SolicitationPosted Apr 28, 2026·Responses due May 13, 2026

Z1DA--598-19-112 Replace Underground 15kV Feeders and Transformers-NLR

Veterans Affairs · 256-NETWORK CONTRACT OFFICE 16 (36C256)

Stage
Open solicitation
NAICS
238210
Value
Not stated
Solicitation
36C25626R0023
Set-aside
None stated
PSC
Z1DA
Place
Not stated
Contact
Andrew T Misfeldt (andrew.misfeldt@va.gov)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C25626R0023 in this department, oldest first.

Early notice
  • Feb 10, 2026
    Pre-solicitation
    Open
Solicitation
  • Mar 3, 2026
    Solicitation
    Open
  • Mar 3, 2026
    Solicitation
    Open
  • Mar 3, 2026
    Solicitation
    Open
  • Mar 31, 2026
    Solicitation
    Open
  • Mar 31, 2026
    Solicitation
    Open
  • Apr 2, 2026
    Solicitation
    Open
  • Apr 13, 2026
    Solicitation
    Open
  • Apr 28, 2026 · this notice
    Solicitation
  • May 8, 2026
    Solicitation
    Open
  • May 14, 2026
    Solicitation
    Open
Award
  • Sep 21, 2026
    Award Notice
    ForUs Contracting, Inc. · $6.7M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

36C25626R0023 RFI Answers Proposal RFI #1 Drawing E502 (partial one-line) shows 5KV switchgear feeding transformers and 15KV switchgear feeding transformers. Is that accurate? What is the primary voltage of all the transformers? Can we get that included in the table on drawing E501. Use drawings E401-E406. Drawing # 502 detail 4 show existing 5KV switch gear at building 88 has been removed. Everything is 15KV. Proposal RFI #2 Can we get a one-line that shows all the transformers and manholes? Similar to drawing E502 but will all the transformers and manholes. See the attached marked up E502 th… (show all)

at shows the transformers I was able to deduce by the buildings they are feeding (per the table in E501). Note that one of the manholes we looked at during the site visit was outside of Building 69, and it has cables running through it with T-connectors tapped off to feed a load that was assumed to be the nearby Transformer 18, but drawing E502 shows a separate unlabeled vault feeding T18. So drawing E502 might not be very accurate anyway, but it could be a good starting point, and it would helpful if the loops were color-coded. Attached drawings are for information only. Proposal RFI #3 Can we get a bid extension of at least two weeks? See P0003 Block 11. Proposal RFI #4 Can we schedule another site visit and walk to every transformer that is being replaced? Can we also look at the switchgear feeding the loops, and can we see the sites where the sectionalizers are going to be installed? An additional site visit will not be authorized. Proposal RFI #5 Can we assume that the cable feeding each transformer will need to be replaced because it s impossible to know if the existing cables will be long enough to reach the new transformer terminals? Can we get approximate (or assumed average) distances from the separable connectors to the transformers? The intent is to procure replacement transformers with similar connections that do not require additional cable length. Proposal RFI #6 During the site visit, it was mentioned that there are photos of all the manholes, but those don t appear in the bid documents. Can we get those photos with labels / file names corresponding to the manhole? No organized library of photos exists. Proposal RFI #7 I perused the plans and specs for a specific Schneider PME monitoring system or for a spec section which would outline the salient characteristics of a PME monitoring system. The specs are missing the spec section completely, and the plans make no reference to a BoD. This is an important part of this solicitation, and there are several Schneider options to choose from each providing a leg up on the other https://www.se.com/us/en/product-category/4100-power-metering-and-energy-monitoring-systems/� . Can you please reach out to your engineering department, request more information from them, and post an amendment with the information.� Exact energy monitors shall be coordinated with the VA. Existing monitoring equipment appeared to be Square D PowerLogic PM800 devices. See RFI#22, RFI#41, RFI#42, RFI#43, RFI #45, RFI#46 Proposal RFI #8 None of the drawings showing the cable route are to scale. Can you provide a drawing with an accurate scale in order to get an accurate measurement of the cable lengths? Drawings are intended to indicate locations of each manhole, transformer, and other equipment in SOW. No cabling is expected to be replaced. Only the splices/separable connectors are being replaced. Proposal RFI #9 The drawings are incomplete showing the duct bank route to the transformers. Can you provide drawings showing the complete route? Reference Prints E401-E406 All available information is indicated. See RFI #5, RFI#19, RFI#33, RFI#53. Proposal RFI #10 - The schedule does not indicate the Primary Voltage. Please provide the Primary Voltage for the transformers. All the primary voltages for transformers are 13.8kV. RFI#1, RFI#40 Proposal RFI #11 Is there a spare conduit that can be used for the new cable while the existing cable stays energized? Manholes must be de-energized when accessed. See RFI # 8. Proposal RFI #12 Are we allowed to work in manholes with energized cables in them? No. Proposal RFI #13 Can you provide a drawing to scale showing the route of the manholes with duct-banks and locations of the transformers? All information is indicated. See RFI #8 and 67. Proposal RFI #14 On Sheet E001 Scope of Work Notes Note 1.4 states Provide Grounding as indicated in Specs. for all transformers indicated. The only place in the prints that mention Transformer Grounding is on Sheet E502 Transformer Notes Note 4. States Any transformer without sufficient Grounding shall have new grounding provided as indicated in Detail . The contractor has no way of knowing the quantity of this during the bid process. Please advise as to how we should estimate this or will a cost adjustment be issued when the quantity is known? Electrical equipment should be grounded in accordance with the current National Electric Code standard. Proposal RFI #15 Sheet E001 Scope of Work Notes Note 2.4 states Provide Grounding as indicated in Specs. for all Manholes as indicated. I cannot find anywhere where the prints indicate manhole grounding, please indicate the quantity of manholes needing grounding. Electrical equipment should be grounded in accordance with the current National Electric Code standard. Proposal RFI #16 Is there any known asbestos insulation on existing primary cables if so, how will this be handled? No. Asbestos abatement is not in the contract scope. Proposal RFI #17 Will Temporary Generators be required for Outages and if so, what buildings must be able to size accordingly? There are only three (3) mission critical buildings as determined in the design phase. See E001 Phasing Notes for mission critical buildings. Proposal RFI #18 - Define separable connections. After opening manholes it appears that these are just modular splices not bolted T-bodies for disconnecting Elastimold catalog # K150T is an example of a tee splice. Proposal RFI #19 - When replacing the required transformers what happens if the existing Primary & secondary cabling is too short to make up on the new Transformers The intent is to procure replacement transformers with similar connections that do not require additional cable length. Proposal RFI #20 - What is the amount of total duration requirements for a single outage See E001 Phasing Notes. Work hours shall be 7AM Saturday through 7PM Sunday. Any power outage shall be coordinated with the VA as indicated. Only VA personnel disconnect/reconnect power under normal conditions. Proposal RFI #21 In the Description of Work page 2 of 7 states Each of the splices in the manholes identified shall be replaced with new devices in kind with existing type During the site visit a couple manholes were opened, it appears that when you remove (cutting out) the existing splices the cable will more than likely be too short to make new splices and mount on the racks. Please advise if this will be a mod. to the contract. Intent is to make existing connections in the same configuration as existing. X, T, Straight, etc. New connections shall be in accordance with design drawings, specifications, and applicable Codes. Exact cable length needed to be determined by contractor. Proposal RFI #22 In the Description of Work page 2 of 7 states new metering devices will be connected to the existing PME system. Will anything other than the meter and programing need to be provided? Will we use existing CT s and wiring? Assume new transformers will require new metering. See RFI#7, RFI#41, RFI#42, RFI#43, RFI #45, RFI #46 Proposal RFI #23 Since this is not a cable replacement job & is only a transformer change out, as discussed in the Site Visit. Will replacing the splices in the manholes as indicated in the Electrical Scope of Work Notes 2.1 & the Manhole Information notes still be required? Project SOW is as indicated on E001. Transformers, Manho

Who won similar work

110 award notices on SAM.gov in the last 24 months. Match: Same agency (Veterans Affairs), same NAICS 238210.

WinnerAwardsValueLast
PANACEA CONSTRUCTION GROUP LLC4$5.2MSep 14, 2026
MGI, INC.3$13.5MSep 14, 2026
KEVIN PIET, LLC3$6.4MJul 2, 2026
DUNBAR MECHANICAL CONTRACTORS, LLC3$4.8MJul 16, 2026
BRYANT POWER SOLUTIONS L.L.C GRAND BLANC 484393$3.2MSep 25, 2025
N-OVATION TECHNOLOGY GROUP LLC3$1.4MSep 10, 2026
POWER EDGE, INC.3$377KJun 4, 2026
SKYTEK LLC2$18.6MApr 28, 2026
U.S. VET GENERAL CONTRACTING, LLC2$3.0MSep 21, 2026
HIRT ELECTRIC, LLC2$1.2MJun 22, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.