Loading the records…
Loading the records…
Air Force and Space Force · FA8501 OPL CONTRACTING AFSC/PZIO
Air Force and Space Force is planning to buy "FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse". This is an early notice: it is not taking bids yet. The work is in Warner Robins, GA, USA. Responses are due Nov 16, 2026. In the last 2 years, similar work went to 10 or more companies, usually for about $764K per award. An award is expected between December 2026 and May 2027.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation FA8501-27-RAPID-990029_RPR_RPL_HVAC_SYSTEM_BLDG_300 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
terior building systems within Facility 300 at Robins Air Force Base, Georgia. The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements necessary to provide reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The supporting work is necessary to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300�s critical multi-tenant organizations. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. � 2808a. Purpose The purpose of this Area of Interest is to identify commercially viable, safe, resilient, and schedule-credible solutions to repair and modernize the heating, ventilation, and air-conditioning (HVAC) and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The Government seeks an integrated approach that restores reliable environmental control; addresses end-of-life HVAC equipment; and supports remediation or modernization of affected interior conditions, including lead-based paint, asbestos-containing flooring, accessibility barriers, and degraded workspace configurations. The selected approach must sustain uninterrupted operations for Facility 300�s multi-tenant mission partners�including supply-chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management�while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable safety, energy, and Unified Facilities Criteria (UFC) requirements. Solutions should provide a practical and phased path to execute the work with minimal disruption to occupied operations and with appropriate control of construction, environmental, safety, operational-continuity, and schedule risks. The Government is interested in approaches that leverage commercial practices, innovative delivery methods, and demonstrable capabilities; any use of Other Transaction Authority (OTA) remains subject to confirmation of statutory authority, appropriate use criteria, and contracting/legal review. Project Background and Existing Conditions Facility 300 (constructed in 1942) is a critical multi-tenant facility supporting several key Department of War (DoW) missions, including the 448 SCMG (Supply Chain Management Group), 78 ABW IT (Zone 4/5 network support), LCMC/WIUW (Special Operations/Rotary management), and LCMC/WLS (C-5 cargo aircraft management). Sustainable, modern facility systems are essential to maintain uninterrupted operations for these critical national security and logistics missions. The building systems are severely degraded. The HVAC units have exceeded their lifecycle, resulting in frequent failures, high maintenance costs, and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring under the carpet contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards (slips/falls), optimize interior space configuration, improve occupant morale, and ensure compliance with energy, safety, and UFC codes. The building 300 will remain in partial operation during the entire duration of the project. Project Areas OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. � 2808a. Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under an OTA structure to bypass administrative procurement lag. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 11 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed. Jimmy Ezzell � jimmy.ezzell.1@us.af.mil Amelia Kelly - amelia.kelly@us.af.mil The Solution Brief shall include: A. Cover Page � Company name � UEI � Mailing address � Primary point of contact � Email address and telephone number � Identification of this RAPID AOI B. Executive Summary � Summary of the respondent�s qualifications and anticipated delivery capability; � Identification of any material capability, staffing, access, bonding, or teaming assumptions. C. Past Relevant Construction Experience � Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on large commercial buildings and or Government facilities involving Repair/Replace of HVAC systems � Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards. D. Team Composition and Organization � Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager). E. Construction Execution and Phasing Approach � Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily. F. Financial Capacity and Bonding � A statement of financial capacity to perform the anticipated work � Current single-project and aggregate bonding capacity, if bonds are anticipated; � Name of surety � Any other information necessary to demonstrate capacity to perform the anticipated project. Evaluation & Selection Criteria The Gover
107 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Air Force and Space Force), same product/service code (PSC) Z2JZ.
Single-winner award sizes (77): middle half $273K to $6.3M, median $764K; range $9K to $995.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BDM INDUSTRIAL SERVICES LLC | 3 | $3.8M | Sep 11, 2026 |
| K2 CONTRACTING GROUP LLC | 2 | $20.5M | May 1, 2025 |
| WEST BROTHERS CONSTRUCTION INC | 2 | $10.0M | Jul 13, 2026 |
| EASTERN CONSTRUCTION & ELECTRIC INC | 2 | $6.5M + 1 shared | Apr 15, 2025 |
| TRUMBLE CONSTRUCTION LLC | 2 | $4.2M | Jul 1, 2026 |
| AOD & RBT JV Texarkana TX 75501 USA | 2 | $2.2M | Aug 24, 2026 |
| WALDROP CONSTRUCTION INC | 2 | $1.4M | Oct 2, 2025 |
| JAXON CONSTRUCTION INC | 2 | $729K | Apr 21, 2026 |
| CASCADE ENTERPRISES, INC | 2 | $527K | Sep 21, 2026 |
| HENRY GENERAL CONTRACTORS INC | 2 | $395K | Sep 3, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.