58--PROCESSOR,TEST CONT, IN REPAIR/MODIFICATION OF
NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N0038326RNA24 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTACT INFORMATION|4|N731.45|N00383|771-229-0589|alyssa.t.thieu.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports combo|Inspection site source Final acceptance site source|TBD|N00383|TBD|TBD|See schedule|TBD||||||||| ALL TERMS AND CONDITIONS OF BOA N00383-23-G-A501 SHALL APPLY. This solicitation is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic… (show all)
commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this solicitation. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: PROCESSOR,TEST CONT ;717407600-009; P/N, ;5895 016785234; NSN, ;IAW OEM technical drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The co
Who won similar work
15 award notices on SAM.gov in the last 24 months. Match: Same agency (NAVSUP (Naval Supply Systems Command)), same NAICS 334290.
| Winner | Awards | Value | Last |
|---|---|---|---|
| LOCKHEED MARTIN CORPORATION · $LMT | 4 | $3.0M | Oct 24, 2025 |
| THE BOEING COMPANY · $BA | 1 | $18.8M | Jul 23, 2026 |
| MERCURY SYSTEMS INC · $MRCY | 1 | $1.1M | Jul 1, 2025 |
| CPI INTERNATIONAL, INC. | 1 | $787K | Feb 27, 2025 |
| General Dynamics-Ots, Inc. · $GD | 1 | $708K | May 6, 2026 |
| XENTURIS LLC | 1 | $498K | Jul 21, 2026 |
| HYPERION TECHNOLOGY GROUP INC | 1 | $395K | May 5, 2026 |
| Northrop Grumman Systems Corporation · $NOC | 1 | $64K | Sep 17, 2026 |
| PREMIER EDGE SERVICES LLC | 1 | $34K | Aug 10, 2026 |
| VELASEA, LLC | 1 | $31K | Jul 23, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 17, 2026Northrop Grumman Systems Corporation$64KCONTROL-POWER SUPPL
- Aug 10, 2026PREMIER EDGE SERVICES LLC$34KNAS Oceana Air Show Security Scanners
- Jul 23, 2026THE BOEING COMPANY$18.8M58--PROCESSOR,TARGET LO, IN REPAIR/MODIFICATION OF
- Jul 21, 2026XENTURIS LLC$498KEnvironmental Node Instrumentation for Acoustic data Collection (ENIAC) System
- May 6, 2026General Dynamics-Ots, Inc.$708KAMPLIFIER POWER GRO
- May 5, 2026HYPERION TECHNOLOGY GROUP INC$395K5845 - ENVIRONMENTAL NODE INSTRUMENTATION FOR ACOUSTIC DATA COLLECTION (ENIAC) SYSTEM
- Oct 24, 2025LOCKHEED MARTIN CORPORATION$750KNRP,MODULE,ACOUSTIC
- Oct 24, 2025LOCKHEED MARTIN CORPORATION$750KNRP,MODULE,ACOUSTIC
- Oct 24, 2025LOCKHEED MARTIN CORPORATION$750KNRP,MODULE,ACOUSTIC
- Oct 24, 2025LOCKHEED MARTIN CORPORATION$796KCNTRL PNL ASSY PS
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 4 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (49 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- $1.5M from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 5 of the past winners are listed companies
- 0 insider buys and 22 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.