Y1DA--Renovate Bldg. 110 Ground Floor | 590-21-121
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24625B0013 in this department, oldest first.
- Apr 18, 2025SolicitationOpen
- Apr 18, 2025SolicitationOpen
- Apr 24, 2025SolicitationOpen
- Apr 30, 2025SolicitationOpen
- Apr 30, 2025SolicitationOpen
- May 13, 2025SolicitationOpen
- May 19, 2025SolicitationOpen
- May 28, 2025 · this noticeSolicitation
- Jun 3, 2025SolicitationOpen
- Jun 3, 2025SolicitationOpen
- Jun 3, 2025SolicitationOpen
- Aug 21, 2025Award NoticeCHESAPEAKE PLANNING AND CONSULTING LLC · $2.0MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTRACTOR S REQUEST FOR INFORMATION AND GOVERNMENT RESPONSES The description for Alternate #3 on drawing GI001 makes reference to an infrared scan. We are not able to locate this reference document. Please provide the infrared scan document. See RoofScan Report dated: January 20, 2023, prepared by Pinnacle Engineering, LLC. The description for Alternate #3 on drawing GI001 appears to require Alternate #3 to be an additive line item. The description on for Bid Item IV in the Price/Cost Schedule on page 7 of 81 of the IFB clearly describes this line item as a deductive line item. Please confirm… (show all)
that the cost of the roof repairs is to be included in the Base Bid and a deductive price is to be provided in the Bid Item IV in the Price/Cost Schedule. Provide Alternate #3 as indicated in the price/cost schedule on page 7 of the IFB to be a deductive line item Please confirm that the Superintendent can also perform the duties of the SSHO as well. The site Superintendent may perform the duties of the SSHO. If permitted to serve as the SSHO, the site superintendent must meet the minimum qualifications for both SSHO and Superintendent. Fire Protection note #12 on drawing FP000 requires a coordinated set of shop drawings . Spec section 21 13 13 requires shop drawings and hydraulic calculations as well. The work of the project is only to add and relocate sprinkler heads on an existing system. Please confirm that shop drawings and hydraulic calculations will not be required for this project. Follow NFPA 13 chapter Existing System Modifications . Provide shop drawings with product data for new materials for areas within the Area of Work that will be added or modified. Sprinklers shall not be re-used per NFPA. Show enough of the existing system on the shop drawings to make all conditions clear as directed by NFPA 13. Hydraulic calculations will not be required unless required by NFPA 13. Once the existing ceilings are removed, does the government require that the existing sprinkler heads be turned to the upright position during construction until they can be turned back down into the new ceiling grid? Yes. On drawings AE010, for the wall designation G3d 2 S, what does the 3 represent? The 3 represents the structural stud size: The 3 represents the structural stud size: STUD SIZE 1 - 1 5/8" METAL STUD 2 - 2 1/2" METAL STUD 3 - 3 5/8" METAL STUD 4 - 4" METAL STUD / 4" SHAFTWALL STUD / 3-5/8" BLOCK 6 - 6" METAL STUD / 6" SHAFTWALL STUD The description for Alternate #3 on drawing GI001 appears to require Alternate #3 to be an additive line item. The description on for Bid Item IV in the Price/Cost Schedule on page 7 of 81 of the IFB clearly describes this line item as a deductive line item. Please confirm that the cost of the roof repairs is to be included in the Base Bid and a deductive price is to be provided in the Bid Item IV in the Price/Cost Schedule. Provide Alternate #3 as indicated in the price/cost schedule on page 7 of the IFB to be a deductive line item. One of the electric panels in the corridor are removed and relocated to Rm DG50, the existing vinyl wall guard will need to be replaced given the holes in the existing wall guards due to the space occupied by the electric panels. Please provide the product specification for the existing vinyl wall protection guards. Specifications will be provided. In the same area the electric panels in the corridor are removed and relocated to Rm DG50, are the existing handrail and crash rails to be extended to the adjacent doorway? Yes Are the existing ceiling mounts for the TV monitors to be included in the demolition or will they be removed by the government? Existing ceiling mounts for TV monitors to be included in demolition Please confirm that all of the medical related equipment and devices will be removed by the government (or others) and is not required to be relocated by the contractor. All the medical related equipment and devices will be removed by the government. Please confirm that any devices, furnishings, equipment, cubical track curtains, etc that will remain in the space to be renovated and are not indicated on the drawings to remain are to be removed by the contractor and disposed. Yes The space above the ceilings is only 27 inches and is grossly insufficient for the new work to be installed. Will the government consider lowering the ceiling height to 8 ft for the new Admin Space DG52? It is the intent of the design to keep that ceiling as close to 9 -0 as possible. The AE and VA will work with the awarded contractor during construction regarding the ceiling height and the above ceiling work required. 8 -0 is the minimum ceiling height required. Can the FM 4991 requirement for firestopping be override if the subcontractor is registered with SAM to work on military projects? Or is it acceptable if they are qualified as an Accredited Firestop Contractor (HAFSC). Follows the TIL requirements. Is there any roofing work and which areas would they be? See Sheet AE300 for roof work and coordinate roofing with MEP and the infrared scan report dated 1/20/2023. Where will the electrical panels be removed in the corridor, and the wall will be filled in, what is the color that the KTR must match? Color will be provided by VA. The drawings incorrectly reference the water filtration room, will these be corrected? Yes Will the work be done during working hours and will that part of the hospital be open during construction. Patient care is very important to the VA that may lead to working hours consisting of day, night and on weekends. The hospital will be open during construction. To be included in TAB B , the solicitation calls for: d. Complete Brand Name or Equal Clause and submit with electronic offer. We see that Page 42 contains the 4.6 CONSTRUCTION MATERIALS BRAND NAME OR EQUAL LIST Are we right to assume, that this submission is if needed ? So, if we are not using any equal product, we do not have to submit anything. If you are not using any equal product, you are still required to complete the Complete Brand Name or Equal Clause. In this case, you will provide the brand name. This is not a if needed requirement. It is required to complete either with a brand Name or Equal Product, whichever is applicable. Since we were not able to observe the active space were dialysis is currently being performed as required by FAR 52.236.3, we respectfully request another site visit as was discussed during the initial site visit. A second site visit was held on May 8, 2025, at 10:00 AM Eastern Daylight Time. Since we were not able to observe the active space where dialysis is currently being performed as required by FAR 52.236.3, we respectfully request an extension to the due date for questions since we have not yet observed the existing conditions and additional questions. A second site visit was held on May 8, 2025, at 10:00 AM Eastern Daylight Time. Drawing AE010 contains detail G10 for corner guards. However, the drawings do not identify the locations corner guards to be provided. Please provide a drawing Which shows the locations the corner guards are to be provided. Provide corner guards on all outside corners of new partitions and gypsum board column covers. 23. Drawing AE110 contains detail G10 for a trench repair detail. However, the drawings do not identify the locations the trench detail is to be provided. Please provide a drawing which identifies the locations the trench repair is required to be provided. The trench repair detail G10/Sheet AE110 is provided for the patching of the existing concrete slab as required by the MEP SOW. See Note A, Sheet AE110 PATCH EXISTING CONCRETE FLOOR SLAB AS REQUIRED BY MEP SCOPE OF WORK. SEE MEP DRAWINGS FOR PIPING AND DRAIN REMOVAL AND COORDINATE FLOOR PATCHING PRIOR TO INSTALLATION OF NEW FLOORING. The drawings and specifications do not appear to require any permanent signage to be provided. Please confirm permanent signage (room signs, location signs, wayfare signs, etc ar
Who won similar work
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same product/service code (PSC) Y1DA and NAICS 236220.
Single-winner award sizes (4): middle half $5.7M to $10.8M, median $8.1M; range $28K to $17.5M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| GROUP III MANAGEMENT INC | 1 | $17.5M | Aug 3, 2026 |
| BRIGHT REGARDS, LLC | 1 | $8.5M | Jul 30, 2025 |
| BRYMAK FSI JV, LLC | 1 | $7.6M | Sep 12, 2025 |
| BTR ENTERPRISES OF SC LLC | 1 | $28K | Jun 23, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Aug 3, 2026GROUP III MANAGEMENT INC$17.5MY1DA--652-24-103 Increase Surgical AccessNo listed company matched (Materiality N/A)
- Sep 12, 2025BRYMAK FSI JV, LLC$7.6MY1DA--Replace Nurse Call System | 652-21-102No listed company matched (Materiality N/A)
- Jul 30, 2025BRIGHT REGARDS, LLC$8.5MY1DA--652-14-106 Improve Patient Privacy 4BNo listed company matched (Materiality N/A)
- Jun 23, 2025BTR ENTERPRISES OF SC LLC$28KY1DA--Repurpose Fountain Main EntranceNo listed company matched (Materiality N/A)
Competitive landscape
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.