Z2DA--512A5-25-003 Repair 23H Fire Damage
Veterans Affairs · 245-NETWORK CONTRACT OFFICE 5 (36C245)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24525B0003 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
SCOPE OF WORK PROJECT DATA: VA Project Title: Building 23H Fire Damage Repairs VA Project No: 512A5-25-003 VA Facility: Perry Point VA Medical Center Perry, Point, MD Period of Performance: 90 calendar days from contract Notice to Proceed Project Background: On the evening of October 23, 2024, a fire occurred located on the roof of Building 23H. The fire was extinguished with no major damages to 23H. There was minor damages and wetted areas from the use of fire hoses. A remediation contractor was engaged to remove all wetted ceiling tiles, wetted carpet, wetted drywall, wetted wall base, and w… (show all)
etted insulation from the project site. A separate contract is now being contemplated to complete the repair/restoration work required to return the damaged building areas to active service use. Work Scope: Work Item 1: The contractor shall provide all supervision, labor, materials, and equipment to replace the acoustical ceiling tiles, flooring, gypsum board walls, and wall base that were previously removed as part of the fire damage cleanup. Attachment 1 contains a detailed breakdown of the projected repair area included in each room for ceiling tiles, flooring, drywall, paint, and wall base. Approximate total areas for repairs under project to be included in bid: 1610 SF of new gypsum board wall installed on existing metal studs/hat channel. 1640 SF of acoustical ceiling tile (including minor repairs to existing suspension grid) 578 LF of rubber wall base 1184 SF of carpet tile and mastic 250 SF of luxury vinyl plank flooring and mastic 6685 SF of wall patching/skim coat and painting. 4th Floor office suite to be fully repainted after wall repairs. Coordinate color selections with COR. Contractor shall include the removal and reinstallation of existing wall paintings, door tags, TV mounts, bulletin boards, and other signage/artwork as required to repair and repaint walls. VA to provide temporary storage location. Contractor to provide and install a new grid-supported HVAC supply diffuser (2x2) with manual damper and flexible ductwork in room 409 to replace one removed during demolition phase. Coordinate with existing duct size. Contractor shall remove and replace all electrical receptacle and switch cover plates within the work area that were damaged during the water damage remediation phase. Replacement cover plates shall be type 302 stainless steel matching the type and color removed. Oversize plates are not acceptable. Contractor shall remove and rebuild the existing 2HR rated UL shaft-wall system (UL U415 System B) around the existing generator exhaust pipe (including 1 Type X gypsum liner panel, 2½ CH metal studs, and 2 layers of 5/8 Type X gypsum board). Contractor shall include all accessories required for the complete installation of all finish systems, including but not limited to stainless-steel flooring transition strips, light-gage or wood furring/blocking, and ACT suspension grid accessories/pieces for repairs. All joints between gypsum board and other materials shall be fully caulked prior to painting. Work areas are currently isolated from the rest of the hospital with temporary partitions (hard wall or plastic sheeting). Contractor shall provide for any supplemental infection control barriers and ICRA preventative measures required by the work. Level 3 Infection Control Risk Assessment (ICRA) Controls (including negative pressure exhaust) will be required during all drywall and flooring work to control dust and fumes. Work Item 2: The contractor shall engage the services of a Maryland State licensed abatement contractor to remove approximately 1300 SF of residual black mastic from previously removed tile flooring on the 4th floor upper level (rooms 406-410 and 4th floor corridor). Existing mastic is non-friable and has been previously scarified by mechanical means, but a residual base layer remains that must be removed by chemical means. VA will provide their own VPIH consultant to conduct background air monitoring and clearance testing for internal purposes. Contractor shall provide their own separate CIH in accordance with OSHA to conduct continuous air monitoring and final TEM clearance after removal of material. Contractor shall provide legal disposal of all asbestos waste per COMAR 26-11-21-08 Asbestos Waste Disposal. Records of hazardous waste disposal (such as manifests, hazardous waste profiles, LDRs) MUST be provided by approved waste transporter and signed by an approved VAMHCS Manifest signer from the VAMHCS Safety Department ONLY. All records provided to COR and VAMHCS GEMS Coordinator at VAMHCSGEMSProgram@va.gov 10-day NESHAPS notification to MDE and the EPA for demolition or renovation (40 CFR § 61.145, Figure 3, Notification of Demolition and Renovation), Provide completed copy to VAMHCS Projects COR. Prepare and submit asbestos abatement plan to VAMHCS Projects COR for approval before proceeding with work. Work Item 3: The contractor shall seal existing penetrations within the work area between floors with the appropriate fire-rated material and/or fire caulking. This scope specifically shall include: Installation of a UL-listed 2hr fireproofing assembly around an existing generator exhaust pipe penetration through the concrete floor at the 2nd, 3rd, and 4th floor levels (located in the corner of room 1G-108, 227, 323, and 409). Approximate floor penetration is roughly 18 x18 with a 12-14 diameter insulated pipe passing though. Basis of Design UL Firestop Assembly shall be C-AJ-5210 . Infill/Fireproofing around all existing radiator steam pipe penetrations within the work area. Approximate 4 diameter hole with ½-2 diameter pipe. Basis of Design UL Firestop Assembly shall be C-AJ-1551 . Contractor shall include infill of (2) penetrations at each radiator (located below windows within work area) in proposal. Safety and Environmental Precautions: The Contractor shall comply with all applicable Federal, State, and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. OSHA and VA CONSTRUCTION SAFETY STANDARDS shall be enforced. Contractor Supervisor must have 30-hour OSHA Construction Safety course. All contractor employees must have 10-hour OSHA Construction Safety course. Follow all ICRA guidelines for dust control during all construction and demolition work. A construction dust Risk Assessment will be conducted by the Medical Center s Infection Control Nurse. Bi-weekly inspections of barriers and work areas will be conducted by Infection Control Nurse, Safety Manager, and COR to enforce implementation of risk assessment. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regards to exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants. The work is in a professional environment, employees must conduct themselves accordingly. Employees shall not use abusive language, carry firearms, or bring alcoholic beverages on site. Employee's dress code shall consist of normal work uniform. Shirts must be worn at all times. No flammable liquids shall be stored or used in the medical center. The Contractor shall receive from the station fire department a permit for all cutting, welding, and soldering. All permits shall be prominently displayed during all construction. Permits must be opened at the start of each activity and closed at the end of each workd
Who won similar work
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (245-NETWORK CONTRACT OFFICE 5 (36C245)), same product/service code (PSC) Z2DA and NAICS 236220.
Single-winner award sizes (4): middle half $331K to $561K, median $387K; range $251K to $993K.
| Winner | Awards | Value | Last |
|---|---|---|---|
| VENERGY GROUP LLC | 1 | $993K | May 7, 2025 |
| KAR CONTRACTING LLC | 1 | $417K | May 14, 2025 |
| Arrow Consulting and Services, LLC | 1 | $357K | Jan 22, 2025 |
| AmeriTech Contracting LLC | 1 | $251K | Jun 5, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Jun 5, 2025AmeriTech Contracting LLC$251KZ2DA--512A5-22-704 - EHRM INSTALLATION OF NEXTGEN WIFI - SITE PREP PHASE (VA-25-00033391)No listed company matched (Materiality N/A)
- May 14, 2025KAR CONTRACTING LLC$417KZ2DA--Build Emergency Parking (VA-25-00059149)No listed company matched (Materiality N/A)
- May 7, 2025VENERGY GROUP LLC$993KZ2DA-- Renovate Building 500 into a Patient Business Center at Martinsburg, WV.No listed company matched (Materiality N/A)
- Jan 22, 2025Arrow Consulting and Services, LLC$357KZ2DA--Repair Hillside Slip 540-23-104No listed company matched (Materiality N/A)
Competitive landscape
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.