Design-Build Services � STM Security Fencing - North Boundary
Energy · ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation RFP-2027-27107 in this department, oldest first.
- Oct 7, 2026 · this noticeSolicitation
- Oct 8, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes de… (show all)
signing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR�s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR�s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR�s design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR�s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off?site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on?site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as?built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR�s Beneficial Occupancy process.
Who won similar work
5 award notices on SAM.gov in the last 24 months. Match: Same agency (Energy), same NAICS 238990.
| Winner | Awards | Value | Last |
|---|---|---|---|
| PINAL CONSTRUCTION, LLC | 1 | $36K | Jun 8, 2026 |
| FEDERAL BUILDERS LLC | 1 | $34K | Jun 1, 2026 |
| BOWEN DOOR SERVICE LLC | 1 | $27K | Mar 24, 2025 |
| MICHAEL PORTALATIN LLC | 1 | $24K | May 18, 2026 |
| Impact Solutions Group LLC | 1 | $11K | Mar 25, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Jun 8, 2026PINAL CONSTRUCTION, LLC$36K56--CAG Perimeter Fence Relocation
- Jun 1, 2026FEDERAL BUILDERS LLC$34KZ--Bismarck District Office Crawlspace Remediation ND
- May 18, 2026MICHAEL PORTALATIN LLC$24KR--GILA SUBSTATION NEW GATE INSTALLATION
- Mar 25, 2026Impact Solutions Group LLC$11KR--Repair and Replace Fence at Rogers Substation
- Mar 24, 2025BOWEN DOOR SERVICE LLC$27KZ--Roto-gate door replacements with Storefront Doors
Competitive landscape
For the 5 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Energy, Dept of since 2024 (0 filings)
- 0 of their lobbyists list a past Energy, Dept of job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 75 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.