Loading the records…
Loading the records…
Army Corps of Engineers · W072 ENDIST CHICAGO
Army Corps of Engineers is planning to buy "Thomas J O???????????????????????????Brien Lock and Dam Major Rehabilitation ??????????????????????????? Construction, Chicago, Cook County, Illinois". This is an early notice: it is not taking bids yet. Responses are due Nov 27, 2026. In the last 2 years, similar work (matched on the agency only, a loose match) went to 10 or more companies, usually for about $301K per award. An award is expected between December 2026 and March 2027.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation PANGLR26P0000029409 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
**** BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET SURVEY, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES (IN FULL OR IN PART) OR PROCURED THROUGH FULL AND OPEN COMPETITION. All Small Business Set-Aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. ********** ********** The contract type is anticipated to be Firm Fixed Price construction contract, using FAR Part 15 solicitation procedures. The proposed contract is subject to Construction Wage Rate Requirements. ********** ********** North American Industry Classification System Code (NAICS): 237990 - Other Heavy and Civil Engineering Construction (Size Standard: $45.0M) ********** Product Service Code (PSC): Z2KA - Repair or Alteration of Dams / Navigation Structures ********** Duration of Performance: Estimated at Three (3) Years; 1,095 calendar days. Specifics regarding the number of option periods will be provided in the solicitation. ********** Place of Performance: Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois ********** ********** DISCLAIMER: THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMATION PERTAINING TO THIS REQUIREMENT. ********** ********** PROGRAM BACKGROUND ********** ********** The U.S. Army Corps of Engineers (USACE), Chicago District (LRC), is preparing an acquisition strategy for Phase 2 construction of the T.J. O Brien Lock and Controlling Works Major Rehabilitation project on the Calumet River in Chicago, Cook County, Illinois. The facility features a 110 ft by 1,000 ft lock chamber with concrete-capped circular sheet pile cells and low-lift sector gates regulating water exchange between Lake Michigan and the inland waterway network. As the requiring activity, USACE Chicago District delivers comprehensive engineering, design, and construction management to execute structural, mechanical, and electrical revitalization, ensuring long-term operational reliability and structural integrity. ********** ********** REQUIRED CAPABILITIES ********** ********** The scope of this requirement includes: ********** ********** *Repair and strengthening of the upper and lower guide walls and chamber lock walls through grout injection. ***Repair of a portion of the upper guide wall that was impacted by a barge in early 2026. ***Replacement of the existing sector gate operating machinery with modern equipment Revisions to the sump pump pits under the control houses for ease of maintenance ***Replacement of site hatches and covers, removal of unused pits, and rehabilitation of associated concrete and drains ***Replacement of the culvert valve gates and actuators ***Installation of two new jib cranes to service all four screens for gate openings on the controlling works ***Replacement of all gates and actuators at the controlling works ***Various upgrades to the electrical service, ductbank, and control systems associated with the items previously listed ***Upgrades to the emergency lighting and circuitry in the lock house and maintenance garage ***Upgrades to the backup generator and uninterruptible power supplies ***Revisions to the main lock house roof drain outfall to eliminate backups into the lock house when the lock water near the outlet freezes during cold weather. ********** ********** SPECIAL REQUIREMENTS AND MARKET INQUIRIES: ********** ********** Business Section ********** ********** Section A - CORPORATE CAPACITY and BONDING ********** ********** If your organization has the potential capacity to perform these contract services, please provide the following information: ********** ********** 1. This requirement involves large-scale, high-risk civil works construction. Potential offerors must demonstrate that their available single-project bonding limit and working capital capacity are sufficient to support a single contract whose total commitment significantly exceeds the annual revenue size standard established for NAICS 237990. Please submit a formal letter of bondability from your surety specifying your single-project limit, aggregate limit, and remaining uncommitted capacity. If utilizing a Joint Venture or teaming arrangement to meet bonding and financial underwriting requirements, detail the administrative structure and combined capacity. ********** ********** 2. Please note that under a Small-Business Set-Aside, in accordance with FAR 52.219-14 (Limitations on Subcontracting), the small business prime must perform at least 15% of the work themselves in terms of the cost of performance, excluding materials. Please provide your tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements. ********** ********** 3. Small Business Subcontracting: Should this requirement be solicited as Full and Open Competition, other-than-small-business offerors will be required to submit an acceptable Small Business Subcontracting Plan in accordance with RFO 19.109 and 52.219-9, as applicable. ********** ********** Interested firms are requested to describe their experience meeting small business subcontracting goals on comparable construction projects, identify potential subcontracting opportunities for small businesses, and provide preliminary estimated subcontracting percentages by socioeconomic category. Firms should also identify anticipated challenges and strategies to maximize small business participation. ********** ********** 4. Provide a comprehensive company profile including current small/large business status and socioeconomic ownership status (Small, Small Disadvantaged, Women-Owned, HUBZone, or Service Disabled Veteran-Owned Small Business Concern), company profile to include number of employees, annual revenue history, office locations, UEI number, etc. ********** ********** 5. Can or has your company managed a team of subcontractors before? If so, provide details. ********** ********** 6. Can or has your company managed a task of this nature? If so, please provide details. ********** ********** SECTION B - PROJECT LABOR AGREEMENT (PLA) EVALUATION ********** ********** To assist USACE in evaluating the practicability, efficiency, and market impact of a Projec
1921 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Corps of Engineers), any industry: a loose match.
Loose match: same agency, any industry. Read the titles before treating these as competitors.
Single-winner award sizes (1701): middle half $72K to $4.5M, median $301K; range $2K to $1.1B.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CURTIN MARITIME CORP | 13 | $155.3M | Sep 29, 2026 |
| GREAT LAKES DREDGE & DOCK CO, LLC | 12 | $281.0M + 2 shared | Sep 28, 2026 |
| MADCON LLC | 10 | $2.5M | Sep 2, 2026 |
| Aantilia LLC | 10 | $1.5M | Sep 29, 2026 |
| RYMARC CONSTRUCTION INC | 9 | $1.5M | Sep 18, 2026 |
| MANSON CONSTRUCTION CO Seattle WA 98134 USA | 8 | $75.5M + 3 shared | Sep 14, 2026 |
| BRANNON CONTRACTING & MAINTENANCE SERVICES, LLC | 8 | $6.4M | Aug 20, 2026 |
| WEEKS MARINE, INC. | 7 | $230.1M + 2 shared | Sep 28, 2026 |
| COTTRELL CONTRACTING CORPORATION | 7 | $124.9M | Sep 23, 2026 |
| PURESERVICE CORP | 7 | $3.2M | Sep 3, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.