Y1NZ--659-24-903 | Steam Line Replacement | Salisbury, NC 28144 W.G. Hefner VA Medical Center
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24626R0068 in this department, oldest first.
- Jun 26, 2026Pre-solicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Steam Line Replacement Statement of Work (SOW) The Department of Veterans Affairs has a need to maintain the existing infrastructure of the facility, which includes the steam that supplies the facilities heating of spaces and items. The Veterans Affairs Medical Center is pursuing a project to replace the existing steam lines across the campus. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Project 659-24-904: Salisbury Steam Line Replacement as required by drawings a… (show all)
nd specifications. Estimated construction duration is 365 days. Additionally, the contractor will provide one (1) year of construction warranty. The construction duration will remain at 365 days with the acceptance of bid items 1 and 2, as these items would be performed in conjunction with other construction. Civil EXISTING CONDITIONS Steam Distribution for the site is currently supplied by a steam line constructed back in 1989 which was to replace the older and now abandoned 1965 steam line. During the initial site visit during the hazmat survey of the 1989 (and later 1965) line s insulation materials, it was determined that a new line could be constructed along the pathway of the old 1965 steam line. The scope of work is to replace a portion of this steam line from buildings 10 to 18 (or Manholes 17B through 15), while keeping existing manholes 17B and 16A. DEMOLITION & TRENCH WORK Portions of the 1965 steam line will need to be abated and removed from the ground so that the new proposed steam line can be laid in place. This will require site prep, traffic control and trenching of the existing landscape, including demolition and replacement of concrete sidewalk panels. During demolition, any good in-situ soil shall be kept to reduce the amount of off-site fill required to fill in the trench. All existing utilities that are not a part of the scope that are encountered while excavating the trench shall be left alone and left in place. When encountering roadways, the path will be bored through and a 24-inch steel jacket (with supports for the steam line) will be installed so that the steam line can be brought through and connected to the other side. NEW WORK A new proposed steam line that connects manhole 17-B to manhole 15 shall be installed within the trench and bore hole provided during the demolition and trench work of the construction. Once the new steam line has been installed, tested, and commissioned, the trench will require backfilling back to existing grade. Additionally, the 1989 steam line will be decommissioned and abandoned in place at this time. Three (3) new manholes will be constructed along the path of the old 1965 steam. See the structural section for more details. Structural EXISTING MANHOLES There is one existing manhole that will be re-used as a part of the current redesign, MH-D (renamed MH-10B). There will be a new opening created for both condensate and steam piping in the existing walls. The new openings will need to be larger than the pipe penetration and squared with additional rebar reinforcement installed around the opening. After service has been transferred to the new steam line, the existing steam line will need to be removed and the existing holes repaired. When the manhole sides are exposed for pipe installation, new waterproofing should be provided prior to backfilling. Additionally, the existing rebar ladder rungs have become corroded and need to be removed and patched with a new rung ladder added. There are also (2) existing manholes that will be removed in their entirety (MH-C & MH-10A) and (2) existing manholes that will be replaced (MH-A & MH-B) as they are too small to accommodate the new piping required. EXISTING BUILDING CONNECTIONS New penetrations through the below grade walls to the Building 16 Laundry and Building 17 Facilities will be required for both condensate and steam piping. After service has been transferred to the new lines, the existing lines will need to removed and the existing holes repaired. Both Building 16 and 17 were part of the original construction of the campus, designed in 1949 by Walter, Hook & Associates (VA Project #2448). The foundation for Building 16 has a basement wall that extends to about 8 -0 below grade and is comprised of 12 thick concrete with #4 at 12 o.c. each way each face. The foundation for Building 17 does not have a basement and it is indicated that the wall extends at least 2 -0 below grade and is comprised of 12 ½ thick concrete with #4 at 14 o.c. each way each face. NEW MANHOLES There are (5) new manholes planned in the current redesign, MH-15A, MH-15B, MH-16A (previously MH-A), MH-17B (previously MH-B) and MH-17C. These manholes will be cast-in-place concrete and meet or exceed the requirements as indicated in the VA Concrete Steam Manhole with Typical Piping Detail (SD336300-01). The concrete walls, floors, and lid will be 12 thick concrete reinforced with #5 at 12 o.c. each face horizontal and vertical, except for lid reinforcing will be #5 at 10 o.c. Plumbing EXISTING CONDITIONS Condensate from the steam piping distribution and end-use equipment is currently returned to the boiler plant in Building 18 through the existing condensate return branches and main distribution piping. The existing condensate piping will be replaced with this project scope of work, so the temporary discharge of this condensate to the nearest sanitary connection at each location will need to be accommodated. TEMPORARY FACILITIES AND PHASING The existing condensate return piping will be maintained until the new condensate return piping is installed. Once the new condensate return main is installed, tested, and commissioned, the existing condensate return branch piping will need to be connected to this new condensate return main. During this construction period, the condensate generated from the existing steam main and end-use equipment shall be quenched and indirectly discharged to the nearest sanitary main. Once the new condensate return branch piping is installed, tested, and commissioned with the new main, these temporary condensate discharge connections shall be demolished. NEW WORK New indirect sanitary connections will be made at each branch connection to the existing condensate return main. The indirect connections will also incorporate a domestic cold water quench valve to temper the condensate discharge to 140°F before discharge into the sanitary main. These indirect sanitary connections shall be demolished once the new condensate return branch connections have been made with the new condensate return mains. Mechanical EXISTING CONDITIONS The 1965 Steam Distribution As-Built Drawings show 12 high-pressure steam and 6 condensate return piping routed to Manhole #17, where a branch of 2 steam and 1-1/2 condensate return piing serves the Utility Shops & Warehouse. The 12 steam and 6 condensate return piping then extends from Manhole #17 to Anchor A-4, where it branches off to serve the laundry facility with 5 steam and 3-1/2 condensate return piping. From Anchor A-4, 10 steam and 6 condensate return piping extends past Manhole #1 to Anchor A-7. From Anchor A-7, branch piping is distributed at 8 steam and 4 condensate return piping to serve Building 10. Another branch extends from Anchor A-7 at 3-1/4 steam and 1-1/4 condensate return piping to serve the Engineering facility. The 10 steam and 6 condensate return mains extend downstream of Anchor A-7 to serve the remainder of the campus. The 1989 Steam Distribution Model shows 10 steam and 6 condensate return piping from the boiler plant to Manhole A . A branch of 2 steam and 1-1/2 condensate return piping serves the Utility Shops & Warehouse. The mains continue at 10 steam and 6 condensate return piping from Manhole A to Manhole B . A branch of 4 steam and 2-1/2 condensate return piping serves the laundry facility. Downstream of Manhole B ,
Who won similar work
9 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same NAICS 238220.
Single-winner award sizes (9): middle half $408K to $1.2M, median $592K; range $38K to $7.2M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| PHILLIPS C&C LLC | 1 | $7.2M | Jun 11, 2026 |
| DRI, Inc | 1 | $5.9M | Sep 3, 2026 |
| RILEY CONTRACTING GROUP, INC. | 1 | $1.2M | Mar 26, 2026 |
| ACRO CONSTRUCTION, LLC | 1 | $678K | Mar 10, 2026 |
| SCHAIBLE, MARK PELHAM 03076 NHB | 1 | $592K | Nov 6, 2025 |
| MGI, INC. | 1 | $499K | Jun 24, 2026 |
| EWA DIRECTION INC. | 1 | $408K | Dec 5, 2024 |
| SCIPACT LLC | 1 | $311K | Apr 8, 2025 |
| CALDAIA CONTROLS LLC | 1 | $38K | Jul 18, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 3, 2026DRI, Inc$5.9MSteam Line Replacement | Salisbury VAMC |No listed company matched (Materiality N/A)
- Jun 24, 2026MGI, INC.$499KZ1DA--Repair Med Gas System 658-26-121No listed company matched (Materiality N/A)
- Jun 11, 2026PHILLIPS C&C LLC$7.2MZ1DA--Upgrade HVAC System Phase IINo listed company matched (Materiality N/A)
- Mar 26, 2026RILEY CONTRACTING GROUP, INC.$1.2MY1JZ--558-23-155 Generator Exhaust Modification GCNo listed company matched (Materiality N/A)
- Mar 10, 2026ACRO CONSTRUCTION, LLC$678KZ2DA--Replace Auxiliary ChillerNo listed company matched (Materiality N/A)
- Nov 6, 2025SCHAIBLE, MARK PELHAM 03076 NHB$592KJ045--BOILER AND DEAERATION(DA) TANK RENTALNo listed company matched (Materiality N/A)
- Jul 18, 2025CALDAIA CONTROLS LLC$38KH945--Boiler InspectionsNo listed company matched (Materiality N/A)
- Apr 8, 2025SCIPACT LLC$311KZ1DA--652-25-100 HVAC Controls Replacement Award NoticeNo listed company matched (Materiality N/A)
- Dec 5, 2024EWA DIRECTION INC.$408KJ045--Cooling Tower Chemical and HVAC MaintenanceNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.