Z1DZ--Replace Gaskets Building 1 in Chilled Water Pipe System at the Northampton VA Medical Center
Veterans Affairs · 241-NETWORK CONTRACT OFFICE 01 (36C241)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24126Q0243 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and… (show all)
clauses are those in effect through Federal Acquisition Circular 2026-04. This solicitation is set-aside 100% for SDVOSBs. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $19.0 million. The FSC/PSC is Z1DZ. CLIN Description Quantity POP 0001 B1 Chiller Pipe to AHU Gasket Replacement in accordance with PWS 1 JOB 60 days after receipt of order. The Central Western MAVA Medical center located at 421 North Main ST in Leeds, MA 01053 is seeking to purchase services to replace all gaskets in the supply/return chilled water mechanical pipe joining system in all of Building 1. Wage Determination 2015-6115 is applicable. STATEMENT OF WORK Performance Work Statement for B1- Chiller Pipe Victaulic Gasket Replacement Project Number: 631-26-005 Location(s): Building 1 1 Overview 1.1 General The Contractor provide professional services to include all labor, transportation, materials, apparatus, tools, equipment and permits necessary to in accordance with this design scope of work. All work must meet VHA, OSHA, EPA, and Mass DEP standards. 1.2 Project Specific Scope of Work - B1- Chiller Pipe Victaulic Gasket Replacement Work consists of replacing all gaskets in the Supply/Return Chilled Water mechanical pipe joining system in all of Building 1; approximately 490 gaskets, see drawings for sizes. Replace damaged insulation in kind approximately 2,000 linear feet. The Period of Performance for this project is 60 calendar days. Weather needs to be forecasted to be 56°F or below consistently throughout the work. 1.3 General Scope Items The following is a list of general scope considerations: 1. Meet with VA Facilities staff, review existing drawings and estimates, and perform field work necessary to determine required materials and equipment. 2. When conflict exist between documents the order of precedence shall be specifications then drawings. Any conflicts shall be identified to the COR and be resolved using the RFI process to allow for proper documentation and correction as necessary. 3. Permitting (external to VA): a. City of Northampton permits, and waivers are the responsibility of the contractor. The contractor must be prepared to attend City of Northampton committee meetings as required. b. All Massachusetts Department of Environmental Protection permits, and waivers are the responsibility of the contractor. This includes, but not limited to all environmental and hazardous material permits. 4. All field work shall be scheduled at least 72 hours in advance with VA Facilities Management. 5. The site shall be left clean of all construction debris and hazardous materials. 6. Coordinate with VA CWM HCS GEMS coordinator Rob Michalik at 413-584-4040 x 2330 for the signing of the waste manifests. 7. Design and installation to meet the most stringent of latest edition of the VA Specifications, Design Guides and Manuals, IBC, NEC, NFPA, and all applicable building codes. 8. Submit product data and shop drawings for all materials prior to installation. Submittals and shop drawings shall be approved by COR. 9. All work shall be performed in accordance with Massachusetts DLS regulations and OSHA codes. 1.4 Site Access and Management Requirements The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the project. The contractor must have the following additional requirements before working on site: 1. Contractor badge must be obtained and visibly worn by contractor or representative at all times while on campus 2. Negative TB Test, within the past calendar year 3. Clear Face Shield or Safety Glasses in patient care areas 4. Annual influenza shot is required to perform work on campus. These requirements are applicable to all contractor employees and subcontractors working in and around campus building unless stated otherwise by COR. The contractor is ultimately responsible for the behavior of employees and subcontractors. Questions or concerns may be addressed by the COR. 1.5 List of Attachments The following list of documents are attached to this SOW for Contractor use and incorporation into the project documents: 1. B1-Chiller Pipe Victaulic Gasket Replacement Contract Drawings 2. VHA Directive 2011-036- Safety and Heath During Construction 3. 852.219-75 VA Notice of Limitations on Subcontracting 4. Wage Determination No. 2015-6115 2 Proposed Schedule Period of performance for this contract is 60 days from NTP. All on-site work (including cleanup) shall take place during the following times, unless otherwise approved by the COR: 07:00-16:30h Monday through Friday Except the following: Abatement work Off Hours Monday through Friday1700-0600 or Weekends. Noisy work 70Db and above inside the building Off Hours M-F 1700-0600 or Weekends. Excessively Noisy exterior work Off Hours M-F 1700-0600 or Weekends. Work on Federal Holidays requires permission from the COR except Memorial Day and Veterans Day. Weather needs to be forecasted to be 56°F or below consistently for 3x days prior to start of construction and remain below 56°F throughout the remainder of the work. 3 Work Location and Restrictions The work site location is at the Edward P. Boland Campus- VA Central Western Massachusetts Healthcare System. The contract work is limited to Building 1. When the contractor s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the COR. 3.1 Project Safety Contractor shall comply with the VA Construction Safety Guidebook as well as all OSHA requirements. Exterior work areas shall be fenced in with temporary fence. Interior work areas must maintain ICRA barriers which shall not impede patient thru traffic. A 5 foot wide clear path must be maintained through the Building 1 main corridor. FAR Clause 52.236-13 subparagraph (f) is invoked: 3.2 Penetrations of Fire and Smoke Barriers Prior to any installation of equipment, cables, power connections, conduit, piping or other work that penetrates a smoke or fire barrier, all such work must be approved by the site-specific Facilities Management Service (FMS) via the COR. An above ceiling/penetration permit must be secured from FMS prior to disturbing the integrity of the barrier. The permit must be available for inspection at the project location. After the work is completed, the penetration must be repaired (sealed) according to accepted practice and utilizing materials (including UL/FM-listed through penetration fire stopping materials) that meet the original barrier construction requirements in order to restore the designed specifications for smoke and fire compartmentalization. Upon completion of any penetration repair, a visual inspection for approval must be requested from, and completed by FMS. 3.3 Interim Life Safety Protection Measures Contractor shall participate with the VA in the preparation of an interim life safety measures and fire protection Plan that will be implemented during construction of this project. At a minimum, contractor shall comply with the followi
Who won similar work
7 award notices on SAM.gov in the last 24 months. Matched by: Same office (241-NETWORK CONTRACT OFFICE 01 (36C241)), same product/service code (PSC) Z1DZ.
Single-winner award sizes (7): middle half $456K to $3.5M, median $524K; range $280K to $7.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| AmeriTech Contracting LLC | 3 | $12.6M | Sep 26, 2025 |
| KEE SOLUTIONS LLC | 2 | $805K | May 8, 2025 |
| VETERANS CONSTRUCTION LLC | 1 | $1.8M | Dec 5, 2024 |
| VETERANS DEVELOPMENT CORPORATION | 1 | $481K | Nov 14, 2024 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 26, 2025AmeriTech Contracting LLC$5.2MZ1DZ--402-22-755 Replace Laundry HVACNo listed company matched (Materiality N/A)
- May 8, 2025KEE SOLUTIONS LLC$524KZ1DZ--Bangor Imaging Ste & Dental X-RayNo listed company matched (Materiality N/A)
- Apr 17, 2025AmeriTech Contracting LLC$7.0MZ1DZ--SATOC Mechanical (VA-24-00094556)No listed company matched (Materiality N/A)
- Jan 6, 2025AmeriTech Contracting LLC$432KZ1DZ--523A5-24-010 Expansion Joint CorrectionsNo listed company matched (Materiality N/A)
- Dec 5, 2024VETERANS CONSTRUCTION LLC$1.8MZ1DZ--402-24-110, DB Structural Repairs and Improvements to Support BuildingsNo listed company matched (Materiality N/A)
- Dec 2, 2024KEE SOLUTIONS LLC$280KZ1DZ--402-23-003S Install Security Upgrades and PACS DevicesNo listed company matched (Materiality N/A)
- Nov 14, 2024VETERANS DEVELOPMENT CORPORATION$481KZ1DZ--518-24-321 Chapel Steam Line RepairNo listed company matched (Materiality N/A)
Competitive landscape
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.