SolicitationPosted Dec 19, 2025·Original deadline passed (Jan 6). See latest amendment for current deadline.

Z2DA--Replace MRI 1.5T

Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)

Stage
Open solicitation
NAICS
236220
Value
Not stated
Solicitation
36C24626B0001
Set-aside
None stated
PSC
Z2DA
Place
Not stated
Contact
Michael R Proctor (Michael.Proctor2@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24626B0001 in this department, oldest first.

Early notice
  • Sep 4, 2025
    Sources Sought
    Open
  • Oct 20, 2025
    Pre-solicitation
    Open
Solicitation
  • Nov 18, 2025
    Solicitation
    Open
  • Nov 18, 2025
    Solicitation
    Open
  • Dec 19, 2025 · this notice
    Solicitation
  • Jan 7, 2026
    Solicitation
    Open
  • Jan 12, 2026
    Solicitation
    Open
  • Jan 15, 2026
    Solicitation
    Open
  • Jan 20, 2026
    Solicitation
    Open
  • Jan 26, 2026
    Solicitation
    Open
  • Feb 4, 2026
    Solicitation
    Open
Award
  • Mar 6, 2026
    Award Notice
    DAX SAFETY & STAFFING SOLUTIONS, LLC · $1.3M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

36C24626B0001 Replace MRI 1.5T Amendment 0001 Responses to Vendor Questions Could you please confirm whether the new 1.5T MRI system has already been procured by the VA, or if the Department intends to issue a separate solicitation for the equipment? The new MRI Machine has not been procured by the VA at this point. Radiology/Bio-Medical plans to submit the package to NAC by December 31,2025. We would also like confirmation if the site visit listed for today was deemed mandatory for a compliant bid. No Is the floor recessed? No, per As-Built drawings, there is a built-up floor above the existi… (show all)

ng RF Shielding that will need to be removed. See Sheet A101 in forthcoming Addendum 01. May we avoid the pillar on the south wall by making the shield go straight across without having to go around the pillar? A straight, uninterrupted wall with no bump-out is acceptable, with the following requirements, however, the design intent of wrapping the column does not change with the RFI response: ABA clearances around the doors are to be maintained. The 1 ¾ RF Wall Panel and 4 1/8 Gypsum on Wood Stud wall are to remain continuous throughout the entire length of the wall. No interruptions. May we have a .dwg file? The awarded contractor will have access to all the CAD files that they need. What type of magnet hatch for delivery:� side or ceiling and its location? If referring to the removal and installation of the old and new machine, then it is a side delivery. This is located on the west side of the building with the loading dock. Do we know that Siemens has confirmed that there will be no active interference between the two MRI systems?� We have the ability to quote magnetic compensation but need to know if it's necessary. Response forthcoming in additional amendment. Solicitation Bid submission: Will the Government authorize electronic bid submissions? Please refer to the Instructions to Offerors page on bid submission. Lay-down and dumpsters: where will the lay-down and dumpsters area be located? Ideally, the best area for a lay-down and dumpster location is on the West-side (loading docks) of the MRI Machine. Currently, HICAPS has control of this area and we hope their project will be finished by the time this one proceeds. If this does not work, we can look for an area under the walkway. Space is very limited on campus so can address this as we move forward with the project. SSHO: spec. 01 35 26/1.9/C calls for the SSHO to be a separate individual from the superintendent and QC (which can be held by 1 individual). Because of the small size and limited complexity of the project would the government accept 1 person to cover all 3 roles? No, the VA will not accept 1 person to cover the Superintendent, Site Safety & Health Officer, and QC. Please comply with Specification 01 35 26/1.9/C. Can the VA provide the current Fire Alarm system manufacture, along with contact for company holding maintenance contract? Simplex Grinnell, Johnson Controls, Kristy Groff, kristy.groff@jci.com. Liz Hanes (service), � lizabeth.hanes@jci.com, Stephen Sander (sales), 919-208-0215 stephen.john.sander@jci.com Can the VA provide the current DDC control system manufacture, along with contact for company holding maintenance contract? The current DDC control system is Siemens Insight.� P.O.C. is Will Tattersall 919-280-0133. Fire Alarm is not addressed in the drawings but is in the specs. Can the government please provide fire alarm drawings and scope of work? No fire alarm work is anticipated for this contract. Fire alarm spec 28 31 00/ 2.5/A/1.,2.&17. call for spare parts that appear to far exceed what would be needed for a 100% replacement of possible installed devices. Can the government please verify that they are required? See response to RFI #13. Data: Drawing E101 Key note 1 "CONTRACTOR TO PROVIDE AND INSTALL NEW ELECTRICAL RECEPTICLES, DATA OUTLETS, AND DEVICES ON NEWLY CONSTRUCTED WALLS". Can the VA please provide facility standard for data outlets I.E. number of drops, color of cable and CAT requirement? Usually 2-4 ports per outlet, Cat6A terminated to the 568B standard. Data: Can the VA please provide location and distance to data closet? Room FG184B is the room where we are replacing the MRI Machine. The label above the keypad for the Data Closet is FG187 it is to the right of the entrance to Room FG182B (Storage). COR estimates the distance is approximately 80 feet. Data: Can the VA please confirm if there is room in the existing patch panel to accommodate the new data drops? There may be some room, but normally the contractor provides a new patch panel to be installed in the closet. Data: If there is not room in existing patch panels Can the VA please confirm that there is room in the existing rack to support an additional patch panel? There is room in the existing rack to support an additional patch panel. Data: Are there existing cable trays between the project and the data closet? Depends, usually there are cable tray but not always Data: Can data cables be run in J hooks or added to existing cable trays? Yes to both PACS: dawning A101 door schedule notes calls out PACS and spec 08 11 13/ 2.1/ A./ 1./ a. calls for hardware to be comparable with existing PACS. Can the Government please provide specific requirements to include quantities and locations of devices? See forthcoming Addendum 01 for revised Specification Section 08 34 16 Radio-Frequency-Interference Shielding Doors for a revised Door hardware list. PACS: Will door contacts and request exit motion detectors be required for each access control door? ? Yes, on door contacts. Not exit motion detectors. PACS manufacturer: What type of PACS are we adding to (software manufacturer and hardware manufacturer)? The current system is McKesson/Change Healthcare PACS locations: What is the room number of the telecom room containing the access control panels and approx. distance from the project site? If this is the same room as the Data room the following response had been provided: Room FG184B is the room where we are replacing the MRI Machine. The label above the keypad for the Data Closet is FG187 it is to the right of the entrance to Room FG182B (Storage). COR estimates the distance is approximately 80 feet. PACS: Can we the government please provide existing control panels and headend software id info, licensing info and photos Response forthcoming in additional amendment. Finishes: Drawing A102 finish legend: All colors are listed as TBD. Can the Government please provide colors for all finishes? Response forthcoming in additional amendment. Controls: Drawing M-101 General note 1. Can the government please provide room number and distance to nearest data closet? Room FG184B is the room where we are replacing the MRI Machine. There is no label on Data Closet, but it is to the right of the entrance to Room FG182B (Storage). COR estimates the distance is approximately 80 feet. Siemens recommendations: Drawing M-501 Mech. notes 4. Is an oxygen monitoring system within the scope of this project? If yes can the government, please provide details? An oxygen monitoring system is not included within the scope of this project.� The Scope of Work identifies limited plumbing activities associated with the MRI room, specifically noting minor adjustments to existing oxygen and vacuum connections to ensure they are flush with new architectural walls and provision of new house connections to meet user preferences". The� Scope of Work does not include requirements for the installation, replacement, modification, or commissioning of an oxygen deficiency monitoring system or associated alarms, sensors, controls, or annunciation devices. A&E Response: No oxygen monitoring system is included. Siemens chill water requirements: Drawing M-501 does the VA's chill water meet the requirements? New chiller will be provided by the manufacturer as part of the equipment package. Reference previous question if no what needs to be corrected and is

Who won similar work

4 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same product/service code (PSC) Z2DA and NAICS 236220.

Single-winner award sizes (4): middle half $1.3M to $3.0M, median $2.2M; range $414K to $3.8M.

WinnerAwardsValueLast
BLUE CORD DESIGN AND CONSTRUCTION, LLC1$3.8MJul 30, 2026
Yerkes South Inc.1$2.8MAug 24, 2026
LOCKRIDGE FBI LLC1$1.6MJun 27, 2025
CONTEGO ENVIRONMENTAL LLC1$414KNov 7, 2024

Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.