Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
Veterans Affairs · 261-NETWORK CONTRACT OFFICE 21 (36C261)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C26127Q00260001 in this department, oldest first.
- Oct 14, 2026 · this noticeSolicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site… (show all)
by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel. Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local and VA regulations and requirements. Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring. Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these). Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring. Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall anticipate repairing up to 20% of the drywall surface area in each room as needed to ensure a uniform and high-quality finish. All drywall repairs must be completed to meet VA standards and industry best practices before any painting activities commence. The contractor is responsible for providing all necessary materials, labor, and equipment to complete both the repair and painting work. The VA will provide a paint plan as the installation date approaches. The contractor shall replace all existing plastic corner guards with new stainless steel corner guards to match exact material per specification Section 09 06 00, Schedules for Finishes or an equivalent. For installation purposes and material lengths, the contractor shall follow wall mockup located outside the Engineering Suite at Building 650. Contractor to coordinate visit with COR. Contractor shall take into consideration that additional corner guards up to 10 additional might be needed upon request of the VA. The contractor shall meet with the COR to discuss and outline phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor s approach to the construction project. The Sacramento VAMC is an active hospital and therefore will require consideration to those areas with patients and staff. The contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor. This project is to take no longer than 240 calendar days from notice to proceed (
Who won similar work
9 award notices on SAM.gov in the last 24 months. Matched by: Same office (261-NETWORK CONTRACT OFFICE 21 (36C261)), same product/service code (PSC) Z2DA and NAICS 236220.
Single-winner award sizes (9): middle half $374K to $3.6M, median $2.0M; range $181K to $17.3M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| STRATEGIC INDUSTRY INC | 3 | $25.7M | Aug 4, 2026 |
| CAPEX CONSTRUCTION LLC | 1 | $3.6M | Feb 27, 2025 |
| AmeriTech Contracting LLC | 1 | $2.3M | Jul 24, 2025 |
| SERGENTS MECHANICAL SYSTEMS INC | 1 | $2.0M | Apr 22, 2025 |
| Mission Builders LAS VEGAS 89103 | 1 | $679K | Aug 3, 2026 |
| G. L. BRUNO ASSOCIATES, INC. | 1 | $225K | Jul 23, 2026 |
| PLATINUM CONTRACTING SERVICES BOULDER CREEK 95006 | 1 | $181K | Apr 23, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Aug 4, 2026STRATEGIC INDUSTRY INC$8.0MZ2DA--Repair Exterior Finishes, Building 1 and OPC |570-21-108 | Fresno VANo listed company matched (Materiality N/A)
- Aug 3, 2026Mission Builders LAS VEGAS 89103$679KZ2DA--Renovate Education Building Training Hub VAMC Las Vegas, NV Project 593-26-103No listed company matched (Materiality N/A)
- Jul 23, 2026G. L. BRUNO ASSOCIATES, INC.$225KZ2DA--Replacement of Ceiling Kitchen Area, Building 1, Basement 570-26-228 Fresno VA Medical CenterNo listed company matched (Materiality N/A)
- Jun 24, 2026STRATEGIC INDUSTRY INC$17.3MZ2DA--Z2DA -- Solicitation No. 36C26126R0019, Project No. 662-23-105, Renovate Sterile Processing for VAMC - San Francisco Award NoticeNo listed company matched (Materiality N/A)
- Apr 23, 2026PLATINUM CONTRACTING SERVICES BOULDER CREEK 95006$181KZ2DA--Install Sinks Outpatient Surgery | Contract No. 36C26126C0039 | Project No. 593-26-305No listed company matched (Materiality N/A)
- Jul 24, 2025AmeriTech Contracting LLC$2.3MZ2DA-- Install Fall Protection 570 21 109 Fresno VA Medical CenterNo listed company matched (Materiality N/A)
- Apr 22, 2025SERGENTS MECHANICAL SYSTEMS INC$2.0MZ2DA--570-22-219 Consolidate Sterile Supply RoomsNo listed company matched (Materiality N/A)
- Feb 27, 2025CAPEX CONSTRUCTION LLC$3.6MZ2DA--Replace Flooring in OR, PACU, and Special Procedures | Project 593-19-310 | Las Vegas VA Medical Center, North Las Vegas, NVNo listed company matched (Materiality N/A)
- Feb 21, 2025STRATEGIC INDUSTRY INC$374KAmendment 0007 Replace Inpatient Robot - PAD 36C261-24-AP-5262 | 640-25-1-5281-0005 | project 640-24-113 |No listed company matched (Materiality N/A)
Competitive landscape
For the 7 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.