Y--Conconully Dam, WA, Safety of Dams Modification
Bureau of Reclamation · PACIFIC NW REGION PN 6615
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 140R1026R0004 in this department, oldest first.
- Jun 30, 2026Special NoticeOpen
- Sep 10, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
NOTICE TYPE: Sources Sought / Industry Day Invite SUBJECT: Bureau of Reclamation Safety of Dams, Conconully Dam Seismic Modifications, Industry Day Invite 1. DISCLAIMER: This is a Sources Sought Notice/Industry Day Invitation only. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notic… (show all)
e. All response costs will be borne solely by the interested party. Any future solicitations will be announced under a different solicitation number. Solicitation number 140R1026R0004 will be rendered obsolete after September 30th, 2026. 2. PROJECT OVERVIEW: The Department of Interior, Bureau of Reclamation is conducting a Sources Sought Notice/Industry Day Invitation for the Conconully Dam Seismic Modification project. 3. SCOPE OF WORK: Critical components of work for the project are anticipated to include: A. Coordinate power, fiber, and telecommunications to the site including temporary and permanent installations. B. Clearing, grubbing, and stripping of the work area and borrow areas. C. Abandoning and removing existing site instrumentation including piezometers, weirs, shear strips, and seismic installations. D. Earthwork for construction preparation and embankment construction. E. Deep soil mixing of foundation materials. F. Preparation of outlet works tunnel for outlet works lining and extension. G. Performing bypass pumping or providing siphon flows over the spillway to meet in channel flow requirements during non-irrigation season to allow outlet work construction. H. Excavation of outlet works alignment and Salmon Creek Access Road on the left abutment including rock excavation, cleaning, and rock slope stabilization. I. Construction of outlet works piping including grout encasement and concrete encasement, drainage system, backfill, and inspection well. J. Construction of a new outlet works valve house structure including placement of piping, valves, miscellaneous metalwork, retaining structures, and backfill. K. Rock excavation and channel construction from the new valve house to connection with the existing Salmon Creek channel. L. Construction of the stability berm including: 1. Foundation and bedrock cleaning and preparation, 2. Furnishing and installing filter and gravel blanket and chimney drains, 3. Furnishing and installing perforated and non-perforated high-density polyethylene (HDPE) toe drainpipes, cleanouts, inspection wells, flow measurement weirs, and associated outfall structures. 4. Furnishing and installing the upper and lower Fiber Optic Sensing Cables. 5. Excavating, screening, and transporting borrow material for the embankment berm fill. 6. Furnishing and installing new embankment piezometers and embankment measurement points. M. Installation and construction of relief wells, vaults, and associated piping. N. Final grading and construction of new dam access roads, security gates, and site fencing. O. Final grading and construction of the boat ramp within the Graveyard Flat borrow area. P. Preparing all disturbed areas for future restoration through tracking with equipment to leave rough surfaces. 4. Acquisition Information: - Rough Order of Magnitude (ROM): The Government anticipates a ROM of $80,000,000 to $100,000,000. - Projected Solicitation Date: The Government target solicitation period is late Fiscal Year (FY) 2027 or early FY 2028. - Period of Performance (POP): Approximately 3 years 5. ACTION REQUIRED & SUBMISSION INSTRUCTIONS: Interested industry partners are requested to review the Attachment a. Industry Day Invitation to Industry Partners for action requirements and coordinating information. 6. Attachments: a) Industry Day Invitation b) Reclamation FIST 1-1 Hazardous Energy Control Program c) Non-Disclosure Agreement (NDA)
Who won similar work
9 award notices on SAM.gov in the last 24 months. Matched by: Same office (PACIFIC NW REGION PN 6615), same NAICS 237990.
Single-winner award sizes (9): middle half $1.9M to $7.5M, median $3.8M; range $1.7M to $8.9M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BURKE ELECTRIC, L.L.C. | 1 | $8.9M | Mar 5, 2026 |
| WHH Nisqually Federal Services, LLC | 1 | $7.5M | Jan 22, 2025 |
| PALOUSE POWER LLC | 1 | $7.5M | Mar 9, 2026 |
| WEMCO-GARCO MP JV1 5510 W THORPE RD SPOKANE WA 99224-5371 USA | 1 | $7.4M | Dec 6, 2024 |
| PIPKIN INC. | 1 | $3.8M | Sep 16, 2026 |
| REHBEIN ENTERPRISES INC | 1 | $2.3M | Sep 16, 2026 |
| National Native American Construction, Inc. | 1 | $1.9M | Nov 18, 2024 |
| PARAGON NATIVE LLC | 1 | $1.8M | Aug 31, 2026 |
| GUARDIAN CONSTRUCTION, INC. | 1 | $1.7M | Jan 23, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 16, 2026PIPKIN INC.$3.8MY--Leavenworth Fish Hatchery SWISP Phase II
- Sep 16, 2026REHBEIN ENTERPRISES INC$2.3MY--Speelyi Beach Shoreline Protection, Yakima Project, Washington, Bureau of Reclamation C-PN Region.
- Aug 31, 2026PARAGON NATIVE LLC$1.8MY--Steamboat Rock State Park Shoreline Stabilization, Columbia Basin Project, Washington
- Mar 9, 2026PALOUSE POWER LLC$7.5MY--TOWN OF COULEE DAM UNDERGROUND FEEDERS
- Mar 5, 2026BURKE ELECTRIC, L.L.C.$8.9MZ--Hungry Horse Excitation System Replacement
- Jan 23, 2025GUARDIAN CONSTRUCTION, INC.$1.7MZ--Teton Dam 50th Commemoration Overlook Project
- Jan 22, 2025WHH Nisqually Federal Services, LLC$7.5MY--Clear Creek Dam Fish Passage Facility, Yakima Proj
- Dec 6, 2024WEMCO-GARCO MP JV1 5510 W THORPE RD SPOKANE WA 99224-5371 USA$7.4MY--Grand Coulee Left and Right Powerplants Tailrace S
- Nov 18, 2024National Native American Construction, Inc.$1.9M62--Nathaniel Washington Powerplant - Luminaire Replac
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Bureau of Reclamation since 2024 (0 filings)
- 0 of their lobbyists list a past Bureau of Reclamation job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 0 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.