C223--558-24-156 Install SPS AHU A/E Services
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24625R0041 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Page 9 of 9 DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 6 (NCO 6) Sources Sought 36C24625R0041 In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Additionally, the Government reserves the right to revise specifications, and refine contract requirements, before the release of any associated solicitation. This is not a Request for Proposals (RFP). OVERVIEW The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential sources for Architec… (show all)
t-Engineer services to complete the below scope of work. The place of performance will be the hospital campus of the Durham VA Medical Center in Durham, North Carolina, located at 508 Fulton Street Durham NC 27705. Forward all questions to the point of contact identified below. The magnitude of construction for this project is currently between $250,000 to $500,000 but is subject to revision prior to release of a solicitation. The anticipated Period of Performance is 200 calendar days from the Notice to Proceed. SCOPE OF WORK A/E part one services (also known as Design Phase) for this design project includes phasing recommendations, investigative surveys, reports, planning, design work, preparation of contract drawings and construction specifications, preparation of cost estimates at 30%, 60%, 95%, 100% design, and provision of construction period services as necessary for all demolition, construction, inspection, testing and certification for all mechanical, electrical, and plumbing components for the project. A/E part two services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, post-award and kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visit per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list, and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain the RFI log, and provide meeting minutes for weekly construction meetings throughout the duration of construction and design. The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project. Design shall be done in such a way that SPS area will continue to meet HVAC and regulatory requirements, or a temporary AHU shall be part of design while a new unit is being placed. Designs for construction must produce a complete and usable facility or improvement when constructed. The A/E shall certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E shall certify that it has produced a design that does not include cost of furniture and equipment that will be procured separately. Equipment that can be part of the design in the includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of facility record drawings will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. DESIGN CRITERIA The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References: All Federal and local codes including: NFPA 101, 92B, 92, 96, 72, 13, 241, and 90a National Electric Code (NEC) Life Safety Codes Other applicable codes VA Numbered Standards for Construction: PG-18-1� Master Construction Specifications PG-18-3� Design and Construction Procedures PG-18-4� Standard Details and CAD Standards PG-18-5� Equipment Guide List H-18-8� Seismic Design Handbook PG-18-9� Space Planning Criteria, and VA-Space & Equipment Planning System (VA-SEPS) PG-18-10� Design Manuals (by discipline) PG-18-12� Design Guides PG-18-13� Barrier Free Design Standard PG-18-14� Room Finishes, Door, and Hardware Schedule Change Summary PG-18-15� Minimum Requirements for A/E Submissions PG-18-17� Environmental Planning Guidance D-7545� Cultural Resource Management H-7545� Cultural Resource Management Procedures Office of Construction & Facilities Management - Architect/Engineer Information: National CAD Standard, VHA Application Guide VA BIM Standard v2.2 Drawing Deliverable Requirements (DDR) VA Standards Alert 017 Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf Design must adhere to the following energy requirements: All new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2010, if life cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2010 to document the energy savings. Should the 30% reduction in energy consumption prove not to be life cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements in order to identify the most energy-efficient design that is life-cycle cost effective. The following parameters shall be used for performing the analysis: 20-year life-cycle period for system comparisons Use Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc. 7% Discount Factor Neither includes taxes, nor insurance while computing cost. Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. DESIGN Provide design documents with working drawings, specifications, and cost estimate at 30%, 60%, 95%, and 100% design and final stages. Design Deliverables: Part I 15% Design Report (included in Part II submission): Prior to the initiation of any detailed design, the A/E shall, in conjunction with representatives of the Engineering
Who won similar work
22 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same NAICS 541330.
Single-winner award sizes (22): middle half $126K to $706K, median $363K; range $31K to $6.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| APOGEE CONSULTING GROUP, P.A. CARY 27511 NCL | 3 | $1.3M | Dec 5, 2025 |
| NORTHEAST INFRASTRUCTURE LLC | 2 | $951K | Jun 18, 2026 |
| AWEN SOLUTIONS GROUP, LLC | 2 | $660K | Jun 1, 2026 |
| VALI COOPER INTERNATIONAL LLC | 1 | $6.0M | Mar 27, 2026 |
| DAV ENERGY SOLUTIONS, INC. | 1 | $1.6M | Nov 13, 2025 |
| GEO BANCROFT ENGINEERING LLC | 1 | $1.6M | Sep 23, 2025 |
| USFIN DEVELOPMENT LLC | 1 | $760K | Aug 3, 2026 |
| VALHALLA ENGINEERING GROUP, LLC | 1 | $743K | Dec 26, 2024 |
| HARRELL DESIGN GROUP PC CHARLOTTE 28227 NCL | 1 | $593K | Mar 27, 2025 |
| GUIDON-CHARLOTTE ENGINEERS SDVOSB JV II LLC | 1 | $367K | Sep 23, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 28, 2026CB DESIGN GROUP, INC.$359KC1DB--B21 HVAC Upgrades/Roof Replacement AE Project 659-26-200No listed company matched (Materiality N/A)
- Sep 3, 2026Apogee Consulting Group, P.A. Cary NC 27511 USA$110K652-25-111 Repair USP 800 AC-59No listed company matched (Materiality N/A)
- Aug 21, 2026SEMPER ENVIRONMENTAL LLC$93KF108-- GAS MONITORING PROJECTNo listed company matched (Materiality N/A)
- Aug 3, 2026USFIN DEVELOPMENT LLC$760KC1NZ--659-26-700 | AE Replace Steam and Condensate Piping |No listed company matched (Materiality N/A)
- Jun 18, 2026NORTHEAST INFRASTRUCTURE LLC$892KC1DA--FY26 NRM CORRECT FCA PLUMBING DEFICIENCIES-MATOCNo listed company matched (Materiality N/A)
- Jun 1, 2026AWEN SOLUTIONS GROUP, LLC$218KC1DZ--Roof Replacement B6, 13, & 18No listed company matched (Materiality N/A)
- Apr 9, 2026CHARLOTTE ENGINEERS, LLP$126KC1NZ--Campus Chilled Water Loop Repairs AE Project 659-26-300No listed company matched (Materiality N/A)
- Mar 27, 2026VALI COOPER INTERNATIONAL LLC$6.0MR425--Construction Program Management and Related ServicesNo listed company matched (Materiality N/A)
- Dec 5, 2025APOGEE CONSULTING GROUP, P.A. CARY 27511 NCL$570KC1DA--Upgrade Air Handling Systems & Distribution 652-24-105No listed company matched (Materiality N/A)
- Nov 13, 2025DAV ENERGY SOLUTIONS, INC.$1.6MC1DA--Renovate Building 135 36C24625R0028 (590-25-101)No listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.