- May 7, 2026 · this noticeAward NoticeEATON CORPORATION · $15.0M
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Note the winner and the end of the period of performance for the recompete.
- Follow the agency to see the next notice for this work.
What the notice says
1.0 Background The Bonneville Lock and Dam is a federally operated hydroelectric facility located on the Columbia River, constructed in the 1930s. The facility plays a critical role in providing renewable energy, supporting regional navigation, and contributing to flood risk management throughout the Pacific Northwest. This requirement supports the replacement of ten (10) existing Main Unit oil circuit breakers at Powerhouse 1, which are over 80 years old. The existing switchgear is obsolete, no longer maintainable, and presents a significant risk of operational failure. Eaton Corporation serv… (show all)
es as the Designer of Record (DOR) for this requirement under prior Contract No. W9127N-15-C-0002. Under that effort, Eaton designed, fabricated, and tested a prototype switchgear assembly, including full-scale design testing. This procurement leverages the previously developed and Government-accepted design and associated test data. 2.0 Objective The objective of this contract is to procure, on a supply-only basis, new custom-manufactured switchgear assemblies to replace the existing obsolete equipment. 3.0 Scope of Work The scope of this contract is limited to the manufacture, testing, and delivery of ten (10) new custom 15kV Main Unit Breaker Switchgear Assemblies. These assemblies, including draw-out circuit breakers and disconnect switches, shall be designed and manufactured to fit within the existing spatial constraints at Bonneville Powerhouse 1 (Elevation 65). This is a supply-only contract. The scope does not include on-site labor, removal of existing equipment, or installation of the new assemblies. All installation and associated construction activities will be performed by Government personnel under separate efforts. 4.0 Tasks and Deliverables CLIN 0001 � Main Unit Switchgear Assemblies Provide ten (10) complete Main Unit Switchgear Assemblies identical to the prototype developed and tested under Contract No. W9127N-15-C-0002. CLIN 0002 � Drawings Develop and deliver shop drawings, including outline and assembly drawings, in accordance with CDRL Exhibits A through D. CLIN 0003 � Reports Develop and deliver factory inspection and test reports in accordance with CDRL Exhibit E.
Who won similar work
7 award notices on SAM.gov in the last 24 months. Match: Same agency (Army Corps of Engineers), same NAICS 335313.
| Winner | Awards | Value | Last |
|---|---|---|---|
| KOONTZ ELECTRIC COMPANY | 1 | $1.7M | Feb 27, 2025 |
| TDX GLOBAL SOLUTIONS, LLC | 1 | $954K | Sep 29, 2025 |
| STONEWAY ELECTRIC SUPPLY CO Pullman WA 99163 USA | 1 | $284K | Sep 26, 2025 |
| TOP FLIGHT FITNESS GYM LLC | 1 | $116K | Sep 30, 2025 |
| AMERICAN ELECTRICAL ENTERPRISES INC. | 1 | $67K | Nov 12, 2024 |
| B & P CONSORT, INC. | 1 | $38K | Feb 21, 2025 |
| APONTE POWER SERVICES LLC | 1 | $33K | Aug 19, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Aug 19, 2026APONTE POWER SERVICES LLC$33KDworshak Dam Square D Panelboards, Load Centers, & Breakers
- Sep 30, 2025TOP FLIGHT FITNESS GYM LLC$116KAward Notice Dale Hollow VCB Purchase
- Sep 29, 2025TDX GLOBAL SOLUTIONS, LLC$954KDworshak Dam Medium Voltage GIS Switchgear
- Sep 26, 2025STONEWAY ELECTRIC SUPPLY CO Pullman WA 99163 USA$284KDworshak Dam Square D Low Voltage Switchboard
- Feb 27, 2025KOONTZ ELECTRIC COMPANY$1.7MSt. Stephens Switchgear
- Feb 21, 2025B & P CONSORT, INC.$38KMNA SF6 XJ Breaker Overhaul Kit
- Nov 12, 2024AMERICAN ELECTRICAL ENTERPRISES INC.$67KBroken Bow DC Distribution Panelboards
Competitive landscape
For the 7 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.