Sources SoughtPosted Jun 29, 2026·Responses due Jul 10, 2026

NAVFACSYSCOM NORTHWEST Shipyard Infrastructure and Optimization Program (SIOP) P454 Multi-Mission Dry Dock (M2D2)

NAVFAC (Naval Facilities Engineering) · NAVFACSYSCOM NORTHWEST

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
237990
Value
Not stated
Solicitation
N4425526R0005
Set-aside
None stated
PSC
Z2ED
Place
Silverdale, WA, USA
Contact
Jodus Horton (jodus.d.horton.civ@us.navy.mil)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation N4425526R0005 in this department, oldest first.

Early notice
  • Jun 15, 2026
    Special Notice
    Open
  • Jun 15, 2026
    Special Notice
    Open
  • Jun 29, 2026
    Sources Sought
    Open
  • Jun 29, 2026 · this notice
    Sources Sought
  • Jul 1, 2026
    Sources Sought
    Open
  • Jul 1, 2026
    Sources Sought
    Open
  • Jul 1, 2026
    Sources Sought
    Open
  • Sep 14, 2026
    Pre-solicitation
    Open
  • Sep 22, 2026
    Pre-solicitation
    Open
  • Sep 22, 2026
    Pre-solicitation
    Open
Solicitation
  • Sep 30, 2026
    Solicitation
    Open
  • Sep 30, 2026
    Solicitation
    Open
Award
Not yet. Typical award: Aug 26, 2026 to Mar 27, 2027, middle of the range Nov 15, 2026.
Measured from 3964 past early notices at Dept of the Navy that later posted an award (middle half of cases, counted from Jun 15, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

Title: Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Type: Sources Sought Notice Location: Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Pearl Harbor Naval Shipyard (PHNSY & IMF), and other areas under the cognizance of Naval Facilities Engineering Systems Command (NAVFAC). The Navy intends to issue an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) Request for Proposal (RFP) in September 2026. Period of Performance/Maximum Value: The period of performance wil… (show all)

l be a base period of 5-years and up to three 1-year option periods for a maximum possible duration of 8-years; or an aggregate maximum estimated value of $30,000,000,000 for all task orders, whichever occurs first. Contract Type: The Navy intends task orders issued for construction projects to be fixed-price (FP) in accordance with 10 U.S.C. 3323 and DFARS 216.301-3. Where authorized, cost reimbursement task orders may be issued to allow the Government maximum flexibility in determining the best contract type for the specific task order after consideration of the risks to the Government and contractors. Task Order Range: The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000. However, smaller task orders may be issued to support smaller efforts like Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). The Navy anticipates that most work under the MACC will be initiated by task order(s) that are competed amongst all the MACC holders. Additionally, all MACC holders may be issued task orders for the same scope of work for ECI and/or ATC. And where justified, task order awards may be issued to a single MACC holder. The Navy makes no representation as to the number of task orders or actual amount of work to be ordered; however, each MACC holder will receive a minimum guarantee. To qualify for this MACC, Offerors will need to demonstrate single project bonding capacity of $2,000,000,000. The anticipated acquisition timeline includes: Industry Day: August 2026 Issue MACC Solicitation: September 2026 MACC Phase I proposals due: October 2026 MACC Phase II proposals due: January 2027 MACC Award: May 2027 Issue Alternative Technical Concept (ATC) Task Order: June 2027 ATC due: October 2027 RFP Task Order Marine Package #1: November 2027 Planned task order award of Marine Package #1: June 2028 Purpose and Scope: The solicitation may result in the award of approximately five (5) multiple award construction contracts. The purpose of the MACC is to issue waterfront and marine mega-construction projects supporting the shipyard infrastructure optimization program (SIOP). This MACC will encompass a wide range of Design Build (DB) and Design Bid Build (DBB) type projects primarily representative of NAICS 236220 and 237990. The focus of this MACC will be the construction of a new proposed Multi-Mission Dry Dock at PSNS & IMF, located at Naval Base Kitsap (NBK) Bremerton, Washington. The Multi-Mission Dry Dock preferred location is within the existing Dry Dock 3 footprint, existing Pier 6, and existing Pier 7; and will include dry dock drainage, dewatering, and flooding systems; a caisson; roadways and rail networks; portal crane track; access and egress elements; mechanical, electrical, and communications systems; support buildings; and utility routing tunnels. The proposed project also includes demolition of facilities and utilities. The Multi-Mission Dry Dock is a fully pressure-relieved dry dock capable of accommodating shipyard repair services for the newest Ford-class aircraft carrier, Nimitz-class carriers, and other surface and subsurface ships served by PSNS & IMF. Dredging south of Multi-Mission Dry Dock is proposed for the Double-Wall Cofferdams, which provides means to support construction of Multi-Mission Dry Dock in the dry, and provides hydraulic cutoff in the permanent condition. The bathymetry in Sinclair Inlet provides adequate water depths to support the drafts of the respective design vessels at berth and during docking/undocking evolutions. Site access is anticipated to be a combination of a temporary fixed pier southeast of existing Building 460, a contractor access road at Bremerton Gate, existing Piers 6 & 7, Dry Dock 3, and the South Gate vehicle inspection building. Prior to establishing the above-described entry points the Navy requires the contractor to install a temporary Controlled Industrial Area (CIA) fence that will encompass the project site. For more information on the proposed Multi-Mission Dry Dock project see: https://bremertonwaterfrontimprovementseis.com/ https://multimissiondrydock.com/ It is anticipated the construction project will be contracted via individual task order packages that may include the following: Task Order Package #1 � Marine Pier, Building, Upland Utility Demo Dredging Construction of upland shoring and cutoff wall Construction of double-wall cofferdam Upland ground Improvements Task Order Package #2 � Dry Dock Construction dewatering Installation of upland shoring wall tie-backs Dry Dock 3 demolition Upland excavation Construction of pressure relief system Construction of dry dock including entrance and quay walls Pumpwell installations Task Order Package #3 � Infrastructure Support buildings Electrical substations Utility tunnels Partial Farragut Avenue tunnel replacement Procure and install process equipment Installation of permanent upland utilities Paving and crane rail installation Fabrication and installation of fendering system Temporary double-wall cofferdam demolition Caisson installation Testing and Commissioning Task Order Package #4 � Caisson Fabrication and delivery of caisson Potential Risk Mitigations: The Navy is considering the following risk mitigation measures including: Early Contractor Involvement (ECI) Limiting task order performance bonds to a maximum of $2 billion Economic Price Adjustment (EPA) Award Fee Incentive Reduce small business subcontracting goals Interested firms are requested to return a completed response form (attached) that addresses the following criteria: TYPE OF BUSINESS: State whether your firm is a large or small business. If a small business, state whether Small, HUBZone, Small Disadvantaged, Service-Disabled Veteran-Owned, and/or Woman-Owned. See FAR Part 19 Small Business Programs for descriptions. BONDING CAPABILITY: Provide your firm�s per project and cumulative bonding capabilities. It is anticipated that each firm awarded a contract under this proposed MACC will need a minimum bonding capacity of $2,000,000,000 per project and a high aggregate bonding capacity. PROJECT EXPERIENCE: Provide up to five (5) projects which best demonstrate the company�s experience relative to the types of work covered by this requirement. Projects are to be representative of NAICS 236220 and 237990, the description above, and be similar in size, scope, and complexity to this requirement. Projects may include federal, state or local Government, and/or commercial projects. Submission of more than five (5) projects is not requested. Within the Narrative Description section of the response form, describe each project sufficiently to demonstrate your firm�s relevant experience with the types of work described in this notice. Only provide projects where your firm acted as the Prime. Include projects that demonstrate construction and/or design experience with new construction, renovation, alteration, demolition, and/or repair work by DB and/or DBB for anticipated projects and scope elements which may include: NAICS 236220 Commercial and Institutional Building Construction: Industrial, maintenance, warehouses, production, communications, personnel support, recreation, lodging, medical, training, ranges, roads, special access program facilities (SAPF) or sensitive compartmented information facilities (SCIF�s), or other similar fa

Who won similar work

4 award notices on SAM.gov in the last 24 months. Matched by: Same agency (NAVFAC (Naval Facilities Engineering)), same product/service code (PSC) Z2ED.

Single-winner award sizes (4): middle half $16.1M to $133.0M, median $24.3M; range $8.6M to $442.2M.

WinnerAwardsValueLast
MEB GENERAL CONTRACTORS INC1$442.2MDec 8, 2025
CHEROENHAKA NOTTOWAY ENTERPRISES, LLC1$30.0MJan 29, 2025
ENGINEERED CONSTRUCTION SERVICES, INC.1$18.5MMay 14, 2026
P & S CONSTRUCTION INC.1$8.6MSep 24, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (0 filings)
  • 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.