SolicitationPosted Dec 10, 2025·Responses due Jan 5, 2026

Z1AA--36C25726R0013, 674-22-107 - Replace Cart Elevators - Surgery

Veterans Affairs · 257-NETWORK CONTRACT OFFICE 17 (36C257)

Stage
Open solicitation
NAICS
238290
Value
Not stated
Solicitation
36C25726R0013
Set-aside
None stated
PSC
Z1AA
Place
Not stated
Contact
Horacio Fernandez (Horacio.Fernandez@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C25726R0013 in this department, oldest first.

Early notice
  • Oct 21, 2025
    Pre-solicitation
    Open
Solicitation
  • Nov 6, 2025
    Solicitation
    Open
  • Nov 7, 2025
    Solicitation
    Open
  • Nov 16, 2025
    Solicitation
    Open
  • Dec 10, 2025 · this notice
    Solicitation
Award
  • Mar 2, 2026
    Award Notice
    Veteran Elevated Solutions, LLC · $2.5M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Central Texas Replace Cart Elevators Solicitation: 36C25726R0013 Replace Cart Elevator Surgery Building 163 Request for Information Questions and Answers Will the Client allow advanced payments (down payments) for any material or equipment to be procured under this solicitation, or will invoicing be restricted to when the physical materials and/or equipment have been delivered to the project site? The VA will only pay for materials and/or equipment after it is installed Per Spec Section 1.7 - Site Safety and Health Officer (SSHO) and "Competent Person" (CP) the VA is requiring a minimum of one… (show all)

SSHO at each project site that will be identified as the SSHO to administer the Contractor's safety program and government-accepted accident prevention plan. Can the VA please confirm that the Prime Contractor is only required to have one Superintendent for the project? Confirmed If the elevators are modernized consecutively, please confirm that the contractor is only required to have one SSHO onsite? Confirmed Can the VA please confirm the Prime Contractor does not need to have a QCM on the project? Confirmed Can the VA please identify a lay down area on site where contractors can stage materials and equipment? Lay down yard will be identified after contractor is selected Will the Prime contractor be responsible for providing a site office, or is there an on-site area we can use? Lay down yard will provide enough space for an office Conex Will Microsoft Project be an acceptable scheduling tool for the project? Yes What software will be utilized on the project for submittal transfers? Will the Prime contractor be responsible for purchasing and maintaining? All transfers will be done through email There are no Fire Alarm drawings within the bid package, can the VA please confirm there are no modifications of Fire Life Safety devices either in the Elevator lobbies, or hoist way that will need to be modified? If there are devices that will need to be addressed, can you please provide the contact information for the building's existing Fire Alarm Vendor? A8.1 GC shall coordinate all activities during the construction and at completion of the work with the local Fire and Life Safety AHJ. Emergency Fire and Life Safety devices shall be maintained throughout the construction. GC shall post the Emergency Contact information throughout the work area. A8.2 GC shall not disturb the Existing Fire Alarm systems in the elevator shafts or outside of the shafts unless the work requires relocation of any existing devices. All work related to the fire alarm system shall be coordinated with the local Fire and Life Safety AHJ. The new two offices shall be equipped and protected with new fire alarm devices per the VA building code and connected to the existing alarm system. Coordinate the new work with the local Fire and Life Safety AHJ. A8.3 Local Fire and Life Safety AHJ contact information: CTXSafety@va.gov The Fire Alarm System Vendor contact information: Kevin D Moseng Project Manager Fire Domain Johnson Controls Fire Protection LP 512-608-0493 Note 5 on AD3.00 states to remove hospital equipment and store for re-installation. Will the VA be providing an area to store existing equipment? A9.1 It is the General Contractor s (GC s) responsibility to protect and store all salvaged items that will be reinstalled. GC can utilize the allowed construction staging areas shown in drawing AD1.20 for this purpose; however, if the GC requires additional spaces for both construction and storage, it may be possible to coordinate the matter with the VA PM after the contract is awarded. Details 7A and &7C on AD2.00 appear to show temporary wall details, for the ICRA requirements. If so, is the VA open to utilizing Starc or Temporary wall systems in lieu of wood framing? A10.1 VA is open to an alternate method to separate the construction area and the sterile area, if the GC can demonstrate how they can achieve full and complete separation. Will the VA confirm that no negative air systems are required for the ICRA requirements? Negative Air Systems are required Will the VA confirm ICRA barriers do not need to extend above the finished ceiling to deck? Barriers need to extend to the deck Per the room finish schedule, Office BD108B will be receiving new 2x2 ACT ceiling tile, flooring and base to match existing adjacent offices. Can the VA please provide existing product information for the ceiling tile, flooring and base? A13.1 That information requested is not available. GC shall do its best to match the materials; however, GC shall submit samples of all proposed materials, in accordance with the submittal process in Div. 1, for the DOR s approval. The SOW reads that the project "may" require after hours or weekend work due to surgery departments. Can the VA please provide further details/clarification or a percentage of off-hour work required on the project, for bidding purposes? Any work that is disruptive to any ongoing hospital operations must be scheduled for weekends or after hours Are the cart lifts currently functioning under emergency power, if so, are ATS feeds and equipment in place from the generator to the disconnects control space? A15.1 The existing elevators are operational under emergency power, and the locations of the existing elevator power sources are identified on the sheet AD1.10. GC shall investigate and verify the adequacy of the existing power for the new construction. GC shall notify the VA PM and DOR of any deviations shortly after NTP. Can the VA please confirm that the costs and scheduling associated with the third-party inspections will be the responsibility of the VA and not part of SOW? There are no third-party inspections Can the VA confirm that there is no cart elevators machine room and that the disconnect and controller will be located adjacent to the 24' x 24' access door at the top landings "machine space"? A17.1 GC shall provide new mech-room-less elevators per the contract, including control panels and disconnect switches in the elevator shaft above the top landing, as indicated on drawing sheet A2.00. Can the VA please confirm the 600v service required per the drawings is existing and available? A18.1 It is the GC s responsibility to visit the construction site and verify the existence of the required power. If GC finds that no such power is available, it shall notify the VA PM and DOR of any deviations shortly after NTP. Can the VA please confirm in the event of a conflict which documents should prevail? Specifications take precedent over drawings. However, any conflicts between the two shall be brought to the attention of the VA immediately. Can the VA confirm that the desired rope size will be determined by the manufacturer rather than the specified rope size listed of .50 inches? A20.1 GC shall perform engineering and design of the new cart elevators and provide the elevator to the specifications. However, GC shall not reduce the capabilities or the product to a level below those of the specified elevator system. If the GC proves that the specification is inadequate to meet the intended use, the GC shall notify the VA PM and DOR of any deviations within a reasonable time after NTP. The basis of design is Matot Inc. Is the VA aware of the extremely long lead- times with the specified equipment? Will the VA be open to extending the POP to accommodate lead times? Any proven order delays will be added as a no-cost time extension. Note 2 on E1.1 - directs the Electrician to remove the cart lift main feeder back to source. A) Can the VA confirm what room the main feeder source is located in? B) Is the main feeder routed in an area accessible to our team during normal working hours, or will we have to complete demo of the main feeder on OT if working in occupied areas, of the building? A22.1 GC shall refer to the drawing sheet AD1.10 for those electrical rooms BC 106 and BD 110 for the main feeders. A22.2 The adjacent spaces next to the work areas are fu

Who won similar work

6 award notices on SAM.gov in the last 24 months. Matched by: Same office (257-NETWORK CONTRACT OFFICE 17 (36C257)), same NAICS 238290.

Single-winner award sizes (6): middle half $588K to $1.5M, median $685K; range $44K to $4.2M.

WinnerAwardsValueLast
TEXAS VELOCITY ENTERPRISES, LLC1$4.2MAug 4, 2025
Veteran Elevated Solutions, LLC1$1.8MJun 29, 2026
MONUMENT CONSTRUCTION SERVICES, LLC1$745KDec 4, 2025
VALCORP ENTERPRISES LLC1$625KAug 24, 2026
JOHNSONDANFORTH, INC1$575KAug 24, 2026
Innovators Transportation LLC1$44KAug 31, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.