Pre-solicitationPosted Dec 30, 2025·Original deadline passed (Jan 31). See latest amendment for current deadline.

C1DA--596-26-106 Renovate & Repair B-28 Ground for SPS

Veterans Affairs · 249-NETWORK CONTRACT OFFICE 9 (36C249)

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
541330
Value
Not stated
Solicitation
36C24926R0034
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
PSC
C1DA
Place
Lexington, KY, USA
Contact
Robert Glenn Jr (robert.glenn2@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24926R0034 in this department, oldest first.

Early notice
  • Dec 30, 2025 · this notice
    Pre-solicitation
Solicitation
None posted
Award
  • Apr 27, 2026
    Award Notice
    RDC JPA ARCHITECTURE, L.L.L.P. · $650K
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

DESCRIPTION: This is a Pre-Solicitation Notice for project number 596-26-106 that requires Architect/Engineering (A/E) Design Services to Renovate and Repair Building 28 Ground for SPS at the Lexington VA Health Care System Franklin R. Sousley Campus, located in Lexington, KY. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSALS. ONLY THE A/E FIRMS RESPONDING TO THIS ANNOUNCEMENT BY SUBMITTING AN SF330 PACKAGE ON TIME WILL BE CONSIDERED FOR INITIAL EVALUATION. FOLLOWING INITIAL EVALUATION OF THE A/E FIRMS AND THEIR SF330S, A SOLICITATION FOR A PRICE PROPOSAL WILL BE SENT TO THE HIGHEST TECHNICALLY… (show all)

RATED A/E FIRM TO PROVIDE THE TYPE OF SERVICE(S) REQUIRED. The A/E Services contract that is anticipated to be awarded will be procured in accordance with the Brooks Act (Public Law 92- 582), Federal Acquisition Regulation Part 36.6 and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 Construction Contracts With Architect-Engineer Firms , no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. A/E DESIGN SERVICES SCOPE SYNOPSIS: Located at the Lexington VA Health Care System Franklin R. Sousley Campus, to renovate approximately 4,500 +/- SF, for SPS. Project will include moderate floor plan changes, finishes, and correction of FCA deficiencies. Building is considered Historic Asset on National registry. part of renovation will include repair/replace windows and Building envelope to improve safety, security and energy efficiency. This project will include exterior and interior way finding to promote patient centered care concepts and satisfaction. The project will correct deficiencies in bldg. entrances, loading dock, ground floor lighting, and windows. Demo Ground Floor fan coil system and replace with VAVs with hot water reheat. The new VAV system will be connected to the existing two ground floor AHUs in the penthouse. Advanced meters capable of integrating into BMS will be installed for Project No. 596-26-106 - Renovate and Repair Building 28 Ground for SPS. A-E is to provide in-depth investigation of all existing space and utility systems listed above. The A-E shall also evaluate and provide design services for renovating and repairing Building 28 Ground for SPS to meet future demands. Work will include but is not limited to the following major scope matters or deficiencies: The A-E shall provide design period services to include drawings and specifications reflecting specific tasks identified in this statement of work document and as identified during project discussion meetings. A-E shall provide competent design period services using staff and consultants adequately knowledgeable of the various subordinate design disciplines including but not limited to life safety and other building/utility systems as required for the project. The A-E shall develop plans and system schematics for actual in-place components from VA-provided drawings and from field verification on site. Verify existing conditions affecting design. Information provided by VA on record drawings shall be verified for critical dimensions and critical components that may affect the design. A-E shall consider adjacent systems and components (architectural as well as utility systems) to avoid unforeseen site conditions change orders to the construction contract. The A-E shall verify necessary building architectural and utility system components to provide for a full and complete design of replacement architectural elements and utility system components. During the project the A-E shall be required to attend project meetings. The A-E shall record meeting minutes and furnish meeting minutes and sketches as required to reach concurrence and approval by the design team members. Minutes shall be forwarded to all attendees within 36 hours of the meeting for review and comment. The A-E shall incorporate appropriate comments, finalize the meeting minutes and send out the final meeting minutes within one week of the meeting. VA is contracting design period services to include Schematic Design (SD) Development, Design Development (DD), Construction Documents (CD), and Bid Documents. All submissions and related work for each design phase shall conform to the requirements in this document and Program Guide (PG)-18-15, Volume C A-E Submission Instructions as modified in this document. See the Access to VA Standards section of Part 3 for webpage to obtain PG-18-15. Basics: Project design shall clearly show the work required, phasing of work required, and instructions to the construction contractor regarding how to accomplish the necessary renovations in a 24/7 medical environment taking into consideration demolition, infection control, and specialized facility requirements as discussed with VA staff. Also included will be limitations, e.g. work required to be completed outside of standard administrative hours, work limited to periods shorter than a single shift, etc., for specific locations in the project. END OF DESIGN SCOPE SYNOPSIS +Digital copies of the as-builts are limited. The consultant will be expected to fully investigate and confirm the validity of hard copy as-builts and other drawings. This will include independent investigation of the VAMC s flat files by the consultant to determine and procure the information required for the complete design. All offerors are advised that in accordance with VAAR 836.606-73 the total cost of the architect or engineer services contracted for must not exceed 6 percent of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR Clause 52.236-2 (c) - Design Within Funding Limitation, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated AE firm selected to complete the design. Interested firms should submit their current SF-330 to Robert.Glenn2@va.gov. The SF-330s are due by January 31, 2026, at 2:00 PM (EST). Security Issues, Late Bids, Unreadable Offers Late submission of offers are outlined at FAR Parts 52.212-1(f), 52.214-7, and 52.215-1(c) (3).� Particular attention is warranted to the portion of the provision that relates to the timing of submission. Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers. To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free.� Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR Parts 14.406 and FAR 15.207(c). The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable. Password protecting your offer is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals. Important Notice: Apparent successful offerors must be registered in the U.S. Small Business Administration (SBA) site at the time of submission of proposal. Failure to be both VERIFIED by the SBA and VISIBLE at the time of proposal submission, time of interview, and at time of award will result in the offeror s proposal being deemed non-responsive. All offerors are urged to contact the SBA DSBS (https://dsbs.sba.gov/search/dsp_dsbs.cfm) and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. Response Time: The successful A-E shall abide by a four (4) hour response time for Lexington VA Health Care System, during the design ph

Who won similar work

4 award notices on SAM.gov in the last 24 months. Matched by: Same office (249-NETWORK CONTRACT OFFICE 9 (36C249)), same product/service code (PSC) C1DA and NAICS 541330.

Single-winner award sizes (4): middle half $704K to $1.5M, median $1.0M; range $694K to $2.0M.

WinnerAwardsValueLast
HEALTH FACILITY SOLUTIONS COMPANY1$2.0MFeb 5, 2026
FFE ENVIRONMENTAL SERVICES INC1$1.3MNov 13, 2025
TRIPLE C-THE A & E GROUP LLC1$707KJan 7, 2026
DAV ENERGY SOLUTIONS, INC.1$694KApr 9, 2026

Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.