USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA
Army Corps of Engineers · W075 ENDIST SACRAMENTO
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W9123827X1CHG in this department, oldest first.
- Oct 8, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for Design-Bid-Build (… (show all)
DBB) construction services to conduct Copper Cove Wastewater Treatment Plant (CCWTP) Improvements in collaboration with the Calaveras County Water District (CCWD) in Calaveras County, California (CA). The project is anticipated to include installation of a new continuous backwash filtration system to replace an existing filter system; electrical improvements to include upgrading the existing PG&E service size to the main switchboard located in the Control Building, installing a new transformer, raceways, metering panel, new Motor Control Center (MCC), and associated wiring and components; interconnection with a pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system; installation of a new continuous backwash filter system to include excavation, shoring, and backfill for a partially buried cast-in-place concrete tank with three (3) equipped filter cells (modules), air control panel, grating and handrailing over the filter cells and feed channel; inlet and outlet piping, valves, and connection to existing ultraviolet (UV) inlet piping; and power and control tie-ins. The project is also anticipated to include construction of a new masonry compressor building on a concrete slab foundation, housing a duplex air compressor with space for an additional unit, along with appurtenant equipment on the compressed air piping including a refrigerated air dryer, oil-water separator, and air filter; a new wet well and submersible pump station to include a new buried precast wet well with an adjacent valve vault housing a duplex submersible pump station, valves and appurtenances, piping, and power control conduits constructed adjacent to the new SAF to convey filter backwash waste flow to the SAF. Finally, the project is anticipated to include demolition and disposal of the existing adsorption clarifier and mixed media filter equipment, dewatering of sludge handling facility solids in three (3) containerized, polymer-assisted gravity sludge dewatering systems that will be positioned on a concrete pad with containment walls and drainage systems to capture drained water and return it to Pond 6 through three (3) quick coupler hose connection points (one (1) per bin), and all associated yard pipe modifications to connect the new components to the existing WWTP, generally buried in suitable native or engineered backfill at depths of approximately three (3) to ten (10) feet of cover. The potential requirement may result in a firm-fixed-price construction solicitation issued approximately December 2026. If solicited, the Government intends to award the anticipated requirement by approximately March 2027. The Government estimates that construction of the anticipated requirement can be completed within three-hundred-sixty-five (365) calendar days from Contractor receipt of the Notice to Proceed. Work may also be impacted by bird nesting season, which runs from 1 February through 31 August. If market conditions indicate the estimated period of performance may be unrealistic, Respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The Government currently estimates the target price range for the anticipated project may be between $5,000,000.00 and $10,000,000.00. The North American Industrial Classification System (NAICS) code identified for the anticipated requirement is 237110, Water and Sewer Line and Related Structures Construction. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $45,500,000.00 annual revenue. The Product or Service Code (PSC) for the anticipated requirement is Y1PD, Construction of Waste Treatment and Storage Facilities. If there is a reasonable expectation that two (2) or more responsible small business concerns under the NAICS can provide the anticipated services, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for competition limited to small businesses, Federal Acquisition Regulation (FAR) 52.219-14, Limitations on Subcontracting (Deviation), requires that construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, excluding the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor may be required to self-perform a percentage of work if required in the solicitation. Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements. CAPABILITY STATEMENT: Responses must be limited to ten (10) 8.5 x 11 inch pages with a minimum font size of point 10. Please provide the following information: 1) Company name, System for Award Management (SAM) Unique Entity Identification (UEID) number or Employer Identification Number (EIN), address, point of contact name, contact phone number, contact e-mail address, and statement identifying whether the company employs union or non-union workers. 2) Experience and capability to complete contracts of similar magnitude and complexity to the potential requirement, including at least three (3) examples of comparable work performed within the past six (6) years. Each example should include a brief description of the project, description of the work performed (identification of self-performance and/or Subcontractor management), customer name, customer satisfaction, timeliness of performance, dollar value of the project, and whether there were any challenges experienced during the project (delays, investigations, health and safety issues, labor shortages, management / organizational issues, etc.). 3) Business size and socioeconomic type for the applicable NAICS (ex: Woman-Owned Small Business, Serviced-Disabled Veteran-Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), certified Historically Underutilized Business Zone (HUBZone), 8(a) Participant, small business, or other than small business (large business)). 4) Bonding capability (in the form of a Surety letter). Please submit all capabilities statements, information, brochures, and/or marketing material as one (1) document, limited to the page quantity above. Responses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted or the capability statements received. Please provide responses and/or questions by e-mail to the Contract Specialist, Costa Laliotitis, at (Constantinos.Laliotitis@usace.army.mil) by 0800 / 8:00 a.m. Pacific Time on Monday, 7 December 2026. Please include the Sources Sought Notice number W9123827X1CHG in the e-mail subject line.
Who won similar work
35 award notices on SAM.gov in the last 24 months. Match: Same agency (Army Corps of Engineers), same NAICS 237110.
| Winner | Awards | Value | Last |
|---|---|---|---|
| ORDERS CONSTRUCTION CO INC | 2 | $8.3M | Sep 3, 2026 |
| SOUTHERN CONTRACTING, LLC | 2 | $7.3M | Sep 29, 2025 |
| GARNEY FEDERAL, INC. | 1 | $141.3M | Sep 2, 2026 |
| RED POINT CONSTRUCTION, LLC | 1 | $48.4M | May 18, 2026 |
| MATTHEWS GROUP INC | 1 | $25.0M | Nov 25, 2024 |
| RESPEC COMPANY | 1 | $16.8M | Jun 11, 2025 |
| Gideon Contracting, Limited | 1 | $15.7M | Sep 17, 2026 |
| RANDY KINDER EXCAVATING INC | 1 | $13.4M | Jan 16, 2025 |
| BATES ENGINEERS/CONTRACTORS INC | 1 | $12.3M | Sep 30, 2026 |
| PRAIRIE BAND CONSTRUCTION, INC. | 1 | $11.0M | Mar 18, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 30, 2026BATES ENGINEERS/CONTRACTORS INC$12.3MWater Tank Storage (AM04)
- Sep 29, 2026KOMAN CONSTRUCTION MANAGEMENT, LLC$2.3M88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- AWARD
- Sep 28, 2026SCHUMAN ELECTRIC LLC$368KGavins Point Raw Water Intake Zebra Mussel Mitigation
- Sep 25, 2026RUBY-COLLINS, INC.$9.6MFY26 Medical University of South Carolina (MUSC) Pump Upfit
- Sep 17, 2026Gideon Contracting, Limited$15.7MMidwest City Water Tower
- Sep 4, 2026KONZEL CONSTRUCTION CO INC$929KShenango River Lake Water Tank Rehabiliation
- Sep 3, 2026ORDERS CONSTRUCTION CO INC$4.3MCity of Follansbee Water System Improvements - Section 219
- Sep 2, 2026GARNEY FEDERAL, INC.$141.3MW9123626RA002 New Water Intake Facility at HSAAP
- Aug 28, 2026NOWAK CONSTRUCTION CO., INC.$377KWaterline Boring at Fall River Lake, KS
- Aug 27, 2026CHEROENHAKA NOTTOWAY ENTERPRISES, LLC$511KAqueduct Boilers Preventative Maintenance and Repairs 2026
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.