X1DB--Dothan, Alabama Outpatient Clinic Lease: New Replacing Lease
Veterans Affairs · 247-NETWORK CONTRACT OFFICE 7 (36C247)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24723R0075 in this department, oldest first.
- Mar 15, 2024Combined Synopsis/SolicitationOpen
- Mar 18, 2024Combined Synopsis/SolicitationOpen
- Mar 18, 2024Combined Synopsis/SolicitationOpen
- Mar 29, 2024Combined Synopsis/SolicitationOpen
- Apr 11, 2024Combined Synopsis/SolicitationOpen
- Apr 18, 2024Combined Synopsis/SolicitationOpen
- May 23, 2024Combined Synopsis/SolicitationOpen
- May 23, 2024Combined Synopsis/SolicitationOpen
- Jul 2, 2024 · this noticeCombined Synopsis/Solicitation
- Jan 29, 2025Combined Synopsis/SolicitationOpen
- Jan 29, 2025Award NoticeHEALTH CENTER DEVELOPMENT, LLC · $15.6MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Response to Questions from Prospective Offerors along with attachment P (Lease Design Narrative) Response to Questions from Prospective Offerors 1. Please confirm that there are no additional rooms in Exhibit L Revised Statement of Work. The Prosthetics and Dispensing department do not have a room quantity or SF total and it looks like this department may have been cut off. Response: No additional rooms 2. Will a loading dock with overhead coiling door be required for the logistics area where service vehicles will be making deliveries? If so, what size service vehicle should the site be design… (show all)
ed for, and will the dock need to be recessed or at-grade? Response: Yes. See leasing design narrative. 3. Is a drop off drive required by the main vestibule for patients? If so, for how many vehicles should the drive be sized for? Response: Yes. See leasing design narrative. 4. Is a drop off canopy required by the main vestibule for patients? If so, will the canopy need to fully cover a vehicle(s) or can it cover the passenger side only? Response: Yes. See leasing design narrative. 5. Is an emergency generator required? If so, what is required to be on the generator, and what is the required run time? Response: Yes. See leasing design narrative and sizing to be determined during design. 6. Are there any areas that require separate HVAC rooftop units from the rest of the building? Response: Determined during design. Refer to TIL design requirements. 7. Will an MRI or mobile technology pad be required? Response: Are you asking if going to be external to building? No, if this is what you are asking. 8. Will the VA or GSA issue conceptual floor plans for the provided rooms? Response: No 9. Will a bike rack(s) be required? Response: No 10. Will EV charging station be required? If so, what level of EV charging? Response: No 11. Should we adhere to the 2008 VA Interior Design Manual, or should we prioritize the 2020 version that reflects more recent guidelines? Response: Most recent 12. What size of trucks should the loading dock be designed to accommodate? Response: See leasing design narrative. 13. RLP Section 3.08A states that Offerors should not price Tis until DIDs are approved in writing by the LCO. If the DID workshop is after the initial offers, does that mean the initial offers should only consider core/shell costs? Response: Offerors should submit test fit diagram/design intent drawing with their initial offer 14. Lease Section 3.48A states the Lessor shall obtain certification of silver level for LEED-NC. Lease Section 3.49A states the space must obtain a certification of silver level for LEED-ID+C. These are two different LEED systems. Which of these LEED systems should be followed? Response: Do not attempt to complete L100 form at this time. 15. Lease Section 3.48A states the Lessor shall obtain certification of silver level for LEED-NC. There is another lease section 3.48A that states the project must obtain 2 Green Globes for new construction. Similarly, lease section 3.49A states the Lessor shall obtain certification of LEED-NC Silver and another section 3.49A states the project must obtain 1 Green Globe for sustainable interiors. Should the project follow LEED or Green Globe? Response: Do not attempt to complete L100 form at this time. 16. Confirm that the offeror s initial bid documentation should include all items described within RLP sections 3.03, 3.06, 4.04, 4.05, 4.07, and 4.08.� Response: Yes� 17. Will all offerors move to the DID workshop phase, or only those who are deemed by VA to have met the lease technical requirements? Response: Offerors should submit test fit diagram/design intent drawing with their initial offer 18. Confirm that offeror s initial pricing should only include shell and operating expenses, and TI and BSAC pricing are to be provided after the offeror s DIDs are approved. Response: Offerors initial offer should include TI (using the TICS Table) and BSAC pricing. This TICS should be based on the test fit diagram/design intent diagram developed from the statement of work/agency specific requirement. 19. Confirm that this project will be required to achieve certification from Energy Star, LEED NC silver, and LEED ID+C certified. I see this documentation in many RLPs only to find out later that it is not actually required. Response: The project TIs shall incorporate any necessary design parameters for the Space to meet Leadership in Energy and Environmental Design for Interior Design and Construction requirements (at the minimum Certified level) into the Design Intent Drawings (DIDs), if applicable, or Construction Drawings.� 20. Does VA have any exterior façade design requirements? Response: No 21. Would VA be willing to provide the offeror with a set of plans and elevations for a typical CBOC that would assist the offeror in determining the best design for VA s mission? Response: Not available
Who won similar work
3 award notices on SAM.gov in the last 24 months. Matched by: Same office (247-NETWORK CONTRACT OFFICE 7 (36C247)), same NAICS 531120.
Single-winner award sizes (3): middle half $1.5M to $3.2M, median $2.9M; range $38K to $3.6M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| WM OAK HILL PARK HOLDINGS, LLC | 1 | $3.6M | Oct 23, 2024 |
| AUGUSTA MEDICAL PARTNERS, LLC | 1 | $2.9M | Oct 30, 2024 |
| CROWNE INVESTMENTS INC | 1 | $38K | Oct 22, 2024 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Oct 30, 2024AUGUSTA MEDICAL PARTNERS, LLC$2.9MAUGUSTA WOMEN WEALTH CLINIC AS-BUILTNo listed company matched (Materiality N/A)
- Oct 23, 2024WM OAK HILL PARK HOLDINGS, LLC$3.6MSucceeding Lease Award NoticeNo listed company matched (Materiality N/A)
- Oct 22, 2024CROWNE INVESTMENTS INC$38KX1DB--Succeeding Lease for Monroeville CBOC (VA-23-00004115)No listed company matched (Materiality N/A)
Competitive landscape
For the 3 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.