20 SOAMXS Compact Mini Crawler Cranes � SpyderCrane URW375/URW376 Brand Name or Equal
Air Force and Space Force · FA4855 27 SOCONS LGC
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation FA485526Q0055 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Notice to Offeror(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds become available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse any offeror for any costs. DESCRIPTION The 20th Special Operations Aircraft Maintenance Squadron requires two new, unused, current-production compact mini crawler cranes/spider cranes to support CV-22 aircraft maintenance lifting operations. The … (show all)
cranes will be used in restricted-access and limited-maneuverability areas where hangar lifting equipment, fixed lifting equipment, or conventional mobile crane support is unavailable or impractical. The cranes must be suitable for aircraft maintenance operations on paved and unimproved surfaces and must be sufficiently compact and transportable to support temporary-duty, deployed, and austere operating environments. Each crane shall be furnished as a complete and operational system. The acquisition also includes the accessories and support items identified in the solicitation pricing schedule, including: Single-person, boom-tip-mounted work platform; Heavy-duty protective crane covers in tan; Non-marking tracks suitable for aircraft maintenance and hangar environments; Hydraulic tilt-deck trailer; Track mats; Two-year spare-parts and maintenance-support package; Manufacturer warranty coverage; Manufacturer operating, maintenance, safety, and technical documentation; Parts availability; and Technical and maintenance support. Operator training is not required under this acquisition. 2. Brand Name or Equal The brand-name reference is SpyderCrane URW375/URW376 or equal. The brand name is used to describe the configuration, quality, compact transportability, lift performance, controls, safety systems, accessory compatibility, field-operating capability, and supportability required to satisfy the Government's aircraft maintenance mission. Use of the brand-name reference does not preclude competition. An equal product will be considered when the quoter demonstrates that the offered product meets or exceeds every minimum salient physical, functional, and performance characteristic stated in this solicitation. FAR 52.211-6, Brand Name or Equal, applies to this acquisition. 3. Minimum Salient Characteristics A. Configuration The offered product shall be a compact, crawler-mounted mini crane/spider crane suitable for aircraft maintenance lifting operations in restricted-access and limited-maneuverability areas. The crane shall include a hydraulically telescoping boom, crawler-mounted mobility, and a multi-position stabilizing outrigger system capable of supporting safe lifting operations. B. Load and Working-Radius Capability Official manufacturer load charts shall demonstrate that the offered crane is capable of safely lifting not less than 5,000 pounds at a 10-foot working radius. The documentation shall identify the applicable: Boom length and configuration; Working radius; Outrigger or stabilizer configuration; Parts-of-line and hook-block configuration; and Operating conditions or limitations applicable to the rated capacity. Maximum advertised crane capacity alone is insufficient. The required capacity at the specified working radius must be shown in an official manufacturer load chart. C. Hook Height The crane shall provide a hook or boom-tip height of not less than 41 feet, without relying on a modification. The quoter shall provide official manufacturer documentation identifying the offered crane's maximum standard-boom hook or tip height and any applicable operating limitations. D. Load-Chart Verification Official manufacturer load charts must show rated lifting capacities at the applicable working radii, boom configurations, outrigger configurations, and hook heights. Generic capacity statements, maximum-capacity ratings, marketing literature without a supporting load chart, or unsupported statements from a dealer or reseller will not satisfy this requirement. E. JP-8 Fuel Compatibility The crane shall be furnished in a manufacturer-approved configuration capable of operating on JP-8 fuel. The quotation must include written documentation from the original equipment manufacturer confirming JP-8 compatibility. The documentation shall address: Engine compatibility; Fuel-system compatibility; Emissions-system compatibility; Manufacturer warranty coverage during JP-8 operation; JP-8-specific maintenance requirements; and Any restrictions, limitations, or required modifications associated with JP-8 operation. A general diesel-fuel rating or an unsupported dealer, distributor, or reseller statement is insufficient. The proposed crane will be determined technically unacceptable if the manufacturer does not confirm JP-8 compatibility. F. Mobility and Transportability The crane shall be crawler-mounted and suitable for operation on unimproved surfaces, ramps, and limited-access aircraft maintenance areas. Travel or fully stowed dimensions shall not exceed: Width: 51 inches; Height: 71 inches; Length: 171 inches; and Crane weight: 8,760 pounds. Dimensions shall be measured with the crane in its normal transport configuration, with the boom, outriggers, hook, and permanently installed equipment fully stowed. The crane shall be sufficiently compact and transportable to support the Government's aircraft deployment and transportation requirements. G. Stabilization The crane shall include an outrigger or stabilizer system capable of supporting safe lifting operations on paved and unimproved surfaces. The system shall include outrigger and boom interlocks, stability monitoring, or an equivalent manufacturer-installed system that prevents crane operation outside the authorized load and stability configuration. H. Operator Controls The crane shall include: Full-function wireless or radio remote-control capability; Onboard operator controls; Variable or proportional controls suitable for precise load positioning; and Emergency-stop capability. The control system must permit safe and precise load positioning in restricted aircraft maintenance areas. I. Safety Systems The offered crane shall include, at a minimum: Load Moment Indicator or equivalent rated-capacity monitoring system; Anti-two-block system; Over-winding prevention device or equivalent protection; Automatic winch brake or equivalent braking system; Emergency-stop capability; Outrigger and boom interlock monitoring; Hydraulic pressure-relief protection; Minimum wire-rope automatic stop or equivalent protection; and Automatic hook-stow system or equivalent secure transport configuration. Safety systems shall be installed or approved by the original equipment manufacturer. J. Boom and Crane Operation The crane shall include: Hydraulically telescoping boom; Continuous or unrestricted 360-degree swing operation; Positive boom and hydraulic holding valves; Onboard diagnostic capability; and Rated-capacity monitoring appropriate for the crane's boom, radius, and outrigger configuration. K. Accessories All accessories shall be compatible with and approved by the crane's original equipment manufacturer. Accessories shall not invalidate or reduce the manufacturer's crane certification, safety rating, rated lifting capability, or warranty coverage. The boom-tip-mounted work platform must be approved for use with the offered crane and include all required attachment components, controls, safety devices, and documentation. The non-marking tracks shall be suitable for use on aircraft maintenance and hangar flooring. The hydraulic tilt-deck trailer shall be sized and rated for safe transportation of the offered crane and the associated accessories. The trailer shall include all necessary tie-down points, ramps or hydraulic loading components, and track mats identified in the pricing schedule. L. Warranty and Support The offered equ
Who won similar work
10 award notices on SAM.gov in the last 24 months. Match: Same agency (Air Force and Space Force), same NAICS 333923.
| Winner | Awards | Value | Last |
|---|---|---|---|
| MARINE TRAVELIFT INC | 2 | $529K | Apr 29, 2026 |
| AOCS, INC | 2 | $220K | Apr 17, 2025 |
| TAZA SUPPLIES INC | 1 | $850K | May 26, 2026 |
| FEDERAL CONTRACTS LLC | 1 | $487K | Aug 6, 2025 |
| B & H INTERNATIONAL LLC | 1 | $124K | Jan 23, 2025 |
| INDUSTRIAL TOOL PRODUCTS INC | 1 | $104K | Jul 1, 2026 |
| GOVCREST INC | 1 | $67K | Jul 1, 2026 |
| RCKWELL LLC | 1 | $47K | Jun 27, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Jul 1, 2026GOVCREST INC$67KHoist Removal and Replacement
- Jul 1, 2026INDUSTRIAL TOOL PRODUCTS INC$104K1.5 Ton Bridge Crane & Hoist Assembly
- May 26, 2026TAZA SUPPLIES INC$850KOverhead Bridge Crane System
- Apr 29, 2026MARINE TRAVELIFT INC$507KGantry Crane Repair Parts
- Aug 25, 2025MARINE TRAVELIFT INC$22KGantry Crane Parts
- Aug 6, 2025FEDERAL CONTRACTS LLC$487KJLG Boom and Scissor Lifts
- Jun 27, 2025RCKWELL LLC$47KHoist Replacement
- Apr 17, 2025AOCS, INC$110K3 Ton Bridge Crane
- Apr 15, 2025AOCS, INC$110K3 Ton Bridge Crane
- Jan 23, 2025B & H INTERNATIONAL LLC$124KMobile Overhead Fall Protection
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Air Force, Dept of since 2024 (0 filings)
- 0 of their lobbyists list a past Air Force, Dept of job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.