SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM � BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM � BEACHFILL)
Army Corps of Engineers · W074 ENDIST WILMINGTON
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912PM27BA005 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
The US Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC), is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Bethany Beach and South Bethany Beach, DE (CSRM - Beachfill), Fenwick Island, DE (CSRM � Beachfill), and Rehoboth Beach & Dewey Beach, DE (CSRM � Beachfill): areas. This procurement is for Coastal Storm Risk Management (CSRM). Bethany Beach and South Bethany Beach, DE (CSRM - Beachfill): The work for the Bethany Beach and South Beth… (show all)
any Beach, CRSM projects will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 532,000 cubic yards of sand would be required to restore Bethany Beach and South Bethany Beach to the original design template and approximately 165,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. Borrow Area E will be the source used for sand to restore this beach area and will require the use of a hopper or hydraulic cutterhead since Borrow Area E is located approximately two to three miles offshore of the Town of South Bethany. Fenwick Island, DE (CSRM � Beachfill): The work for the Fenwick Island, CRSM project will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 207,000 cubic yards of sand would be required to restore Fenwick Island to the original design template and approximately 60,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. The Fenwick Island borrow area will be the source used for sand to restore this beach area and will require the use of a hopper or hydraulic cutterhead since the Fenwick Borrow Area is located approximately one to three miles offshore of the Town of Fenwick Island. Rehoboth Beach & Dewey Beach, DE (CSRM � Beachfill): The work for the Rehoboth Beach to Dewey Beach, CRSM projects will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 390,000 cubic yards of sand would be required to restore Rehoboth Beach and Dewey Beach to the design template and approximately 120,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. Borrow Area B will be the source used for sand to restore this beach area and will require the use of a hopper dredge due to the four to six mile transit distance that must be made in the Atlantic Ocean to travel to and from the sand borrow area. The solicitation is expected to be available in FY2027. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and Clause 52.222-34 Project Labor Agreement. (i) Requested are responses to the following: 1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government�s interest in achieving economy and efficiency in Federal procurement. 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government�s interest in achieving economy and efficiency in Federal procurement. 6) Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project. 7) Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? 8) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact. (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 1) Project Name and Location 2) Detailed Project Description 3) Initial Cost Estimate vs. Actual Final Cost 4) Was the project completed on time? 5) Number of craft trades present on the project 6) Was a PLA used? 7) Were there any challenges experienced during the project? Responses shall be submitted via email to Melissa Vaughn at melissa.a.vaughn@usace.army.mil and Ros Shoemaker at rosalind.m.shoemaker@usace.army.mil no later than 3:00 PM EDT on 15 September 2026. The email should be titled: Delaware CSRM PLA Response This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this labor market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this survey.
Who won similar work
18 award notices on SAM.gov in the last 24 months. Matched by: Same office (W074 ENDIST WILMINGTON), same NAICS 237990.
Single-winner award sizes (18): middle half $5.5M to $21.9M, median $9.5M; range $1.3M to $41.2M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| NORFOLK DREDGING COMPANY | 3 | $65.9M | Jun 30, 2025 |
| CURTIN MARITIME CORP | 3 | $21.2M | Sep 18, 2026 |
| GREAT LAKES DREDGE & DOCK CO, LLC | 2 | $57.6M | Sep 16, 2026 |
| SOUTHWIND CONSTRUCTION CORP | 2 | $19.0M | Sep 16, 2025 |
| WEEKS MARINE, INC. | 1 | $41.2M | Aug 6, 2025 |
| COTTRELL CONTRACTING CORPORATION | 1 | $12.6M | Sep 30, 2025 |
| CAPE ROMAIN CONTRACTORS, INC | 1 | $7.0M | Jul 16, 2026 |
| THREE OAKS CONSTRUCTION, INC | 1 | $6.0M | Apr 1, 2026 |
| CECOS GROUP, LLC | 1 | $5.4M | Jul 29, 2025 |
| DOT CONSTRUCTION, INC | 1 | $2.7M | Dec 18, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 18, 2026EAST COAST CONTRACTING, INC.$2.5MEAGLE ISLAND CELL 2 IMPROVEMENTSNo listed company matched (Materiality N/A)
- Sep 18, 2026CURTIN MARITIME CORP$11.5MW912PM26BA007 - MAINTENANCE DREDGING, WILMINGTON HARBOR ANCHORAGE BASIN AND MID RIVER CHANNELSNo listed company matched (Materiality N/A)
- Sep 16, 2026GREAT LAKES DREDGE & DOCK CO, LLC$29.9MFY27 Maintenance Dredging, South Atlantic Division Regional Harbor Dredge ContractNo listed company matched (Materiality N/A)
- Sep 11, 2026CURTIN MARITIME CORP$3.4MFY26 Maintenance Dredging, Military Ocean Terminal Sunny Point (MOTSU)No listed company matched (Materiality N/A)
- Jul 16, 2026CAPE ROMAIN CONTRACTORS, INC$7.0MAtlantic Intracoastal Waterway (AIWW) Snows Cut Shoreline Erosion Bank StabilizationNo listed company matched (Materiality N/A)
- Apr 1, 2026THREE OAKS CONSTRUCTION, INC$6.0MFY26 AIWW Dredge Material Placement Facility (DMPF) Improvements 2No listed company matched (Materiality N/A)
- Dec 18, 2025DOT CONSTRUCTION, INC$2.7MFY26 AIWW Dredge Material Placement Facility (DMPF) ImprovementsNo listed company matched (Materiality N/A)
- Sep 30, 2025COTTRELL CONTRACTING CORPORATION$12.6MW912PM25BA005, FY26 Maintenance Dredging Rollinson/Silver Lake Hyde and Dare Counties, North CarolinaNo listed company matched (Materiality N/A)
- Sep 16, 2025SOUTHWIND CONSTRUCTION CORP$11.5MATLANTIC INTRACOASTAL WATERWAY MAINTENANCE DREDGING, FY26 CONTRACT, NORTH CAROLINANo listed company matched (Materiality N/A)
- Sep 11, 2025Lorr Construction, Inc.$1.3MMOTSU 25-005 FY25 Repair Trestle Bridge ComponentsNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.