P400--Building 149 and 150 Demolition 552-26-201
Veterans Affairs · 250-NETWORK CONTRACT OFFICE 10 (36C250)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25026B0027 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
STATEMENT OF WORK (SOW) Contract Title. 552-26-203 Demolition of Buildings 149 and 150 Background. This Statement of Work (SOW) outlines the requirements for demolishing two brick buildings, designated as Building 149 and Building 150. Both buildings have experienced a complete roof collapse causing substantial damage to the supporting walls. The extent of the damage renders the buildings irreparable, necessitating complete demolition of roof structure, and exterior supporting walls. Building 149 is located in a large courtyard surrounded by other structures and connecting corridors, which nec… (show all)
essitates additional access and demolition considerations. Scope. The contractor shall supply all necessary labor, materials, equipment, and services to execute the following tasks: Demolition. Demolition of Building walls and roof system in their entirety. Utility Removal and Termination. Removal and safe termination of steam and condensate return lines in each building at their source. Removal and safe termination of electrical systems in each building at their source. Removal and safe termination of water supply in each building at their source. The contractor shall provide a detailed Utility Shutdown Plan outlining the steps and precautions for safely shutting down, de-energizing, and terminating all utilities for these two buildings. Retention of Structural Elements. The concrete floor of each building is to be protected and preserved. Sidewalks adjacent to both buildings are to be protected and preserved. Tunnels with concrete lids are to be protected and preserved. Temporary Fencing. Installation and maintenance of temporary fencing around the entire perimeter of the demolition sites for both Building 149 and Building 150 for the duration of the project . Fencing must be a minimum of six (6) feet high and secured to prevent unauthorized access. Clearly marked construction site signs to be placed on the fencing to indicate restricted access and necessary safety precautions. Construction Waste Documentation. The contractor shall document all construction waste generated during the demolition process. Provide documentation to the COR detailing the types and quantities of construction waste, including disposal methods and locations. Daily Logs. The contractor shall maintain and submit daily logs of all activities on the site. Daily Logs should include details of work performed, personnel on-site, equipment used, any safety incidents or near misses, and any other relevant information. Daily logs should be submitted to the Contracting Officer's Representative by the end of each work week. Performance Monitoring. The Contracting Officer or their Representative will perform inspections to verify compliance with the SOW. Security Requirements. The C&A requirements do not apply, and a Security Accreditation Package is not required. Security Badges. All contractor personnel must be issued and visibly wear security badges at all times while on-site. Security badges must include the contractor's name and photo identification. Procedures for obtaining and returning security badges must be coordinated with the Contracting Officer's Representative. Safety and Compliance. Demolition activities must strictly comply with all applicable federal, state, and local regulations, ensuring adherence to the highest safety and environmental standards. This includes, but is not limited to: Occupational Safety and Health Administration (OSHA) Standards. OSHA 29 CFR 1926 Subpart T - Demolition, which outlines general safety and health provisions specific to demolition activities. OSHA 29 CFR 1910.147 - The control of hazardous energy (lockout/tagout) to prevent accidental startup of machinery and the release of hazardous energy. OSHA 29 CFR 1926 Subpart E - Personal Protective and Life Saving Equipment, ensuring all workers are equipped with the necessary safety gear. Environmental Protection Agency (EPA) Regulations. Compliance with the Clean Water Act (CWA) for managing water runoff and discharges. Adherence to the Clean Air Act (CAA) for controlling dust and emissions, particularly the National Emission Standards for Hazardous Air Pollutants (NESHAP) regarding asbestos. Master Specification. Specification 02 41 00 Demolition Specification 01 35 26 Safety Requirements for Major Projects State and Local Regulations. Obtain all necessary permits from state and local authorities, including demolition permits and waste disposal permits. Adherence to state-specific occupational safety regulations and environmental protection guidelines. National Fire Protection Association (NFPA) Standards. NFPA 70 (National Electrical Code) for ensuring all electrical disconnections are performed safely. NFPA 241 for safeguarding construction, alteration, and demolition operations. Hazardous Material Handling. Compliance with the Resource Conservation and Recovery Act (RCRA) for the management and disposal of hazardous waste. Adherence to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for any potential hazardous substance releases and required reporting. All activities must be conducted under the supervision of qualified and certified personnel, ensuring complete adherence to these standards and regulations. Detailed records of compliance shall be maintained and available for review upon request. The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of materials of unknown type and quantity buried under the roof debris. Utility Termination. The contractor shall verify, ensure, and coordinate the proper disconnection and termination of all utility lines, including steam, water, and electricity associated with these two buildings. This involves collaborating with relevant utility providers, conducting thorough inspections to confirm disconnections, and implementing safety protocols to prevent any accidental utility service disruptions or hazards during the demolition process. The contractor shall obtain all necessary permits and approvals required for the termination of utility services. This includes coordinating activities with Engineering and effected services, submitting detailed shop drawings and documentation, and ensuring compliance with all relevant regulations and codes for the safe disconnection of utilities such as water, electricity, and steam lines. The contractor is strictly prohibited from performing any electrical hot work under any circumstances. Prior to commencing any demolition or construction activities, all electrical systems must be completely de-energized. This process includes isolating and shutting down power sources, locking out and tagging out all electrical circuits in accordance with OSHA Standard 29 CFR 1910.147 for the control of hazardous energy, and thoroughly verifying that the area is safe to work in through proper testing and inspection procedures as outlined in NFPA 70E. Additionally, the contractor must maintain documentation confirming that these safety measures have been implemented and adhered to, including compliance with the National Electrical Code (NEC) and other relevant federal, state, and local regulations. The contractor is required to provide a comprehensive Utility Shutdown Plan that outlines the specific steps and precautions for safely shutting down, de-energizing, and terminating all utility services. This plan must adhere to all relevant regulations and standards, including but not limited to OSHA Standard 29 CFR 1910.147, which covers the control of hazardous energy (lockout/tagout) procedures, and NFPA 70E for electrical safety in the workplace. The plan should include: Identification and assessment of all utility lines, including electricity, water, steam, gas, and any other services. Detailed procedures for isolating and shutting down power sources in compliance with OSHA lockout/tagout requirements. Verification processes to ensure complete de-ener
Who won similar work
7 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Veterans Affairs), same NAICS 238910.
Single-winner award sizes (7): middle half $807K to $4.7M, median $3.0M; range $32K to $6.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| COPPER CREEK, LLC | 1 | $6.0M | Jun 16, 2026 |
| CAVU CONSULTING LLC | 1 | $5.7M | Sep 10, 2026 |
| RANDY KINDER EXCAVATING INC | 1 | $3.7M | Aug 20, 2025 |
| JUNOT GROUP, LLC | 1 | $3.0M | Oct 27, 2025 |
| BYRD ENTERPRISES UNLIMITED INC | 1 | $1.4M | Jun 11, 2026 |
| BOCO CONTRACTING & CONSTRUCTION LLC | 1 | $263K | Jun 16, 2026 |
| COACTINT LLC | 1 | $32K | Sep 8, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 10, 2026CAVU CONSULTING LLC$5.7MZ2DA--687-24-101 Demolish Regrade Connecting CorridorNo listed company matched (Materiality N/A)
- Sep 8, 2026COACTINT LLC$32KChemistry Lab ModernizationNo listed company matched (Materiality N/A)
- Jun 16, 2026COPPER CREEK, LLC$6.0MP400--436-24-105 Miles City VA Campus DemolitionNo listed company matched (Materiality N/A)
- Jun 16, 2026BOCO CONTRACTING & CONSTRUCTION LLC$263KY1PZ--800-NSP26-001 National Shrine Project at Alton National CemeteryNo listed company matched (Materiality N/A)
- Jun 11, 2026BYRD ENTERPRISES UNLIMITED INC$1.4MY1PZ--863-NSP26-003 National Shrine Project at Mound City National CemeteryNo listed company matched (Materiality N/A)
- Oct 27, 2025JUNOT GROUP, LLC$3.0MY1NZ--667-23-113 CON Fisher House Site Prep ConstructionNo listed company matched (Materiality N/A)
- Aug 20, 2025RANDY KINDER EXCAVATING INC$3.7MZ2JZ--Jefferson Barracks St Louis Completion ContractNo listed company matched (Materiality N/A)
Competitive landscape
For the 7 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.