ACTUATOR,ELECTRIC
NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT MECH
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N0010426QTC33 in this department, oldest first.
- Sep 17, 2026 · this noticeSolicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTACT INFORMATION|4|N771.6|KB2|771-229-0383|valentino.p.arena.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|SW3117|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Valentino Arena (valentino.p.arena.civ@us.navy.mil)| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| C… (show all)
ONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 180 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION o Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ACTUATOR,ELECTRIC . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ACTUATOR,ELECTRIC repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;11859 PT100852; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection
Who won similar work
30 award notices on SAM.gov in the last 24 months. Match: Same agency (NAVSUP (Naval Supply Systems Command)), same NAICS 336413.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Raytheon Company · $RTX | 7 | $611.7M | Apr 30, 2026 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION · $NOC | 3 | $3.4M | Dec 1, 2025 |
| SIKORSKY AIRCRAFT CORPORATION · $LMT | 3 | $880K | Apr 14, 2026 |
| HONEYWELL INTERNATIONAL INC. · $HON | 2 | $92.6M | Feb 12, 2025 |
| S & K Aerospace, LLC | 2 | $59.2M | Apr 8, 2026 |
| PARKER-HANNIFIN CORPORATION · $PH | 2 | $19.6M | May 12, 2026 |
| Moog Military Aircraft LLC · $MOG-A | 1 | $25.9M | May 18, 2026 |
| AEROKOOL AVIATION CORP | 1 | $1.2M | Apr 28, 2026 |
| PACIFIC SCIENTIFIC COMPANY | 1 | $692K | Apr 8, 2025 |
| GA TELESIS LANDING GEAR SERVICES, LLC | 1 | $610K | Jul 15, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 2, 2026FAIRBANKS MORSE, LLC$69KIntent to Sole Source � Fairbanks Morse LLC � LT Water Connecting Box Assembly
- Jun 2, 2026COX & COMPANY$9KN0038326PR0R618_FMS
- May 18, 2026Moog Military Aircraft LLC$25.9MNotice of Award - Long-Term Requirements Contract
- May 12, 2026PARKER-HANNIFIN CORPORATION$17.8M16--SERVOCYLINDER, IN REPAIR/MODIFICATION OF
- Apr 30, 2026Raytheon Company$4.1M16--POWER AMPLIFIER ASS
- Apr 28, 2026AEROKOOL AVIATION CORP$1.2MTURBINE,AIRCRAFT CO; Qty: 65
- Apr 22, 2026SHERWOOD AVIONICS AND ACCESSORIES, INC.$24KN0038326PF054
- Apr 22, 2026MISSION SYSTEMS DAVENPORT INC.$115K16--BED ASSEMBLY,OXYGEN, IN REPAIR/MODIFICATION OF
- Apr 14, 2026SIKORSKY AIRCRAFT CORPORATION$43KSpare, QTY 6, SOL # N00383-26-Q-FA36
- Apr 8, 2026S & K Aerospace, LLC$4.4MP-8 Commercial Repair Long Term Contract
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 3 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (35 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- $1.5M from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 6 of the past winners are listed companies
- 0 insider buys and 8 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.