Sources SoughtPosted Sep 3, 2026·Responses due Sep 23, 2026

B-21 Low Observable / Radio Frequency Hangar - OT Feasibility and Business Feedback

Army Corps of Engineers · W076 ENDIST FT WORTH

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
236220
Value
Not stated
Solicitation
W9126G27RA002
Set-aside
None stated
PSC
Y1BZ
Place
Not stated
Contact
Thomas Howard (thomas.w.howard@usace.army.mil)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation W9126G27RA002 in this department, oldest first.

Early notice
  • Mar 2, 2026
    Special Notice
    Open
  • Sep 3, 2026 · this notice
    Sources Sought
Solicitation
None posted
Award
Not yet. Typical award: Jun 22, 2026 to Nov 12, 2026, middle of the range Jul 27, 2026.
Measured from 62 past early notices at Dept of the Army with NAICS 236220 that later posted an award (middle half of cases, counted from Mar 2, 2026).
Responses are due Sep 23, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

SUBJECT: Sources Sought (RFI) - B-21 Low Observable / Radio Frequency HangarDISCLAIMER. THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party.PURPOSE… (show all)

. The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection.ACQUISITION STRATEGY AND NON-FAR MODEL.a. Statutory Authority: This project will potentially be executed as a Progressive Design-Build (PDB), Design-Build to Budget (DBtB) or Construction Management at Risk (CMatRisk) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. Section 2808a.b. Non-FAR Environment: Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this procurement. The negotiated, bilateral Other Transaction Agreement will serve as the sole governing contract. Standard FAR clauses are inapplicable, though federal statutory constraints such as federal fiscal law, criminal statutes, and general civil laws remain fully applicable.c. Agreement Mechanics(1) PBD Procurement Process: Phase 1, Design and Pre-Construction Services, a design-builder will be selected through a qualifications-based selection (QBS) process. The government will then negotiate a fee for Phase 1 services. There is no requirement to submit price proposals or design concepts during the initial selection. Phase 2, Final Design and Construction, is executed via a bilateral modification to the OT Agreement upon successful negotiation of a Guaranteed Maximum Price (GMP) at approximately 65% design maturity. The Agreement contains an off-ramp clause allowing the Government to retain the design and procure construction separately if GMP negotiations fail.(2) DBtB Procurement Process: Solicitation and evaluation during Phase 1 focuses on the qualifications, past performance, and integrated Design-Build experience of each offeror. The Government is evaluating the team and not necessarily how the offeror will design the structure. The Phase 1 evaluation results in the selection of three of the most highly qualified, competitive teams to proceed to Phase 2. Phase 2, the Government will issue the final RFP exclusively to the down-selected teams. This RFP includes the validated, performance-based requirements, establishes the firm Construction Cost Limit (CCL), and clearly defines the basic scope.(3) CMatRisk Procurement Process: Early involvement, separate contracts, guaranteed maximum price and collaborative delivery.PROJECT OVERVIEW AND SCOPE.a. Title: B-21 Low Observable / Radio Frequency Hangarb. Location: Dyess Air Force Base, Texasc. Scope: Construct a new 95,529 sq. ft. Low Observable Corrosion Control Hangar (LO) and a Radio Frequency Facility (RF) for the new B-21 weapons system. The project demands a highly collaborative and iterative design process to manage complexity and a critical schedule.d. Target Price Range (TPR): The Government has established the Government target price estimate for construction is between $280,000,000 and $300,000,000.e. Projected Award Date: The Government targets the formal award of the Agreement Phase 1 (Design and Preconstruction Services) on or about July 2027.f. Current Design is at 100%. The Government is willing to revert to a 35% design, allowing the awardee and designer the ability to collaborate during an OTA procurement process.g. Period of Performance (POP): The projected construction timeline is approximately 1217 calendar days following the execution of the Phase 2 Construction modification.h. Product Service Code (PSC): Y1BG (Construction of Electronic and Communications Facilities).i. NAICS Code: 236220 (Commercial and Institutional Building Construction).(1) INNOVATIVE METHODOLOGIES AND FEEDBACK AREAS. In accordance with Air Force Civil Engineer Center (AFCEC) Design Instruction number 3, the Government is seeking commercial industry feedback regarding the feasibility and market capacity for the following innovative methods:i. Modular and Off-Site Prefabrication: Fabricating large sections of the facility or complex mechanical, electrical, and plumbing (MEP) systems in factory-controlled environments to compress the construction schedule.ii. 3D Printing: Utilizing large-scale 3D printing for secondary building components, non-load-bearing walls, or perimeter security fencing.iii. Advanced Materials: Incorporating self-healing concrete to reduce lifecycle maintenance and maximize structural integrity, or utilizing high-performance insulation such as aerogels or vacuum-insulated panels to meet high-performance building standards.

Who won similar work

20 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 236220.

WinnerAwardsValueLast
RED EAGLE 2 JV Coweta OK 74429 USA2$124.3MJun 5, 2026
FEDERAL CONTRACTING INC2$93.1MApr 30, 2026
EMERSON CONSTRUCTION COMPANY2$55.1MSep 3, 2026
M. A. MORTENSON COMPANY1$610.0MMar 6, 2026
AR6-WHITE CONSTRUCTION, JV LLC1$123.3MSep 25, 2026
CLARK CONSTRUCTION GROUP LLC1$112.8MSep 30, 2026
ESA SOUTH, INC.1$102.1MJun 5, 2026
COACTINT-APC DESIGN BUILD, LLC1$102.1MJun 5, 2026
FOUR WINDS MECHANICAL HTC/AC INC.1$102.1MJun 5, 2026
VALIANT CONSTRUCTION LLC1$102.1MJun 5, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
  • 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.