Z2DA--Replace Water Heater and Boilers Out Buildings
Veterans Affairs · 257-NETWORK CONTRACT OFFICE 17 (36C257)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25726Q0786 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
36C25724R0077 0001 Replace Boilers and Boiler Plant Page 2 of 2 Questions and Answers SF 1442 / Box 13.d. / Calendar days for Government Acceptance: This box is currently blank. Please provide the number of calendar days for which the Offeror must hold pricing. Government answer: 90 calendar days. Solicitation Page 6 of 68 / A.4 Evaluation: The solicitation states that signatures must be "manually signed ( wet signature )." With this being an emailed submission, please advise if electronic signatures and signature stamps in PDF are acceptable. Government answer: Wet signature required. Solicit… (show all)
ation Page 7 of 68 / c. Content Requirements / Table: Will a Table of Contents and Tab Page(s) count against the 20-page limit for Volume I - Past Performance? Government answer: Yes it counts against the 20-page limit. Solicitation Pages 8-9 of 68 / Volume I - Past Performance Submission Requirements: Are PPQs required? A PPQ form was included as an attachment (Attachment 9) but not specified as a requirement in the Submission Requirements. Please advise. Government answer: PPQs are required. Solicitation� Pages 10-11 of 68: The Solicitation states that "Offerors shall provide the Contracting Officer confirmation of the bid bond delivery via email... prior to the closing date/time." As far as we understand it, only an electronic version of the Bid Bond submitted via email as part of the Volume II - Price proposal is required, but this statement alludes to the possibility of the original also needing to be submitted. Please advise if Offerors are also to overnight the original version of the Bid Bond, and if so, if it is to arrive prior to the due date and time for the proposal submission. Government answer: The Government revised the solicitation to remove the sentence which states, Offerors shall provide the Contracting Officer confirmation of the bid bond delivery via email to taminie.panich@va.gov and Robert.moffett@va.gov prior to the closing date/time . Therefore, the contractor shall provide the bid bonds in the proposal. Solicitation Pages 16-17� of 68 / Sustainable Acquisition Plan: The Solicitation states that "Offerors shall include a Sustainable Acquisition Plan in their technical proposals." Please advise if this in fact an actual requirement of the Volume I - Past Performance proposal (as it was not mentioned as being a requirement in that section) and, if so, whether it will count against the 20-page limit. Government answer: This is not a requirement under Volume I - Past Performance and will not count against that page number.� It is a requirement of VAAR 852.223-70. Solicitation Page 61 of 68 / Organizational Conflicts of Interest: The Solicitation states that "The Offeror shall provide a statement with its offer..." Please advise if this is in fact an actual requirement of the proposal submission (as it was not mentioned as being a requirement in either volume section) and, if so, what Volume it should be placed. If placed in Volume I, will it count against the 20-page limit? Government answer: This is not a requirement under Volume I or II - Past Performance and will not count against that page numbers reflected in those sections. Please add to the end of the proposal. For Volume I - past performance requirements, can SDVOSB utilize Teaming Agreement with Major Subcontractor while proofing limitations subcontracting requirements? Government answer: The government does not usually get into the business of directing companies on whether they may have teaming agreements.� The government only stipulates that contractor must abide by the limitation subcontracting requirements. For Joint Venture, are both parties required to be SDVOSB or can the SDVOSB certified venture with a large or other small business that is not an SDVOSB? Government answer: Please see Volume II Price Section (j).This is a 100% SDVOSB Set-Aside. NCO17 will issue an amendment requiring that SDVOSBs be certified on the SBA VetCert site at: Veteran Small Business Certification (sba.gov). An SDVOSB receiving the award must be in the SBA Vet Cert database ton receive award. EP103 shows keyed note 6 on the roof plan. There is no keyed note 6 on the legend. Government answer: Note 6 should be note 3. Note 3 mentioned bonding mechanical equipment to the lightning protection system. EP103 no roof mounted receptacles are shown. Government answer: There is no receptacles shown as there are only exhaust fans on the roof. Per code it s required for heating, air conditioning, or refrigeration equipment. An exhaust fan doesn t exactly fit into these criteria. With that said a convenience outlet can be added if needed. E603 shows almost all the disconnect types as a breaker N4X. Is this supposed to be N4X enclosed breakers or N4X disconnect switches? Government answer: 4X for the disconnect switches. Not an enclosed breaker. E601 shows the generator to be 500KW/625KVA. The specifications show the generator to be 400KW/500KVA. Which is correct? Government answer: 500kW/625kVA is correct. The breaker is sized for 800A and 625kVA calculates to about 800A @480V. There appears to be some sort of vent fan on site. Didn t see any notes on plans what to do with. Refer to attachment IMG_6526 Government answer: See sheet MD001 for scope of work required for existing shallow tunnel access point. There appears to be an abandon pole & light pole on site. Didn t see any notes on plans what to do with. Refer to attachment pole & light.pdf Government answer: PDF not attached. Can review once PDF received or can answer through email. T0601 detail 3 states to provide (2) 4 conduits, (1) with (4) inch inderducts from main IT room back to building 1 main server room in basement. No routing to see how path is to building 1 is shown. Please provide. Government answer: See Sheet T-101 for location of manhole. FA-101 general note 3 states the fire alarm system shall be compatible with existing campus mass notification system. What is the existing campus mass notification system? Government answer: Edwards Is there a base wide fire alarm network, if so what is the existing system? Government answer: Edwards Would it be possible schedule a time to look at the existing fuel oil tanks? Government answer: Due to a tight deadline no additional site visits will be scheduled. The bid documents did not provide any details as to the current location of the fuel tanks that need to be relocated. Additionally, no as-builts were provided on the existing tank piping, etc. Contractor would like to see the tanks and where they are to be relocated. Government answer: Existing tanks are located near building #58. This building is north of building #53. We can provide existing drawings with approval from contracting officer. We are very interested in pursuing the above-referenced project and are getting initial subcontractor interest but due to the RFI deadline tomorrow, we feel we will have limited subcontractor participation.� Is there a possibility that the RFI deadline can be extended a week to allow more subcontractor participation?� Government answer: We are on a tight deadline for this action so the RFI deadline shall not be extended. Will the sign in sheet for the site visit for the above referenced project be posted, or do you have a GC list of bidders? Government answer: Yes, the sign in sheet has been provided with Amendment 0001. Please provide specification for precast. Government answer: Specification are provided in 03 30 00 Please clarify exterior wall finish, wall sections per AS-302 show metal panels, however no specifications were provided for metal panels, only EIFS. Government answer: The Exterior Rain Screen Basis of Design is ALUCO BOND PLUS, Dry Reveal. Specifications to be provided. Please clarify fueling wall construction, wall section per AS-302 shows CMU with brick veneer, C-104 seems to indicate a cast-in-place concrete wall. Government answer: The construction of the Fueling Wall is to be constructed as
Who won similar work
45 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 238220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BRAND CONSTRUCTION LLC | 9 | $6.7M | Aug 17, 2026 |
| WARRIOR DYNAMICS LLC | 6 | $696K | Sep 1, 2026 |
| TEXAS VELOCITY ENTERPRISES, LLC | 3 | $6.0M | Sep 1, 2026 |
| MGI, INC. | 3 | $884K | Aug 24, 2026 |
| JOHNSONDANFORTH, INC | 2 | $7.2M | Jun 11, 2026 |
| HAMILTON PACIFIC CHAMBERLAIN LLC | 2 | $4.4M | Apr 13, 2026 |
| GCC ENTERPRISES INC. | 1 | $7.2M | Jun 17, 2026 |
| BP CONSTRUCTION JV LLC | 1 | $5.5M | Nov 21, 2024 |
| RJY GROUP LLC | 1 | $3.0M | Apr 14, 2026 |
| Healing Hands Healing Hearts L.L.C. | 1 | $1.8M | Nov 19, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 2, 2026HurtVet Subcontracting, Inc.$29KJ012--NEW | CTX Fire Sprinkler Reconfiguration for Dental Expansion
- Sep 1, 2026WARRIOR DYNAMICS LLC$65KSam Rayburn Memorial HVAC Rooftop Unit Replacement
- Sep 1, 2026TEXAS VELOCITY ENTERPRISES, LLC$1.9MH219--Repair Duct and Chilled Water Lines
- Aug 24, 2026MGI, INC.$329KN065--Dental Instrument Air System Replacement Bldg 163
- Aug 17, 2026VALCORP ENTERPRISES LLC$57KJ041--CTX Steam Humidifier Replacement Bldg. 163
- Aug 17, 2026BRAND CONSTRUCTION LLC$568KJ045--CTX Water Heater Repair and Replacement Temple
- Aug 4, 2026MGI, INC.$191KMedical Vacuum Pump Replacement
- Jul 30, 2026WARRIOR DYNAMICS LLC$40KH145--Bldg. 9 Repair Plumbing
- Jul 24, 2026WARRIOR DYNAMICS LLC$417KJ045--Replace Domestic Hot Water Skid
- Jul 9, 2026BRAND CONSTRUCTION LLC$1.6MZ2DA--674-23-255 NRM Improve RO-DI Recirculation
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.