SolicitationPosted Jul 23, 2026·Responses due Jul 23, 2026

MILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS

Army Corps of Engineers · W071 ENDIST PORTLAND

Stage
Open solicitation
NAICS
237990
Value
Not stated
Solicitation
W9127N26BA016
Set-aside
Small Business Set Aside - Total
PSC
Z2QA
Place
Cathlamet, WA, USA
Contact
Chris Burroughs (christopher.d.burroughs@usace.army.mil)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation W9127N26BA016 in this department, oldest first.

Early notice
  • May 5, 2026
    Pre-solicitation
    Open
  • May 20, 2026
    Pre-solicitation
    Open
Solicitation
  • Jun 23, 2026
    Solicitation
    Open
  • Jun 23, 2026
    Solicitation
    Open
  • Jul 23, 2026 · this notice
    Solicitation
Award
Not yet. Typical award: Aug 15, 2026 to Sep 23, 2026, middle of the range Aug 31, 2026.
Measured from 85 past solicitations at Dept of the Army with NAICS 237990 that later posted an award (middle half of cases, counted from Jun 23, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

W9127N26BA016 MILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This solicitation announcement is for the construction/repair of the Miller-Rice Islands Pile Dike System located between River Mile 22 and River Mile 25 on the Columbia River in Wahkiakum County, Washington. Project Scope: The project consists of enhancing and connecting the enrockments of PD 23.82 and PD 23.71 and repairing and enhancing PD 24.63. The enrockme… (show all)

nt for PD 23.71 and PD 23.81 will be raised uniformly and enhanced to connect the two pile dikes. The repair and enhancement of the centerline of PD 24.63 will be approximately 10 feet downstream (west) of the existing pile dike piles centerline. This placement allows for enhanced enrockment construction without the need for removal of existing piles. The offset placement of the enhanced enrockment may also allow for phased placement over time as the existing pile dike continues to degrade. Furthermore, locating the enhanced enrockment slightly downstream eliminates the need for removal of large amounts of debris on the upstream side of the existing pile dike. The enhanced enrockment crest will be raised from an existing elevation of approximately El. -15 feet NAVD88 to El. -5 feet NAVD88. For the northern (nearshore) portion of the dike, from Sta. 1+00 to Sta. 0+25 the enhanced enrockment crest will slope downward from El. -5 feet NAVD88 to El. -12 feet NAVD88, from Sta 0+25 to 0+04 the enhanced enrockment crest will have an El. of -12 feet NAVD88. The northern (nearshore) end of the enhanced enrockment will terminate in 14 foot wide by 4-foot-thick rock scour apron. For the southern (offshore) 480 feet of the dike (Sta. 8+00 to 12+80), the crest will slope downward from El. -5 feet NAVD88 to El. -16 feet NAVD88 at the offshore end where it will tie into the existing enrockment at a 2H:1V slope. The enhanced enrockment will have an 8-foot crest width and 1.5H:1V side slopes. The design includes construction of 8 new hazard marker piles to designate the locations of the submerged enrockments. The new hazard marker piles are driven mono pile structures. Hazard marker pile design is a steel pipe monopile. The hazard marker pile will have a 3-foot by 3-foot navigation hazard sign affixed to the top. The top of the pile is positioned at 20 feet NAVD88. This solicitation is a Total Small Business Set-Aside competitive Invitation for Bid (IFB). Award will be made to the lowest priced, responsible, and responsive offeror. This acquisition will result in a single fixed-price contract. The National Environmental Policy Act (NEPA) process, including the signed Finding of No Significant Impact (FONSI), is anticipated to be completed during the solicitation period, and award will not be made until the NEPA process has completed. Magnitude of Construction: The estimated cost of the project is between $25,000,000.00 and $100,000,000.00. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Chris Burroughs at christopher.d.burroughs@usace.army.mil, and the alternate POC, Justin Figueredo at justin.f.figueredo@usace.army.mil. E-mail is the only method for receiving bids to this Solicitation. See the attached Specifications and Planset for all details. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

Who won similar work

19 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 237990.

WinnerAwardsValueLast
HME CONSTRUCTION INC4$30.4MJul 31, 2026
MANSON CONSTRUCTION CO Seattle WA 98134 USA2$72.6MMar 25, 2026
ANVIL BUILDERS INC1$35.9MFeb 2, 2026
Odin Environmental Solutions, LLC1$29.0MFeb 2, 2026
ORION GOVERNMENT SERVICES LLC · $ORN1$26.7MSep 11, 2026
SIEVERT ELECTRIC SERVICE AND SALES COMPANY1$21.6MAug 4, 2026
BIG RIVER CONSTRUCTION INC1$18.5MAug 21, 2026
ADVANCED AMERICAN CONSTRUCTION, INC.1$18.0MOct 24, 2024
SNC CORE JV, LLC1$6.6MOct 10, 2025
SUULUTAAQ, INC.1$3.0MSep 24, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
  • 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 1 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.