Loading the records…
Loading the records…
The full analysis for this notice (past winners, timing, competitors) is being prepared. Refresh in a minute.
CONTACT INFORMATION|4|N744.17|BLB|(771) 229-2110|stephen.a.knox.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specifications Section C and Section E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|TBD|TBD|TBD|TBD| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|2|180 Days|CLIN 0001AB|1|180 Days|||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|W25G1U - 2; W62G2T - 1|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13||X|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4|334290|800||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334290|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Solicitation expired. Amended solicitation with end date of 13 Feb 2026. \ 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7. The option provision is included in the event the Government has an additional requirement 365 DAYS after issuance of the award. This will authorize the Government to add the additional quantity, up to the percentage cited, to the order, via modification without having to re-solicit. 8. It is requested that pricing be submitted on the option provision. 9. Evaluation for the award of the proposed requirement will be based upon thelowest aggregate total price submitted for the total quantity, inclusive of theoption provision. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TOWED ARRAY SUBASSE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=497A10012 |53711| E| |D| | | | DRAWING DATA=497A10104 |53711| E| |D| | | | DRAWING DATA=497A63201 |53711| E| |D| | | | DRAWING DATA=497A75300 |53711| G| |D| | | | DRAWING DATA=497A75301 |53711| D| |D| | | | DRAWING DATA=497A80018 |53711| D| |D| | | | DRAWING DATA=497A80072 |53711| B| |D| | | | DRAWING DATA=8482141 |53711| A| |D| | | | DRAWING DATA=8482148 |53711| -| |D| | | | DRAWING DATA=8482149 |53711| A| |D| | | | DRAWING DATA=8482158 |53711| A| |D| | | | DRAWING DATA=8482159 |53711| -| |D| | | | DRAWING DATA=8482160 |53711| -| |D| | | | DRAWING DATA=8482161 |53711| A| |D| | | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-A-24456 | | | |790615|A| 3| | DOCUMENT REF DATA=ASME-Y14.5.1M | | | |941114|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |F |971128|A| | | DOCUMENT REF DATA=ASTM-D329 | | | |901026|A| | | DOCUMENT REF DATA=MIL-PRF-81733 | | |D |980515|A| | | DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the TOWED ARRAY SUBASSE furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;497A75300; cage ;53711; . 3.1.1 ;PN - 497A75300-39; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 ;The requirements of 53711 drawing #497A75300 are such that a potential vendor must comply with multiple drawing and mil-spec requirements prior to award. The item required is an assembly of parts. The piece parts and the assemblage processes need to comply with all requirements as desribed in the production notes and subsequent drawing specification requirements. The following drawings specifications require process qualification prior to acceptance of production orders: NAVSEA Drawing 8482161, Process Specification for Vulcanization of Chloroprene Rubber (per 3.6) NAVSEA Drawing 8482159, Process Specification for Installation of Vibration Damping Tiles (per 3.6) NAVSEA Drawing 8482158, Process Specification For Bonding with Epoxy Adhesives (per 3.6) NAVSEA Drawing 8482160, Process Specification for Gap Filling (per 3.6) Per NAVSEA DRAWINGS: 3.6 Qualification. This specification requires process qualification prior to acceptance of production orders. The qualification need not be accomplished for repeat orders, provided that the materials and processes have not been changed. With each production order the supplier shall furnish certification in writing that the materials and processes have not been changed in any way from that used when the process was originally qualified. 3.6.1 Requalification. The supplier is advised that if the material formulation or manufacturing process has been changed since the receipt of qualification approval, requalification shall be required before supplying the product manufactured inaccordance with this specification. The supplier shall notify the procuring activity prior to change. The procuring activity will determine the extent of the requalification. 4.2.1 Q