Army Corps of Engineers · US ARMY ENGINEER DISTRICT WALLA WAL
Army Corps of Engineers is planning to buy "LLA Navigation Lock Switchgear". This is an early notice: it is not taking bids yet. The work is in Pomeroy, WA, USA. Responses are due Nov 13, 2026. In the last 2 years, similar work went to 10 or more companies, usually for about $4.9M per award. An award is expected between December 2026 and January 2027.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation W912EF27RA002 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
million. Solicitation number W912EF27RA002 will be posted to the SAM.gov Contract Opportunities website on or about mid November 2026. The proposal due date will be contained in the solicitation and any solicitation amendments that may be issued. The solicitation will be made available for download on the SAM.gov Contract Opportunities website. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation. System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award. NOTE: The response date that is required to post this notice is not in any way a due date for any submission. This is a pre-solicitation notice only. Scope: The scope of the work involves replacing existing medium and low voltage switchgear lineups and their associated feeder cables with modernized medium and low voltage switchgear and motor control center lineups at Lower Granite Dam Navigation Lock. The main features of work includes: Provide and install one (1) new medium voltage switch gear. Provide and install one (1) new low voltage switch gear. Provide and install two (2) new motor control center lineups. Provide modernized controls for existing electrical loads. Provide one (1) new 4,160/480-V 1,000 kVA transformer. Provide lighting load centers to replace existing panels. Provide new concrete housekeeping pads for new electrical equipment. Provide new cable trays and conduits where required by circuit reconfigurations and to bring fill ratios to levels that meet electrical codes. Provide an HMI screen to replace an existing annunciator panel. Demolish existing medium and low voltage switchgear, motor controls centers, and transformers. Demolish the existing 480VAC feeders routed from existing low voltage switchgear and motor control centers. Seal hatch and any expansion joints, or cracks, to prevent water intrusion in an existing electrical room. This work is anticipated to be performed in 2028 and 2029, with cutover power construction work being completed during the 2028 and 2029 navigation lock outages. Access to the navigation lock deck and electrical substation rooms will be available for workers and equipment. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THE SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRE-SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). Establish and manage an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. A Site Safety and Health Officer (SSHO) employed by the prime contractor is required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years� experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5 years, and shall have completed at least 24 hours of safety training from accredited safety training sources each year for the past 5 years. Establish and manage an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor is required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5 years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled �Construction Quality Management for Contractors� within the last 5 years. Use the Government-furnished Resident Management System (RMS) � Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the quality control system (QCS) software available to the Contractor at time of notice to proceed. The project involves the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of As-Built Drawings, O&M Manuals, Contractor- Prepared Shop Drawings, and spare parts to the customer. Solicitation Number W912EF27RA002 will be posted to the SAM.gov approximately on around mid to late November 2026. The solicitation is a Request for Proposal Important Note: The SAM.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for SAM.gov archive purposes only. It does not necessarily reflect the actual proposal due date. There is no response date included in this notice. The proposal due date and time will be contained in the solicitation and any solicitation amendments that are issued. Anticipated Award date is early to mid-March 2027. A site visit will be offered approximately 2 weeks after the solicitation is made available to offerors. See solicitation for details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately. To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with 1-551 stamp or attached INS Form 1-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form 1-151 or 1-551), Temporary Resident Card (INS Form 1-688}, Employment Authorization Card (INS Form l-688A}, Reentry Permit (INS Form 1-327}, Refugee Travel Document (INS Form 1-571}, Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B}. Send this information by email to leanne.r.walling@usace.army.mil and jani.c.long@usace.army.mil Foreign nationals must have received clearance prior to being granted access to the project site.
15 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Corps of Engineers), same product/service code (PSC) Y1KA.
Single-winner award sizes (15): middle half $1.3M to $16.2M, median $4.9M; range $290K to $655.1M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| ELEVATED TECHNOLOGIES, INC | 2 | $9.9M | Jun 13, 2025 |
| Thalle - Bauer LLC | 1 | $655.1M | Dec 18, 2025 |
| J. F. BRENNAN COMPANY | 1 | $117.7M | Apr 11, 2026 |
| C. J. MAHAN CONSTRUCTION COMPANY | 1 | $26.3M | Jul 21, 2025 |
| HSG Park Joint Venture 2, LLC | 1 | $22.3M | Jan 2, 2025 |
| BCSS, LLC | 1 | $10.1M | Jan 30, 2025 |
| FIDELIS-BBD, LLC | 1 | $9.6M | May 12, 2025 |
| AMERICAN MINE SERVICES INC | 1 | $5.3M | Nov 26, 2025 |
| ROYAL BRIDGE, INC. | 1 | $4.9M | Nov 5, 2024 |
| GFM PARTNERS LLC | 1 | $1.5M | Mar 20, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.