Loading the records…
Loading the records…
Army Corps of Engineers · W074 ENDIST JACKSNVLLE
Army Corps of Engineers is planning to buy "Tampa Harbor Improvements Industry Day". This is an early notice: it is not taking bids yet. The work is in Tampa, FL, USA. The original due date (Nov 18, 2026) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 10 or more companies, usually for about $8.9M per award. An award is expected between January 2027 and March 2027.
Put together from the facts on this page; the details and sources are below.
Your briefs and their views: My briefs.
Every notice posted under solicitation W912EP27Z1CUA in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
ill be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, and to also provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2028 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $37 million Magnitude of Construction: $100 - $500 million Project Title: Tampa Harbor Improvements Industry Day. Purpose: The purpose of this scheduled Industry Day is to provide the latest information regarding the future advertisement and award of Contract 1 for the Tampa Harbor Deepening Project. The scheduled event will include a detailed presentation by the Jacksonville District US Army Corps of Engineers, Tampa Harbor Project Delivery Team (PDT) followed by open Q&A and 1-1 meeting opportunities with contracts to ask more in-depth questions and get feedback as the design and permitting moves forward. Project Description: The project includes construction dredging to deepen and widen specified areas within the federal navigation channel of Tampa Harbor. The project is planned for six (6) contracts over an estimated 8�10-year period. The Scope of Work for this Industry Day will be focused on Contract 1. Contract 1 work includes deepening of Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel and Cut-D (HB) to a depth of 49 feet MLLW, deepening the Port Sutton Terminal Channel to a depth of 44 feet MLLW, and deepening the East Bay Channel Extensions 1 and 2 to a depth of 41 feet MLLW. The Contract 1 work also includes widening of Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All dredged material from the project will be disposed of in the East Bay Placement Area, DMMA 2-D and DMMA 3-D. Estimated quantities to be dredged are roughly 4.4 million cubic yards. Link to the Tampa Harbor Improvements USACE website: https://www.saj.usace.army.mil/Tampa-Harbor/-30-/ Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: 1. Company/Contractor name, address, point of contact, phone number and e-mail address. 2. Does the Contractor plan to submit a proposal for this contract? 3. Describe the proposed construction methods and sequencing and equipment needed to complete the project. At a minimum, address pre-dredging, side-casting of pre-dredging material, and placement into the East Bay Placement Area including constructing the containment perimeter and filling within the area. The contract will include geologic data of the dredge and placement areas as well as the geotechnical requirements for materials considered suitable for constructing the containment perimeter. The contractor will propose the dredging sequence to accomplish constructing the containment perimeter that meets required geotechnical specifications. Describe the factors considered in determining the dredging sequence, such as the material type, proposed equipment, proximity to the placement area, etc.? 4. Describe any constructability, stability, safety concerns with East Bay Placement Area. Describe additional equipment or methods required to place infill above water and/or above the proposed crest of the containment perimeter. Describe any concerns for drainage of the placement area. 5. Describe how filling the East Bay Placement Area will not result in material migrating out of the placement area and into the federal channel. At a minimum, address how existing soft material at the placement area will be contained when disturbed. 6. Will the proposed East Bay Placement Area construction methods require equipment to be located within the federal channel for extended periods of time acting as obstructions for vessel traffic, or obstruct Port Tampa Bay Berth 150? 7. For East Bay Placement Area, describe any temporal facilities, staging and laydown areas, and utilities that would be required or preferred in adjacent upland areas. 8. Dredging and placement of material will be conducted in a manner to minimize turbidity. Describe the turbidity control measures, such as turbidity curtains, that would be incorporated into the proposed construction methodology. If hydraulic placement of infill is proposed for the East Bay Placement Area, describe how affluent will be managed. 9. Based on prior dredging construction experience either in Tampa Bay or other locations in Florida, what are some of the challenges USACE could streamline to improve contract execution? 10. Describe any concerns with execution of the environmental species monitoring and reporting. Event Date: Wednesday, 18 November 2026 at 9:00 AM EST. Event Location: Port of Tampa � Cruise Terminal 6 1331 McKay Street Tampa, Florida 33602 *Parking available onsite For more information, please see the Industry Day Agenda copy under the Attachments. Contact Info: Manny Vianzon, Project Manager (904) 232-3292 Emmanuel.A.Vianzon@usace.army.mil If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 212 869 457 Passcode: tG6Ff3Gt Join by phone: 604-262-2433 Phone conference ID: 972 118 411# NOTES: NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE VIRTUAL INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
28 award notices on SAM.gov in the last 24 months. Matched by: Same office (W074 ENDIST JACKSNVLLE), same product/service code (PSC) Z1KF and NAICS 237990.
Single-winner award sizes (28): middle half $6.1M to $15.0M, median $8.9M; range $1.9M to $400.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| THE DUTRA GROUP San Rafael CA 94901 USA | 3 | $45.4M | Sep 25, 2026 |
| CASHMAN DREDGING & MARINE CONTRACTING CO LLC | 3 | $44.6M | Aug 28, 2025 |
| CURTIN MARITIME CORP | 3 | $15.4M | Sep 24, 2026 |
| AHTNA MARINE & CONSTRUCTION COMPANY | 3 | $10.8M | Sep 17, 2026 |
| WEEKS MARINE, INC. | 2 | $39.2M | Sep 24, 2025 |
| COTTRELL CONTRACTING CORPORATION | 2 | $18.8M | Jun 9, 2026 |
| SOUTHWIND CONSTRUCTION CORP | 2 | $10.3M | Sep 25, 2025 |
| ATLANTIC & GULF DREDGING & MARINE LLC | 2 | $8.7M | Jun 11, 2026 |
| MULTIPLE AWARDEES Jacksonville FL USA | 1 | $400.0M | Jul 17, 2025 |
| MANSON CONSTRUCTION CO 5209 E MARGINAL WAY S SEATTLE 98134 USA | 1 | $22.8M | Sep 10, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
None of these past winners filed lobbying reports naming Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024. No sign of an incumbent lobbying push at this agency.
No lobbyist on these filings lists a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job: no revolving-door tie found in these filings. (These are lobbyists the companies pay, not their own staff.)
None of these winners matched a listed company, so PAC and FARA checks did not run.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
No bills named on these filings under Army Corps of Engineers-related issues.
A bill's title is shown only when the filing's own text names it; filings often cite last Congress's bill numbers.
No executive order in the last 12 months names Army Corps of Engineers in its title or summary.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
None of the past winners matched a listed company.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.