115 FW Construct Alert GOV Parking Shelter
Army · W7N8 USPFO ACTIVITY WIANG 115
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W50S9F26BA011 in this department, oldest first.
- Aug 12, 2026Combined Synopsis/SolicitationOpen
- Aug 20, 2026 · this noticeCombined Synopsis/Solicitation
- Aug 22, 2026Combined Synopsis/SolicitationOpen
- Aug 25, 2026Combined Synopsis/SolicitationOpen
- Sep 2, 2026Combined Synopsis/SolicitationOpen
- Sep 3, 2026Combined Synopsis/SolicitationOpen
- Sep 9, 2026Combined Synopsis/SolicitationOpen
- Sep 10, 2026Combined Synopsis/SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Solicitation Number: W50S9FG-26-B-A011 Notice Type: Combined Synopsis/Solicitation Title: Construct Alert Government Owned Vehicles (GOV) Parking Response Date: As listed in SAM.Gov posting (i) GENERAL INFORMATION: This is a combined synopsis/solicitation for commercial construction services prepared in accordance with the format in RFO Part 12, RFO Part 14 and RFO Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. (ii) SET-ASIDE & C… (show all)
ODES: This requirement is a 100% Total Small Business Set-Aside. NAICS Code: 236220 � Commercial and Institutional Building Construction Small Business Size Standard: $45.0 Million Product Service Code (PSC): Y1BZ � Construction of Other Airfield Structures) Budget Parameters: RFO Part 36 no longer authorizes the disclosure of the magnitude of construction projects. The budget parameters for this requirement (Base plus all Options) are $1,250,000 to $1,750,000. (iii) DESCRIPTION OF REQUIREMENTS: The 115th Fighter Wing, Truax Field, Madison, WI, has a requirement for the construction of two shelters Alert Government Owned Vehicle (GOV) parking shelters. The project consists of the following Contract Line Item Numbers (CLINs): Base Quote Item (CLIN 0001): This requirement is for the construction of two shelters for Aerospace Control Alert (ACA) mission (1 for ACA Maintenance, 1 for ACA Aircrew), consisting of foundations, lighting, power, and wiring to ACA alarm so as shelter doors open when alarm sounds. SUSTAINMENT: Replace failed asphaltic concrete pavement within the ACA fenced area so as to remove FOD hazard. Demolish 3 temporary structures (2 tents and �grain bin�) on-site to be replaced by these facilities. Relocate storm drain inlet to remove the FOD hazard within alert response vehicle travel path. Concurrent Execution: If applicable, all optional work shall be performed concurrently with the base requirement. The total maximum period of performance for the entire project, inclusive of the Base and any exercised Options, shall not exceed 181 Calendar Days. (iv) Pre-Bid Conference: A pre-bid conference will be conducted on 20 Aug 26 at 10:00 a.m. (central time zone) for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held in Building 1210 at the 115th Fighter Wing, located at Truax Field, Madison, WI. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference. Due to security conditions, all contractors must register to attend by emailing the Contracting Officer no later than 17 Aug 2026. Email the attached SFS Form 12 with information for all attendees to Lt Col Dave Mattila at the following address: dave.mattila.2@us.af.mil This information must be provided in advance, 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the government�s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site. Visitors who are properly registered will be added to the base Entry Authorization List (EAL) and will be able to access the installation with a valid drivers license. Be prepared to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License (MUST BE A REAL ID), (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers. (v) FORMAL COMMUNICATIONS/QUESTIONS: Submit all questions in the format shown below by email to the contracting officer at dave.mattila.2@us.af.mil. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office: PRE-BID INQUIRY FORMAT Date of Bid Inquiry: _______________ From: ___________________________ Company Name: ________________ Address: ________________________ Phone Number: _________________ Email address: __________________ Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.) Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid. All questions and requests for information (RFI) must be received NOT LATER THAN 1 p.m. CDT, 03 Sept 2026. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system. Amendments, if/when issued will be posted to https://www.SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. (vi) AVAILABILITY OF FUNDS: Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. Contract award will NOT be executed until appropriated funds are made available. ATTACHMENTS: B.08 Combo Solicitation - W50S9F26BA011 B.08 Solicitation - W50S9F26 BA011 1442 XGFG182006 Construct Alert GOV Shelters � DRAWINGS XGFG182006 Construct Alert GOV Shelters � SPECIFICATIONS (1 of 2) XGFG182006 Construct Alert GOV Shelters � SPECIFICATIONS (2 of 2) XGFG182006 Construct Alert GOV Shelters � Geotechnical Report XGFG182006 Construct Alert GOV Shelters � Environmental Report (ACM & LBP) General Decision WI20260005 05182026 SFS Form 12 20260820 Informational Update (This is not an Amendment) Pre-proposal (Site Visit) slides and attendance sheet have been uploaded to SAM.gov attachments.
Who won similar work
549 award notices on SAM.gov in the last 24 months. Match: Same agency (Army), same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BL HARBERT INTERNATIONAL LLC | 7 | $1.1B | Aug 3, 2026 |
| K2 CONTRACTING GROUP, LLC | 6 | $2.6M + 2 shared | May 29, 2026 |
| Gideon Contracting, Limited | 5 | $514.9M + 1 shared | Sep 30, 2025 |
| ACC CONSTRUCTION CO., INC. | 5 | $493.2M | Aug 27, 2026 |
| FEDERAL CONTRACTING INC | 5 | $348.3M | Aug 18, 2026 |
| CONTI FEDERAL SERVICES, LLC | 5 | $257.3M | Oct 2, 2026 |
| EVERGREEN CONTRACTORS LLC | 5 | $8.5M | Sep 18, 2026 |
| YEAJIN E&C CO.,Ltd. | 5 | $4.4M | Jul 23, 2026 |
| All American AA LLC | 5 | $768K | Aug 24, 2026 |
| TREND CONSTRUCTION INC | 4 | $172.5M | Jul 15, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 16, 2026SUSTECH LLC$17.5MInvitation for Bid: Army National Guard Military Construction, Engineering/Housing Maintenance Shop, Camp Santiago, Salinas, PR
- Oct 13, 2026PORR Government Services GmbH Kaiserslautern 67657 DEU$49.0MAward for DHA Minor Construction SATOC in Germany, Belgium, and Italy
- Oct 8, 2026GRUNLEY CONSTRUCTION CO., INC.$18.1MRepair East Runway, Mill and Overlay North Half, Joint Base Andrews, MD
- Oct 8, 2026JV SKE GROUP AM SAGEWERK 10 GOLDBACH 63773 DEU$50.0MDODEA MINOR CONSTRUCTION SATOC
- Oct 5, 2026WAYNE CONTRACTING COMPANY$93KRestroom Repair (MOF)
- Oct 2, 2026CONTI FEDERAL SERVICES, LLC$109.9MHangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona
- Oct 1, 2026BUILDZ, LLC$38.0MBLDG 212 Fort Stewart GA OTA
- Oct 1, 2026COAKLEY & WILLIAMS CONSTRUCTION, LLC. 4500 EAST WEST HWY STE 500 BETHESDA MD 20814 USA$57.8MROCKET MISSILE MAINTENANCE FACILITY (RMMF) LETTERKENNY ARMY DEPOT (LEAD) PRECISION STRIKE MISSILE SYSTEM (PRSM) AND COMMERCIAL VEHICLE ACCESS CONTROL POINT (ACP)
- Oct 1, 2026TST TACTICAL DEFENSE SOLUTIONS, INC.$3.4MRHS HVAC Replacement ERVD172002
- Oct 1, 2026T & T CONSTRUCTION ENTERPRISES, LLC$233KNolin River Lake Tailwater Restroom Construction
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.