Building Automation Support (BAS) Vancouver WA and Portland Oregon VA Medical Centers.
Veterans Affairs · 260-NETWORK CONTRACT OFFICE 20 (36C260)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C26026Q0816 in this department, oldest first.
- Jul 16, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Solicitation: 36C26026Q0816 Amendment number: 0002 Questions from vendors Kick-Off What is the anticipated timeline for contract award and contract kickoff? 30-45 days Estimated contract award is estimated to be 8/31/2026 � 9/4/2026. Contract Kickoff is estimated to be 9/7/2026 � 9/11/2026. How long will the awardee have to staff and start first months service? Answer: Unknown / This will be discussed at the kickoff meeting Scope and System Depth (PWS 1.2, 1.5.a-b) The PWS states maintenance and service will be performed "throughout the two campuses as applicable," but does not quantify the sy… (show all)
stem footprint. Is there a hardware list for the supervisory panels and firmware? Answer: Unknown / This will be discussed at the kickoff meeting What is the approximate device/point count at each campus? Answer: Unknown / This will be discussed at the kickoff meeting How many buildings or systems are currently under Delta control at each site? Answer: Unknown / This will be discussed at the kickoff meeting Section 1.5.a references "proactive upgrades" as part of the scope. What is the current WebCTRL/ORCAview version, and is any platform upgrade or expansion planned during the base period or option years? Answer: Unknown / This will be discussed at the kickoff meeting Are sensor calibrations required as part of the preventative maintenance scope? If so, please advise on the current workload or required frequency. Answer: Unknown / This will be discussed at the kickoff meeting Is there an incumbent providing this service? Answer: Unknown / This will be discussed at the kickoff meeting If so, please advise if current workload is on par with the 1 day per week at each site. Answer: Unknown / This will be discussed at the kickoff meeting Onsite Cadence and Staffing Limits (PWS 1.5.c) The PWS specifies two days per week onsite, "or as dictated by specific needs" and notes "if any specific project requires extra attention that campus will be visited consecutively as necessary." Under a Firm-Fixed Price structure, an undefined requirement for consecutive visits creates unquantifiable labor risk. Will the VA establish a cap on the maximum number of hours/days per month included under the fixed base rate, with any additional site visits or after-hours dispatch (Task 5) billed under a separate emergency/overtime labor CLIN? Answer: Unknown / This will be discussed at the kickoff meeting Can you share historical trouble call volume or frequency at each site to help contractors gauge the actual staffing requirement? Answer: Unknown / This will be discussed at the kickoff meeting Material Provisioning and Pricing Structure (PWS Section 2.1, Section 3.0 Task 2) Task 2 states the Contractor is responsible for "providing hardware and software." Section 2.1 states invoices will be billed as individual line items per the price schedule. Please explicitly confirm if "providing" refers only to the labor of installing and configuring materials, and that all hardware components and software licenses will be Government-Furnished Property (GFP). Answer: Unknown / This will be discussed at the kickoff meeting If the contractor must purchase the hardware/software, is this material cost intended to be absorbed into the firm-fixed-price labor rate, or will the price schedule include a separate materials/parts CLIN billed at cost or on a not-to-exceed basis? Answer: Unknown / This will be discussed at the kickoff meeting If material is contractor-furnished, would VA authorize vendors to purchase Delta material directly against Delta's GSA MAS schedule (47QSMS24D0003) under FAR 51.1/52.251-1, billed as the materials line item(s) in Section 2.1? This would keep material sourcing within the contractor's existing responsibility while crediting the spend to the SDVOSB award. Answer: Unknown / This will be discussed at the kickoff meeting Third-Party Integration Boundaries (Section III) The RFI requires the contractor to "Coordinate support for integrated systems or buildings not directly under Contractor control" and provide "limited third-party validation and troubleshooting." Will the VA define the scope boundary or place a labor hour cap on "limited third-party validation" before such troubleshooting must be handled as an out-of-scope equitable adjustment? Answer: Unknown / This will be discussed at the kickoff meeting Delta Certification Pathway (PWS Section 2) Section 2 requires the Contractor be certified to operate on Delta Controls with record of completion of the Fundamental Technical Certification Exam. Research indicates this training and certification is only accessible through Delta's authorized Partner network, with no open enrollment path for non-Partner firms. Under FAR 11.002(a)(1)(ii), specifications cannot be unduly restrictive to competition. Has VA identified how a non-Delta-Partner firm is expected to satisfy this requirement given the closed OEM training channel? Answer: Unknown / This will be discussed at the kickoff meeting Given the substantial onsite cadence required in Section 1.5.c, subcontracting for certified Delta labor raises Limitations on Subcontracting concerns under SDVOSB set-aside rules (13 CFR 125.6), as the certified work would be performed primarily by the subcontractor rather than the prime. How does the VA intend to reconcile this? Answer: Unknown / This will be discussed at the kickoff meeting Would VA consider a certification grace period between award and required completion, or accept alternative proofs of equivalent BAS competency? Answer: Unknown / This will be discussed at the kickoff meeting Security Clearances (Section 6) Section 6 states the contractor must reimburse the VA within 30 days for background investigations conducted by OPM. What is the exact fixed cost per individual background check that the VA will assess to the contractor so this can be accurately priced into our fixed-price proposal? Answer: Unknown / This will be discussed at the kickoff meeting Analytics and Reporting (PWS Task 8) Task 8 requires quarterly status reports covering current status, needs, and recommendations. Beyond this quarterly narrative format, is VA interested in implementing any fault detection, alarm analytics, or centralized reporting capability across both campuses? Answer: Unknown / This will be discussed at the kickoff meeting Travel Is there any established travel or per diem provision for contractor personnel, or is site coverage assumed to be locally based? Answer: Unknown / This will be discussed at the kickoff meeting
Who won similar work
11 award notices on SAM.gov in the last 24 months. Matched by: Same office (260-NETWORK CONTRACT OFFICE 20 (36C260)), same NAICS 561210.
Single-winner award sizes (11): middle half $233K to $588K, median $456K; range $74K to $5.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| AVALON CONTRACTING INC | 2 | $5.6M | Sep 22, 2025 |
| BOOMTOWN SERVICES LLC | 1 | $1.2M | Jul 11, 2025 |
| PHIGENICS LLC | 1 | $625K | Jan 8, 2026 |
| TK Elevator Corporation | 1 | $516K | Jul 17, 2026 |
| General Service Contracting, LLC | 1 | $456K | Feb 26, 2026 |
| HURTVET SUBCONTRACTING, LLC | 1 | $380K | Dec 6, 2024 |
| ARCIS FM LLC | 1 | $284K | Jul 1, 2026 |
| Medical Gas Installers, Inc. | 1 | $182K | Sep 10, 2026 |
| DHC CONTRACTING, INC | 1 | $108K | Apr 18, 2025 |
| AML-AMERICAN MADE LOGISTICS BLYTHE 92225 | 1 | $74K | Sep 11, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 10, 2026Medical Gas Installers, Inc.$182KAnnual Medical Gas System Inspection, Maintenance and Repair Service for the Puget Sound VA Health Care System, Tacoma/Seattle, WANo listed company matched (Materiality N/A)
- Jul 17, 2026TK Elevator Corporation$516KJ039--Elevator Maintenance, Inspection, and RepairNo listed company matched (Materiality N/A)
- Jul 1, 2026ARCIS FM LLC$284KVAMC AMERICAN LAKES BUILDING AUTOMATION (BAS) BASE + 4No listed company matched (Materiality N/A)
- Feb 26, 2026General Service Contracting, LLC$456KJ039--Elevator Maintenance, Inspection, and Repair Services for the Spokane VAMCNo listed company matched (Materiality N/A)
- Jan 8, 2026PHIGENICS LLC$625KLegionella Testing for Roseburg VAMCNo listed company matched (Materiality N/A)
- Sep 22, 2025AVALON CONTRACTING INC$550KEmergency Eyewash and Shower Station inspectionNo listed company matched (Materiality N/A)
- Sep 11, 2025AML-AMERICAN MADE LOGISTICS BLYTHE 92225$74KJ059--Annual Door PM and inspections servicesNo listed company matched (Materiality N/A)
- Sep 11, 2025AVALON CONTRACTING INC$5.0MSignage Installation and Renovation Services - IDIQNo listed company matched (Materiality N/A)
- Jul 11, 2025BOOMTOWN SERVICES LLC$1.2MAnnual Restriping Services 36C26025Q0046No listed company matched (Materiality N/A)
- Apr 18, 2025DHC CONTRACTING, INC$108KRoof Repairs - Bulding 200 and building 3No listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.