Building 215 Clean Room HEPA Filter Replacement
Commerce (all) · DEPT OF COMMERCE NIST
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation RFI-195000-26-00181 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
REQUEST FOR INFORMATION (RFI) BUILDING 215 ADVANCED MEASUREMENT LABORATORY (AML) CLEANROOM REPAIR AND HEPA FILTER REPLACEMENT Solicitation/Reference No.: 1333ND26RNB190014 1. PURPOSE OF THIS REQUEST FOR INFORMATION The National Institute of Standards and Technology (NIST) is conducting market research pursuant to Federal Acquisition Regulation (FAR) Part 10 and FAR 15.201 to obtain industry feedback concerning the scope, schedule, phasing, cleanroom outage requirements, technical and performance risks, and estimated construction cost associated with the Building 215 Advanced Measurement Labora… (show all)
tory (AML) Cleanroom Repair and HEPA Filter Replacement project. NIST previously solicited this requirement under Solicitation No. 1333ND26RNB190014. NIST did not receive an acceptable offer under that solicitation. NIST is therefore reassessing the requirement and acquisition approach before determining whether and how to resolicit the project. NIST is particularly interested in identifying aspects of the requirement that may materially affect industry participation, constructability, schedule feasibility, pricing, risk, or the ability of contractors to submit competitive proposals. Industry is encouraged to provide candid feedback and to identify recommended changes that could improve constructability, competition, schedule feasibility, cost certainty, and overall project execution while continuing to meet NIST�s mission and cleanroom operational requirements. 2. RFI / MARKET RESEARCH NOTICE THIS RFI IS ISSUED SOLELY FOR INFORMATION AND ACQUISITION PLANNING PURPOSES. IT DOES NOT CONSTITUTE A REQUEST FOR PROPOSAL (RFP), INVITATION FOR BID (IFB), REQUEST FOR QUOTATION (RFQ), OR OTHER SOLICITATION. The Government does not intend to award a contract based on responses to this RFI. Responses will be treated as information only and shall not be construed as offers or proposals that can be accepted by the Government to form a binding contract. The Government will not reimburse respondents for costs incurred in preparing or submitting information in response to this RFI or for participating in any follow-up discussions. This RFI does not obligate the Government to issue a solicitation or award a contract, nor does it restrict the Government�s ultimate acquisition approach. Respondents are advised that information submitted in response to this RFI may be used by NIST in developing or revising the acquisition strategy, statement of work, specifications, schedule, phasing requirements, outage requirements, Government cost estimate, and future solicitation. Respondents should clearly identify and mark any proprietary, confidential, or commercially sensitive information contained in their responses. Respondents should avoid including proprietary information unless necessary to provide a meaningful response. 3. PROJECT BACKGROUND The project involves repair and modernization work within the Building 215 Advanced Measurement Laboratory cleanroom located at the NIST Gaithersburg Campus. The AML cleanroom encompasses approximately 1,800 square meters and includes approximately 750 square meters of Class 100 cleanroom space. The facility supports sensitive NIST research activities and contains specialized and, in some instances, irreplaceable scientific equipment. The project generally includes, but is not limited to: Replacement of approximately 1,200 terminal supply HEPA filters; Repair and/or modification of HEPA filter connections; Testing, balancing, certification, and recertification of affected HEPA filters and cleanroom spaces; Replacement of approximately 70 variable air volume (VAV) terminal units; Replacement of approximately 54 airflow monitoring devices; Installation of approximately 32 exhaust air control valves; Modification and repair of associated ductwork; Rebalancing of associated air-handling and exhaust systems; Verification and repair, as required, of existing capped ductwork; Controls-related work; Cleaning, testing, balancing, commissioning, and cleanroom certification associated with each affected area; and Protection of existing cleanroom spaces, research operations, and sensitive scientific equipment throughout construction. Detailed project drawings, specifications, and/or relevant portions of the previously issued solicitation may be attached to this RFI or otherwise made available through SAM.gov for purposes of industry review. 4. CURRENT PHASING AND OUTAGE CONCEPT NIST�s previous acquisition strategy was developed to minimize disruption to ongoing research operations by performing the work through phased cleanroom outages rather than shutting down the entire cleanroom for the duration of construction. The previous requirement contemplated 19 construction phases consisting of 18 Critical Cleanroom Outage Phases and one Non-Critical Phase. For each Critical Cleanroom Outage Phase, the contemplated outage period was approximately nine calendar days, generally structured as follows: Outage/construction activities begin at approximately 7:00 p.m. on Friday; Work proceeds continuously, including 24-hour-per-day/seven-day-per-week operations, as necessary; Construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification are completed during the outage period; and The affected cleanroom area is required to achieve Ready for Re-Occupancy by approximately 7:00 a.m. on the second following Monday. Ready for Re-Occupancy generally means that required construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification have been completed; the affected area is operationally capable of supporting its intended use without material restriction; and no deficiencies remain that materially impair safe occupancy or cleanroom operations. The previous requirement also contemplated maintaining unaffected cleanroom bays in operation to the maximum extent practicable and included the possibility of limited additional weekend outages affecting larger portions of the cleanroom. NIST recognizes that these operational constraints may significantly affect contractor staffing, sequencing, subcontractor availability, construction risk, pricing, and schedule feasibility. NIST is specifically seeking industry feedback concerning these requirements. 5. INFORMATION REQUESTED FROM INDUSTRY Respondents are requested to review the project information provided with this RFI and address the following topics. Respondents are not required to answer every question; however, detailed and candid responses are encouraged. A. Outage Feasibility and Constraint Identification Critical Path Bottlenecks: Identify the specific trade activities that present the highest risk to achieving a 9-day bay outage window. Realistic Outage Duration: Based on your experience in occupied nanofabrication facilities, what is a realistic, achievable calendar-day duration to complete a single cleanroom bay/module from shutdown to final recertification? Risk & Impact Analysis: Explain how the current 24-hour, 9-day limit impacts project risk, labor density, safety, quality assurance, and total cost (including risk contingencies for $8,000/day liquidated damages). Phasing & Mock-Up Alternatives: Would executing a "mock-up bay" or initial trial phase establish a viable baseline for subsequent production bays? B. Construction Cost Estimate Based on the information provided, what is industry�s rough-order-of-magnitude (ROM) estimated construction cost for the complete project? Respondents may provide either a specific estimated amount or a reasonable estimated range. To the extent practicable, please identify the approximate portion of the ROM estimate attributable to: Direct construction work; HVAC/HEPA/VAV work; Controls work; Testing and balancing; Commissioning and cleanroom certification; Premium time, shift work, or 24/7 outage staffing; General conditions; Phasing and temporary protection; Contingency/risk allowance; and Other signi
Who won similar work
15 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Commerce (all)), same industry group (NAICS 2362).
Single-winner award sizes (15): middle half $203K to $1.3M, median $637K; range $11K to $600.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| J G M PROPERTY GROUP, INC. | 2 | $2.5M | Sep 18, 2026 |
| JNB SERVICES LLC | 2 | $1.8M | Sep 22, 2025 |
| PURE ENVIRO-MANAGEMENT, LLC | 2 | $981K | Sep 22, 2025 |
| HITT CONTRACTING, INC. | 1 | $600.0M | Sep 22, 2026 |
| BALFOUR BEATTY CONSTRUCTION, LLC | 1 | $32.2M | May 27, 2026 |
| EDIFICE SERVICES JV, LLC | 1 | $7.4M | Sep 10, 2025 |
| FRONT RANGE CONSTRUCTION INC | 1 | $523K | Aug 21, 2026 |
| Total Solution LLC | 1 | $230K | Sep 8, 2026 |
| Sterling Constructors LLC | 1 | $177K | Sep 2, 2026 |
| BHI CONSTRUCTION, LLC | 1 | $132K | Feb 6, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 22, 2026HITT CONTRACTING, INC.$600.0MCUP - Two-Phase Design-Build Acquisition for Modernization and Expansion of Central Utility Plant
- Sep 18, 2026J G M PROPERTY GROUP, INC.$1.7MPMEL Freezer Farm Renovation Project
- Sep 8, 2026Total Solution LLC$230KZ--Stairway Replacement for Galveston Buildings
- Sep 8, 2026J G M PROPERTY GROUP, INC.$815KZ--NOS NCCOS COOP OXFORD LAB BSL 2 PROJECT (FEO PROJE
- Sep 2, 2026Sterling Constructors LLC$177KNIST Boulder Building 2 1330 Fume Hood Replacement
- Aug 21, 2026FRONT RANGE CONSTRUCTION INC$523KSteam Tunnel Ventilation Replacement
- May 28, 2026EARTHWORX EXCAVATION LLC$54KZ--Jones Beach Fisheries Field Site Pad and Roof
- May 27, 2026BALFOUR BEATTY CONSTRUCTION, LLC$32.2MY--Manchester Campus Addition Construction at the Man
- Feb 6, 2026BHI CONSTRUCTION, LLC$132KJ--NWS WFO Sioux Falls Collision Remediation Project
- Sep 22, 2025JNB SERVICES LLC$994KBuilding 1 Rehabilitation Project at GLERL LMFS
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Commerce, Dept of (DOC) since 2024 (0 filings)
- 0 of their lobbyists list a past Commerce, Dept of (DOC) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 372 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.