SolicitationPosted Feb 27, 2025·Responses due Apr 10, 2025

Z2DA--512A5-22-704 - EHRM INSTALLATION OF NEXTGEN WIFI - SITE PREP PHASE (VA-25-00033391)

Veterans Affairs · 245-NETWORK CONTRACT OFFICE 5 (36C245)

Stage
Open solicitation
NAICS
236220
Value
Not stated
Solicitation
36C24525R0033
Set-aside
None stated
PSC
Z2DA
Place
Not stated
Contact
Dirk A Webb (Dirk.Webb@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24525R0033 in this department, oldest first.

Early notice
  • Feb 12, 2025
    Pre-solicitation
    Open
Solicitation
  • Feb 27, 2025 · this notice
    Solicitation
  • Apr 2, 2025
    Solicitation
    Open
  • Apr 8, 2025
    Solicitation
    Open
Award
  • Jun 5, 2025
    Award Notice
    AmeriTech Contracting LLC · $251K
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Solicitation Description CONSTRUCTION SCOPE OF WORK EHRM NEXTGEN WIFI UPGRADES STATION NRM PROJECT NO: 512A5-22-704 PROJECT NAME: EHRM NextGen WiFi Upgrades Perry Point, MD 1. GENERAL INTENT AND REQUIREMENTS: The Contractor shall furnish all labor, tools, materials, and equipment to support installation of new WiFi Access Points at Perry Point VA Medical Center campus located at 361 Boiler House Road, Perry Point, MD. Please note that the scope of this work is limited and specifically as listed below. All cable installers must be trained and certified meeting certification standards, i.e., EIA… (show all)

, TIA, ANSI, BICSI, TDM, ITU-t, NFPA, NEC and NCS. No persons shall conduct any installations that have not met these certification standards of training and installation. Vendor shall submit qualifications for VA COR approval. In addition, anyone performing what VA considers renovations or construction installation work shall have an OSHA approved 10 hour training course. Contractor to provide all supervision, labor, material and equipment necessary for the work described in the Scope of Work. All work shall be performed to applicable standards and the VA TIL. Where any codes or standards conflict, the contractor is to defer to the more stringent standard. The contractor shall cleanup, remove, and dispose of all construction debris DAILY. 2. STATEMENT OF WORK: Contractor shall provide and install all necessary conduit, raceways, horizontal and vertical penetrations, horizontal and vertical structured cabling, cabling accessories, and fire stopping to support the EHRM NextGen WiFi Installation Project on the Perry Point VA campus as shown and described in the project drawings and specifications. A list of conduits and/or penetrations projected to be required are provided in SOW Attachment 1. Work shall include: 1. Installation of 74 Wireless Access Points (WAPs) as indicated in Attachments 1 and 2. Access Points shall be provided by the VA, but the mounting brackets shall be provided by the Contractor. New AP Model to be installed: Juniper Networks AP43-FIPS-US 2. Installation of approximately 3,500 linear feet of metallic conduit (EMT) or raceway, including junction boxes, pull cords, and fire stopping, throughout the Medical Center. Existing conduit paths between floors and rooms will typically not have the capacity for more cable, and new conduit paths will need to be created. All new penetrations shall be sleeved with metallic conduit and fire stopped to meet UL rating. 3. Installation of approximately 6,700 linear feet of CAT 6A cable between each AP and nearest IT room, including terminating in a patch panel and providing a terminated biscuit connection at each AP location. All cabling terminations to be in accordance with the T568A pinout. Cabling sheath shall be Bright Green in color. All cables must be one continuous run between port location and communications distribution closet NO SPLICES OR SPLITTERS. 4. Installation of 12 new CAT6A patch panels in existing cable racks. Provide 6ft length patch cords for each horizontal cable installed. Final patching to switch to be completed by VA OIT staff. 5. All UTP cabling shall be fully tested in accordance with TIA 568C.2 following installation to determine Wire Map, Length, Propagation Delay, Delay Skew, Resistance, Insertion Loss Margin (Attenuation), Return Loss (RL), Near End Crosstalk (NEXT), Far End Crosstalk (FEXT), Attenuation-to-crosstalk Ratio (ACR-N), and ACR-F (ELFEXT). Submit reports to COR for system acceptance. 6. Contractor shall be required to comply with the project Infection Control Risk Assessment (ICRA) permit controls and requirements. For the purposes of bidding, contractor shall assume ICRA Category III applies and that negative air machines will be required. It is strongly recommended that the contractor attend the scheduled pre-bid site walk to familiarize themselves with the worksite conditions prior to bidding. All work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM, except work in Building 17H (Kitchen), which shall be completed after hours. 3. PERIOD OF PERFORMANCE: 3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes. Contractor shall submit a cost-loaded Gannt-chart type project schedule and invoicing schedule of values for COR acceptance within 15 days of contract award. � 3.2 All work described in Section 2 (including cable testing) shall be completed within 180 calendar days of contract Notice to Proceed. Contractor shall account for all Federal holidays in their schedule as non-work days. 4. REFERENCES: 4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0� (Attachment 3). 4.2 Infrastructure Standards for Telecommunications Spaces Version 4.0� (dated� August� 21, 2020)� 4.3 All work will be compliant with: Contratcor shall utilize a BICSI Certified RCDD Designer and Installer ANSI/TIA-568.0 Generic Telecommunications Cabling for Customer Premises ANSI/TIA-568.1 Commercial Building Telecommunications Infrastructure Standard ANSI/TIA-568.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standard ANSI/TIA-568.4 Broadband Coaxial Cabling and Components Standard ANSI/TIA-606 - Standard for Records, Labeling, Space, and Pathway Administration. 5. SPECIFICATIONS: The following specifications are attached and are considered included in the project scope of work: DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 01 31 00 Project Management and Coordination 01 32 16.15 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 74 19 Construction Waste Management 01 78 39 Project Record Documents DIVISION 02 EXISTING CONDITIONS 02 41 00 Demolition DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 84 00 Firestopping DIVISION 27 COMMUNICATIONS 27 05 11 Requirements for Communications Installations 27 05 33 Raceways and Boxes for Communications Systems 27 15 00 Communications Structured Cabling CABLE LABELING All cables will be numbered sequentially using thermally printed labels NOT HANDWRITTEN. Cable number labels will be placed at both ends of each cable, on patch panels, and wall mounted face plates. If cable numbers already exist in communications rooms, number labeling sequence will be a continuation of existing cable numbers already in place on data patch panels and voice cables. All wall jack locations, wiring paths, and labeling shall be noted be on final As-Built drawing to be provided by the contractor. CABLE MANAGEMENT All cables will be home run from each work-station area to the designated communications room. All cables will be suspended in ceiling using J-type hooks or placed in cable trays. Supporting cabling from mechanical equipment, lighting, hanger rods, piping/conduit, ceiling grid, etc. is NOT PERMITTED. All required conduit and cable trays shall be provided and installed by contractor. All penetrations thru smoke and fire rated walls shall be sleeved with metallic conduits and completely sealed with approved materials (fire caulked). If existing conduits are used and fire stopping material is removed from conduits, conduits shall be resealed with rated materials once cables are installed. All wall penetrations must be sleeved IAW, VA Office of Construction & Facilities Management Electrical Design Manual (EDM)* table 7.1 and Office of Information Technology (OIT) design guide. All cables will be installed in metal conduit in all mechanical spaces to include interstitial space. Cables in communication rooms will be neatly run into rack compatible cable management systems raceways. *Link for EDM: http://www.cfm.va.gov/til/dManual/dmELhosp.pdf *Link for OIT design guide: http://www.cfm.va.gov/til/dguide/dgOIT.pdf 8. SELECTION OF MATERIAL 8.1. All materials selected for use by installation contractor must be approved by VA COR, AHJ, and appropriate other VA personnel prior to installation. TEST

Who won similar work

4 award notices on SAM.gov in the last 24 months. Matched by: Same office (245-NETWORK CONTRACT OFFICE 5 (36C245)), same product/service code (PSC) Z2DA and NAICS 236220.

Single-winner award sizes (4): middle half $294K to $561K, median $387K; range $103K to $993K.

WinnerAwardsValueLast
VENERGY GROUP LLC1$993KMay 7, 2025
KAR CONTRACTING LLC1$417KMay 14, 2025
Arrow Consulting and Services, LLC1$357KJan 22, 2025
JRG Precision Construction, LLC1$103KMar 28, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.