FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK
Army Corps of Engineers · ENDIST TULSA
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912BV279A001 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this special notice to announce an upcoming competition for a design and construction solicitation for the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC �2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY Tulsa District intends to conduct a virtual Industry Day on Fri… (show all)
day, September 25, 2026 at 11:00AM Central Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed?Progressive Design-Build (PDB)?approach under an?Other Transaction (OT)?framework, ask questions, and provide input in advance of the solicitation release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the Program Solicitation. The Industry Day Team�s meeting link will be posted as an update to this notice NLT close of business on Wednesday, 23 September 2026. Please be advised this meeting will be recorded. II. PROJECT OVERVIEW Project Title: FY28 KC-46A Aircraft Beddown Infrastructure Program Location: Altus Air Force Base, OK NAICS Code: 236220 III. PROJECT DESCRIPTION The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force�s sole formal training unit for heavy mobility aircraft. This $304M consolidated capital program will modernize the installation�s infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for C-17 and legacy fleets. The program delivers three primary facility complexes along with associated airfield civil site infrastructure: Aircraft Maintenance Facilities KC-46A Aircraft Maintenance Hangar (General Maintenance): A fully enclosed, single-bay aircraft general maintenance facility (Cat Code 211-111) engineered to support maintenance tasks and provide inclement weather protection for multi-craft fleets (KC-46A, KC-135, C-17, and C-137). Structural components include reinforced concrete foundations, a structural steel frame and standing seam metal roof system, insulated metal wall panels, and high-strength concrete floor slabs. Interior functional space integrates personnel support areas, flight chief/production supervisor offices, expediter offices, break rooms, locker/shower rooms, tool rooms, laser rooms, hazardous material (HAZMAT) storage, a dedicated hazardous waste collection system, and Consolidated Tool Kits (CTK) suites. Airfield site work includes heavy-duty concrete pavement, taxiway tie-ins, aircraft wash racks, exterior lighting, and utility distribution. KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance): A highly complex, fully enclosed single-bay hangar (Cat Code 211-159) engineered specifically to execute high-risk corrosion control operations (sanding, washing, aircraft depainting/painting) and open-tank fuel cell maintenance. Structural features include steel framing, insulated metal walls, and explosion-resistant construction. Functional spaces encompass paint storage and mix rooms, clean rooms, blast booths, sanding/filter storage, dedicated fuel tank repair and tool storage shops, breathing air systems, specialized industrial ventilation/exhaust systems, hazardous waste collection, and administrative personnel spaces. Flight Crew Training & Simulator Facility KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion): An expansion to the existing Flight Training Center (FTC) (Cat Code 171-212) designed to support classified training operations for KC-46A aircrews. The expansion adds dedicated high-bay simulator bays and support space to house: High-bay Weapons System Trainers (WST) (full-motion flight simulators); Boom Operator Trainers (BOT) and Part Task Trainers (PTT); Integrated bridge and overhead servicing cranes for simulator maintenance and hydraulic/motion platform equipment removal; Specialized mechanical, electrical, plumbing (MEP), and fire detection and suppression systems, including redundant, high-efficiency Computer Room Air Conditioning (CRAC) / precision HVAC systems for computer rooms, simulator visual systems, and motion equipment; Dedicated classroom spaces, flight briefing/debriefing rooms, and administrative offices; Secure areas designed, engineered, and constructed to strict Intelligence Community Directive (ICD) 705 Sensitive Compartmented Information Facility (SCIF) physical, acoustic, and tempest security standards; Associated heavy-duty exterior pavements, access driveways, delivery bays, and personnel parking areas. Associated utility hookups and extensions. Enabling Civil Infrastructure & Demolition Aircraft Refueler Vehicle Parking Area Relocation: Site preparation for the General Maintenance Hangar requires the complete relocation and replacement of an existing 68,620 SF aircraft refueler parking yard. Scope includes high-strength concrete paving, dedicated secondary containment, security fencing, lighting, and an integrated environmental stormwater control and oil-water filtration system. Liquid Oxygen (LOX) Plant Relocation: Enabling work for the Multipurpose Hangar requires the decommissioning, demolition, and off-site reconstruction of the active base LOX facility. The replacement facility encompasses specialized oil-free/hydrocarbon-free concrete paving, cryogen storage pads, an overhead weather protection structure, security fencing, hazardous gas detection, and dedicated utility connections. Demolition: Demolition of three aging flight-line structures (approx. 155 SM total) and existing asphalt/concrete parking areas to clear the building footprints. All facilities will be designed and constructed as permanent construction in accordance with UFC 1-200-01 (DoD Building Code), UFC 4-010-01 (DoD Minimum Antiterrorism Standards for Buildings), and the installation's Architectural Compatibility Plan. IV. ACQUISITION STRATEGY - PRE-AWARD The USACE will use a?streamlined?competitive selection process:? Step?1 � Statement of Qualifications:?Interested parties will?submit?a?Statement of Qualifications?(max?# of pages to be defined in solicitation). The Government intends to?down-select?up to?three Design-Build Teams?to?proceed?to?Step 2.? Step?2 �?Pitch Presentations:?Selected?Design-Build Teams?will?participate?in pitch?meetings.?One company will be selected as the?Design-Build team?for?award?of the?initial?design?and preconstruction services?with a?modification for design completion and construction award.? V. ACQUSITION STRATEGY � AWARD The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds are available. VI. KEY SECURITY REQUIREMENTS The Department of Wa
Who won similar work
15 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Corps of Engineers), same product/service code (PSC) Y1BZ.
Single-winner award sizes (15): middle half $36.2M to $106.6M, median $62.4M; range $6.6M to $390.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Harper Construction Company | 3 | $465.2M | Sep 12, 2026 |
| BL HARBERT INTERNATIONAL LLC | 2 | $101.4M | Aug 3, 2026 |
| OBAYASHI CMS KADENA JV Fukuoka-shi 810-0001 JPN | 1 | $390.0M | Sep 25, 2026 |
| KORTE CONSTRUCTION COMPANY | 1 | $106.1M | Sep 13, 2025 |
| ACC CONSTRUCTION CO., INC. | 1 | $81.5M | Aug 27, 2026 |
| Conti Kight JV LLC | 1 | $75.0M | Sep 9, 2026 |
| EXEO-NAKAMOTO KOGYO JV Okinawa City 904-0021 JPN | 1 | $60.7M | Feb 18, 2025 |
| FEDERAL CONTRACTING INC | 1 | $60.2M | Sep 19, 2025 |
| CONTI FEDERAL SERVICES, LLC | 1 | $33.5M | Jul 2, 2025 |
| VET INDUSTRIAL INC | 1 | $18.1M | Sep 26, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 28, 2026TODA CORPORATION$6.6MDemolition of Maintenance Hangar, Building 3542, Kadena Air Base, Okinawa, Japan
- Sep 25, 2026OBAYASHI CMS KADENA JV Fukuoka-shi 810-0001 JPN$390.0MTHEATER AIRCRAFT CORROSION CONTROL PREP HANGAR, KADENA AIR BASE, OKINAWA, JAPAN
- Sep 22, 2026K & K INDUSTRIES INC$15.0MB-21 WEAPONS RELEASE SYSTEM STORAGE (WRSS) CONSTRUCTION
- Sep 12, 2026Harper Construction Company$223.6MFY26 BOMBER AGILE COMMON HANGAR - TINKER AIR FORCE BASE (TAFB), OK
- Sep 9, 2026Conti Kight JV LLC$75.0MConstruction of B-21 Radio Frequency (RF) Hangar
- Aug 27, 2026ACC CONSTRUCTION CO., INC.$81.5MPN 93099 Aircraft Maintenance Hangar
- Aug 3, 2026BL HARBERT INTERNATIONAL LLC$39.0MF35 SPECIAL ACCESS PROGRAM FACILITY (SAPF)
- Dec 12, 2025BL HARBERT INTERNATIONAL LLC$62.4MF35 Academic Training Center at Ebbing ANGB
- Sep 26, 2025VET INDUSTRIAL INC$18.1MRepair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
- Sep 19, 2025FEDERAL CONTRACTING INC$60.2MB-21 East Alert Apron
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.