Y1QA--Building 11 Egress Stairs Salisbury VAMC
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24625B0003 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
STATEMENT OF WORK SCOPE OF WORK: General: The purpose of this project is to provide bldg. 11 with two (2) metal egress stairs for additional means of egress out of the building. The work covered by this document and accompanying specifications consists of furnishing all labor, equipment, appliances, devices, and materials, and performing all operations necessary in designing and producing two (2) new metal egress stairs. Work includes, but not limited to, hardware, painting, masonry. All work, including final cleanup and completion of any punch list items, shall be performed within one hundred… (show all)
and twenty (120) calendar days of receipt of the Notice to Proceed. Work shall be performed in accordance with specifications and drawings as they apply to industry standards. DEMOLITION & MOBILIZATION: Site Preparation: Contractor to conduct Site Survey before mobilizing. Coordinate with COR of location of material and/or office support elements. Dumpster shall be located on site and always covered. Coordinate with COR for location. All debris shall be removed from site and if exposed outside of construction area it shall be covered and always protected. Infection control measures shall be always deployed. ARCHITECTURAL Contractor shall submit engineered shop drawings produced by the subcontractor of all required materials, equipment, and site modifications. the COR shall be informed of any site differing conditions. New materials and finishes shall match existing. Contractor is responsible for making repairs on all areas disturbed by the contractor and their subs. STRUCTURAL All partitions, walls, floors, and ceilings shall remain structurally sound. FINISHES Low VOC paint and other applicable finishes shall match existing spaces. Necessary millwork modifications shall be performed in a way as to not impede the VA s staff and patients and accurately cut for sizing and penetrations. All finishes shall conform to Building Code and VA Hospital specifications. Samples to be provided upon request. TECHNICAL REQUIREMENTS Progress Reporting: The Contractor shall report construction progress daily to the Contracting Officer s Representative (COR). Any delays must be communicated to the COR as soon as possible after they occur. This report must be in writing. The format of this report will be discussed during the pre-construction meeting. Any changes to this scope of work must be approved IN WRITING, by the Contracting Officer, before the Contractor is authorized to begin work on the proposed change. Supervision by Contractor: The Contractor shall provide a Site Superintendent carrying a 30-hr OSHA card who shall be on-site whenever work is being performed. The Site Superintendent shall be separate from the prime sub-contractor and employed by the prime contractor. Responsibilities of the Site Superintendent are as follows: Oversight of project and preliminary approval of all material submittals and change order requests. Daily inspections of progress. The results of the daily inspections shall be submitted to the COR in a daily report. Coordination of a weekly meeting with the COR. REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK. All work which does not conform to the requirements of the Contract will be considered unacceptable. Unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness or any other cause, found to exist prior to the final acceptance of the work, shall be remedied or removed immediately and replaced in an acceptable manner. LOCATION OF WORK: Salisbury VAMC, building 11 PROJECT SCHEDULE: Details of the project schedule pertaining to the definitions of percent completion will be submitted and milestone noted for progress payments. PERFORMANCE REQUIREMENTS: A jobsite supervisor carrying a 30-hour OSHA card must be on-site whenever work is being performed. A photocopy of that card along with a State or Federally issued photo ID must be provided before any work begins on-site. Vendor will clean up daily before leaving the worksite. Smoking is not permitted in the building or near entrances. Metal stairs will be fabricated before arrival. On-site fabrication is not allowed. Modifications may be made in COR designated areas only. Vendor arranges a work schedule with us so we can make the appropriate notifications a minimum of ten (10) working days in advance of arrival. Any removed debris will be disposed of daily by the contractor, in the contractor s provided dumpster. Tools and equipment will not be left un-attended or left overnight. No restroom facilities are in the immediate area. It is the contractors responsibility to provide and maintain any portable restroom facility deemed necessary for the project. WORK HOURS: The services covered by this contract shall be furnished by the contractor as defined herein or as coordinated with the Contracting Officer Representative (COR).� The contractor shall not be required, except in case of emergency, to furnish such services on a Federal Holiday or during off duty hours as described below. The following terms have the following meanings: Facility s normal working hours:� Monday through Sunday, 8:00 a.m. 5:30 p.m., excluding federal holidays. Federal Holidays:� The 11 holidays observed by the Federal Government are: New Year s Day Martin Luther King s Day President s Day Memorial Day Juneteenth Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Christmas Any other day specifically declared by the President of the United States to be a federal holiday. When one of the holidays falls on Sunday, the following Monday shall be observed as a Federal Holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a Federal Holiday. PAYMENTS: Payments will be made in arrears following the receipt of the invoice and the monthly summary report. Two payments will occur under this contract; once material delivery occurs, and at completion of the project. INVOICES: Invoices shall be submitted twice (as directed in Payments section above), in arrears, and shall include at a minimum: Date of invoice, Contract Number, Purchase Order Number, Vendor Name, Invoice Number, CLIN & Date of service. Payment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, and submitted through the COR for initial approval, then into Tungsten Network (formerly known as OB10) http://www.tungsten-network.com/us/en/. A properly prepared invoice shall contain: Invoice Number and Date Contractor s Name and Address Accurate Purchase Order Number Supply or Service provided Period Supply or Service Provided Total Amount Due Please begin submitting your electronic invoices through the Tungsten Network for payment processing, free of charge. If you have questions about the e-invoicing program or Tungsten Network, contact information is as follows: Tungsten e-Invoice Setup Information: 1-877-489-6135 Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com FSC e-Invoice Contact Information: 1-877-353-9791 FSC e-invoice email: vafsccshd@va.gov Web Address: HTTP://WWW.FSC.VA.GOV/EINVOICE.ASP SAFETY AND LIABILITY: Contractor assumes all responsibility for the safety of the workers on the job site. Site Superintendent shall meet the following requirements: A minimum of 1-year safety work on similar projects; 30-hour OSHA construction safety class or equivalent within the last 3 years. Some work will be in shafts, special safety consideration will need to be taken and addressed. LIABLE CONTRACT ITEMS: Contractor is only responsible for initial items included in this Statement of Work, drawings, specifications, and for any repairs to damage caused by the workers during construction. Contractor will be responsible for all damages caused by construction, regardless of whether the item was originally included in the scope of work. Damaged work area shall be restored to its original condition. PORTABLE EXTENSION CORDS: Porta
Who won similar work
6 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Veterans Affairs), same industry group (NAICS 3323).
Single-winner award sizes (6): middle half $65K to $296K, median $89K; range $16K to $479K.
| Winner | Awards | Value | Last |
|---|---|---|---|
| ELITE ALUMINUM CORP | 1 | $479K | Dec 9, 2024 |
| MODULAR MANAGEMENT GROUP INC | 1 | $358K | Dec 5, 2024 |
| EGO 7 SERVICES, LLC | 1 | $111K | Sep 14, 2026 |
| ECHELON 1 SOLUTIONS LLC | 1 | $68K | Dec 11, 2025 |
| MJL ENTERPRISES, LLC | 1 | $64K | Sep 24, 2026 |
| MORGAN INGLAND LLC | 1 | $16K | Sep 17, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 24, 2026MJL ENTERPRISES, LLC$64K5410--Exterior Decontamination Shelter - FARGO VA Medical FacilityNo listed company matched (Materiality N/A)
- Sep 14, 2026EGO 7 SERVICES, LLC$111KPharmacy Fire DoorNo listed company matched (Materiality N/A)
- Dec 11, 2025ECHELON 1 SOLUTIONS LLC$68K8145--HAZARDOUS WASTE STORAGE UNIT RFQ AMEND 1No listed company matched (Materiality N/A)
- Sep 17, 2025MORGAN INGLAND LLC$16K5335--Supplies - Radiator CoversNo listed company matched (Materiality N/A)
- Dec 9, 2024ELITE ALUMINUM CORP$479KJ034--Mobile Intensive Care Unit Storage, Inspection and Preventative MaintenanceNo listed company matched (Materiality N/A)
- Dec 5, 2024MODULAR MANAGEMENT GROUP INC$358K5410--DO/TO Supply - 2024 Modular Building Rental - IC 36C26325F0016No listed company matched (Materiality N/A)
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.