Market Survey: Design and Construction of Prefabricated Metal Storage Garage - Boise Air Traffic Control Tower (Gowen Field), Boise, ID
FAA · 697DCK REGIONAL ACQUISITIONS SVCS
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 697DCK-27-R-00025 in this department, oldest first.
- Sep 24, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
1. Introduction To support acquisition strategy development and assess commercial marketplace capabilities, the Federal Aviation Administration (FAA) is seeking interested sources capable of designing and constructing a finished pre-engineered metal storage garage at the Boise Air Traffic Control Tower (ATCT). This Market Survey is issued in accordance with FAA Acquisition Management System (AMS) Policy 3.2.1.2.1 to solicit statements of interest and capabilities. Estimated Project Value Range: $450,000.00 - $650,000.00 Place of Performance: Boise Air Traffic Control Tower (ATCT) / Gowen Field… (show all)
2901 Ed Stimpson Way, Boise, ID 83642 2. Project Description & Scope of Work The Federal Aviation Administration (FAA), Mobile Asset Program, has a requirement to design and construct a finished pre-engineered metal storage garage (PEMB) at the Boise Air Traffic Control Tower (Gowen Field). The new facility will serve as an unstaffed equipment storage building to house and protect large mobile equipment trailers. Specific work items and technical parameters include: Building Structure & Dimensions: Design, fabricate, deliver, and erect a 53'-0" W x 90'-0" L x 18'-0" Eave Height (5,208 sq. ft.) gable Pre-Engineered Metal Building (PEMB) capable of meeting 2018 International Building Code (IBC) standards and 115 mph wind speeds (Exposure C). Floor-to-ceiling interior clearance shall be not less than 14 feet above the floor slab. Slab & Substructure Foundation: Utilize the existing 53' x 90' concrete slab/ramp as the finished floor. Clean, pressure wash, and apply a high-grade clear penetrating concrete sealer (epoxy not required). Construct a new reinforced concrete perimeter foundation outside the footprint of the existing slab, consisting of 20 augered cylindrical piers (30" diameter x 6'-0" deep) spaced at 10'-0" O.C., a 3'-0" high perimeter concrete skirt/stem wall, and 4" concrete infill between the existing curb and new skirt wall. Building Access & Overhead Doors: Furnish and install two (2) 16'-2" W x 14'-1" H commercial insulated sectional roll-up doors (R-12.76 rating) on the east (53') facade with manual chain hoists, designed to accommodate large mobile asset trailers. Provide two (2) interior manual chain hoists for equipment handling. Install two (2) 3'-0" x 7'-0" hollow metal personnel egress doors with panic hardware (one on the east face between the roll-up doors, and one on the south face). Thermal Envelope & Environmental Controls: Install full R-11 roof and wall blanket insulation with white/reflective foil vapor retarder facing. Equip the facility with interior unit heating for freeze protection, passive/active exhaust ventilation fans with automated louvers, and complete perimeter joint caulking and elastomeric weather sealing. Electrical & Exterior Lighting: Install commercial LED exterior wall-pack luminaires above bay openings and access doors, connected to the adjacent facility overhead/underground electrical power feed. Civil & Asphalt Paving Work: Design and construct heavy-duty asphalt paving adjacent to the east bay doors to facilitate heavy trailer maneuvering into storage bays. Grade earthwork around the perimeter skirt wall for positive surface drainage away from the structure. Implement SWPPP measures during construction. (Sub-surface drainage piping, domestic water, and plumbing are explicitly excluded). The anticipated performance schedule is ninety (90) calendar days / twelve (12) weeks from the issuance of the official Notice to Proceed (NTP). The award will be made under a firm-fixed-price (FFP) contract structure. 3. Disclaimer This announcement is a Market Survey only and does not constitute a Screening Information Request (SIR) or Request for Proposal (RFP). The Federal Aviation Administration (FAA) is neither seeking nor accepting unsolicited proposals. Responses to this Market Survey will be used to evaluate industry capabilities and may be used to establish a qualified vendors list for this procurement. Therefore, it is imperative that all interested companies submit all requested information. Companies that fail to provide the required documentation will not be considered further. This announcement shall not be construed as a commitment or promise by the Government to award a contract. The Government is not responsible for, nor will it reimburse, any costs incurred in the preparation or submission of responses. All submitted materials become Government property and will not be returned. 4. Capability Statement & Submission Requirements Interested Small Business prime contractors holding an active SAM.gov registration under NAICS 236220 or 236210 are invited to submit a Capability Statement demonstrating experience with similar federal aviation or industrial Pre-Engineered Metal Building (PEMB) projects. Submissions must include: Company Profile: CAGE Code, Unique Entity ID (UEI), and applicable socio-economic certification documentation (e.g., 8(a), HUBZone, WOSB/EDWOSB, SDVOSB). Technical Experience: Demonstrated experience in commercial/industrial PEMB fabrication, foundation augering, and asphalt civil paving within the past five (5) years. Past Performance: References for at least three (3) relevant federal or commercial projects of similar scope and magnitude ($250k�$500k). Key Personnel: Brief qualifications and resumes for the Project Manager, On-Site Superintendent, Quality Control Manager, and Safety Manager. Bonding Capacity: Confirmation letter from an approved Treasury-listed Surety establishing a minimum bonding capacity of $500,000 (single project and aggregate). Proof of Insurability: Letter or certificate from an insurer licensed/authorized to do business in the State of Idaho demonstrating the ability to obtain required coverage (General Liability, Workers' Compensation, etc.). 5. Response Instructions & Primary Point of Contact Responses to this Pre-solicitation / Sources Sought notice must be submitted electronically via email to the Contracting Officer. The official Request for Offer (RFO) package may be issued to qualified vendors following evaluation of capability statements. Any questions must be submitted in writing to the Contracting Officer.
Who won similar work
7 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| STRUCTSURE PROJECTS INC | 1 | $63.9M | Sep 30, 2025 |
| GUARDIAN CONSTRUCTION, INC. | 1 | $10.3M | Aug 24, 2026 |
| PROCON INTERNATIONAL LLC | 1 | $7.2M | Aug 24, 2026 |
| BRICE TERRA LLC | 1 | $2.2M | Mar 9, 2026 |
| The Matthews Group, Inc. | 1 | $1.7M | Mar 31, 2026 |
| Gramercy Group Inc | 1 | $739K | Dec 9, 2025 |
| I-2-I Solutions, Inc. | 1 | $19K | Jun 12, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Aug 24, 2026PROCON INTERNATIONAL LLC$7.2MIIJA FUNDED - MAF ATCT MODERNIZATION
- Aug 24, 2026GUARDIAN CONSTRUCTION, INC.$10.3MBIL Fire Life Safety at PHX Base Building and P50 TRACON
- Mar 31, 2026The Matthews Group, Inc.$1.7MAward Notice: Design-Build, Heating System Optimization at the Bismarck Municipal Airport (BIS) Air Traffic Control Tower in Bismarck, ND
- Mar 9, 2026BRICE TERRA LLC$2.2MFacility at Crooked Creek (CJX)
- Dec 9, 2025Gramercy Group Inc$739KAWARD NOTICE - TEB ATCT Demolition project at Teterboro, NJk, NJ
- Sep 30, 2025STRUCTSURE PROJECTS INC$63.9MAWARD NOTICE - LAW ATCT Construction project at Lawton, OKTCT in Newark, NJ
- Jun 12, 2025I-2-I Solutions, Inc.$19KCeiling Grid Refurbish at the Houston Air Route Traffic Control Center (ZHU)
Competitive landscape
For the 7 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Federal Aviation Administration (FAA) since 2024 (0 filings)
- 0 of their lobbyists list a past Federal Aviation Administration (FAA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 982 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.