fisher House GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 4: $ __________________________ Item No. 5: Replace watermain dead leg southeast of Building 1 and Item No. 10: Change the direction of the fire hydrant east of the Building 53 loading dock GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 5 & 10: $ __________________________ Item No. 6: Add toe rail on all handrail south of Building 1 and add new handrail and toe rail north of Building 56 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 6: $ __________________________ Item No. 7: Replace east sidewalk south of Building 1 that does not meet VA standards for slope GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 7: $ __________________________ Item No. 8: Replace curb islands on either side of the handicap parking spaces south of Building 1 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 8: $ __________________________ Item No. 9: Repair/regrade asphalt around water main valve GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 9: $ __________________________ Item No. 10: See Item No. 5 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 10: $ __SEE Item No. 5___________ Item No. 11: Clean under grate and clean silt out of high voltage electrical manhole GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 11: $ _________________________ Item No. 12: Add photocell pedestal controller for B54 exterior lights GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 12: $ _________________________ Item No. 13: Enlarge mulch area or install new mulch area around light fixtures in the west campus areas GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 13: $ _________________________ Item No. 14: Install new metal edging, removed existing sod, and install new mulch around flag pole bases and their inground light bases GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 14: $ _________________________ Item No. 15: Mill and overlay asphalt pavement approximately 660 LF and selectively replace deteriorated concrete curb and gutter in this location GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 15: $ _________________________ Item No. 16: Remove two large trees in the west campus area north of the north entrance road GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 16: $ _________________________ Item No. 17: Add photocell controller to the west campus area exterior lighting GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 17: $ _________________________ Item No. 18: Provide 100 customizable memorial pavers in the existing memorial band of pavers in the west campus area GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 18: $ _________________________ Item No. 19: Remove vegetation existing aggregate base and install new anti-vegetation mat and aggregate base at the top of the cast-in-place retaining wall GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 19: $ _________________________ Item No. 20: Replace existing underground steam line and condensate lines under the asphalt at the Building 24 loading dock GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 20: $ _________________________ Item No. 21: Excavate steam pipe thrust block on new steam manhole 5 and steam manhole 6, take compaction and soil bearing measurements, backfill and restore excavated areas GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 21: $ _________________________ Item No. 22: Construct access roadway/walkway path to existing steam manhole at the southeast corner of Building 57 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 22: $ _________________________ Item No. 23: Not Used GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 23: $ ____Note Used ____________ Item No. 24: Install new detector loops and new conduits and restore operations to the Building 57 vehicle double gates GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 24: $ _________________________ Item No. 25: Not Used GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 25: $ ____Not Used _____________ Item No. 26: Inside the mechanical room remove silt from the pipe chase pit, reseal the two steam pipe wall penetrations from the inside, replace the steam pit floor drain cover, excavate the stem pipe wall penetrations from outside building 52 and re-seal the penetration from the outside, backfill and restore the excavation area. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 26: $ _________________________ Item No. 27: Add galvanized steel support brackets in the new steam manholes under each end of the center lid support beam. Repair concrete where cracked around the lid center beam connect points. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 27: $ _________________________ Item No. 28: Replace chilled water pipes in chilled water pipe manhole No. 25 which is north of Building 23. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 28: $ _________________________ Item No. 29: Demolish the top of three existing and abandoned steam manholes to 24 inches below existing finish grade, abate and remove the steam pipes in the manholes to 1 ft. inside the connecting underground pipe chases, fill the openings with CMU block walls, fill the now empty manhole with clean aggregate from the bottom of the manhole to 24 inches below finish grade to prevent future settlement, backfill on top of the clean aggregate with clean dirt to 4 inches below subgrade, backfill with 4 inches of tope soil and install sod at finish grade. One manhole will receive an aggregate base in lieu of sod and top soil where it sets in an existing aggregate parking area. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 29: $ _________________________ Item No. 30: Re-install 40 LF of ornamental

Who won similar work

6 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Veterans Affairs), same product/service code (PSC) Z2JZ.

Single-winner award sizes (6): middle half $167K to $658K, median $480K; range $80K to $5.5M.

WinnerAwardsValueLast
BP CONSTRUCTION JV LLC1$5.5MNov 21, 2024
KOALA ROOFING LLC1$669KMar 26, 2026
VALCORP ENTERPRISES LLC1$625KAug 24, 2026
BKM CONSTRUCTION LLC1$334KSep 23, 2026
Range Services, LLC1$112KMar 4, 2026
RYDVET LLC1$80KMar 20, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.