Loading the records…
Loading the records…
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Army Corps of Engineers is planning to buy "OCAR HQ Optimization - Ft. Belvoir". This is an early notice: it is not taking bids yet. The work is in Alexandria, DC, USA. The original due date (Jul 30, 2026) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 10 or more companies, usually for about $13.0M per award. An award is expected between November 2026 and March 2027.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation W912QR27MI-OCARHQ in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
it a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 � Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and renovation of the three story, approximately 88,000 square foot Truman Hall, located on Fort Belvoir, VA. Truman Hall currently serves as the Office of Chief of the Army Reserve (OCAR) HQ facility. As a result of the Department of Army mandated consolidation of the United States Army Reserve Command (USARC) and OCAR, renovations are required to Truman Hall to accommodate an additional 215 personnel. Personnel will be arriving starting in March 2027 and continuing through 2028. The building will require extensive interior renovation to address code and life safety issues associated with the increased occupancy. The purpose of this project is to perform the necessary building renovations to accommodate the additional 215 personnel, allowing the facility to meet current mission requirements in accordance with applicable UFC standards, the Army Reserve Design Guide, and Installation Specific Design Guides. The project will be designed to extend the life of the facility by 25 years. Key features of this maintenance and repair project include: Updated floorplans to maximize workstation capacity within existing facility Removal of existing furniture cubicles and associated electrical and IT connections. Removal and replacement of electrical, plumbing, HVAC, telecommunications. Renovation of building HVAC system to include new rooftop HVAC units, modification of existing ductwork, and integration of building monitoring system as required. Install new telecommunications lines, wireless drops, and hardware that complies with new furniture layout and cybersecurity requirements. Additional means of egress to be added if layout does not meet NFPA standards. Plumbing revisions to accommodate additional water closets and lavatories for the increased occupancy. Interiors improvements include deep cleaning carpets and repairing / repainting walls. Electrical upgrades to accommodate new HVAC and workstation requirements. Estimated Acquisition Magnitude: Between $4-6 Million Planned Acquisition Strategy: Progressive Design-Build (PDB) via Other Transaction Authority (OTA) The Government is considering utilizing an Other Transaction (OT) Agreement for a prototype project under the authority of 10 U.S.C. � 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build (PDB). Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. INFORMATION REQUESTED 1. Company Profile: Firm Name, Address, and Point of Contact (Name, Title). Phone Number, Email Address, and Unique Entity ID (UEI). Socioeconomic Status (Other than Small, Small, 8(a), SDVOSB, etc.). 2. Other Transaction Authority (OTA) & Statutory Compliance: Innovative Technologies: The authority for this OTA (10 U.S.C. � 2808a) is focused on prototyping with new or emergent construction technologies. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers? 3. Progressive Design-Build (PDB) / Early Contractor Involvement: Baseline Definition: What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering into Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Collaborative Framework: What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods. How do you approach "open-book" pricing and transparency during Phase 1 (Pre-Construction) to build trust and ensure the Government is receiving fair market value? 4. Guaranteed Maximum Price (GMP), Risk Allocation & Compensation: Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the GMP or final design (the "off-ramp"), what specific compensation structures (e.g., stipends, time-and-materials for design effort) would adequately compensate your firm for pre-construction efforts? Payment Milestones: Because an OTA allows for flexible payment structures, what milestone payment arrangement during Phase 1 (e.g., monthly progress, completion of design percentages, deliverable-based) best supports your firm's cash flow and resource allocation? Data Rights: Under an OTA, data rights and intellectual property can be negotiated. What data rights structure for the final design deliverables (if an off-ramp is taken) would provide a fair balance between the Government's need to construct the facility and your firm's proprietary design methods? In your experience with PDB, at what design milestone (e.g., 35%, 65%, 90%) is it most advantageous to lock in the GMP for a Government HQ facility, and why? How do you handle the procurement of long-lead items (e.g., switchgear, specialized fire pumps, large span steel) prior to establishing the final GMP? 5. Government Facility Renovation Expertise: Describe your specific experience with renovation work of multi-story office buildings and/or other similar facilities on a military controlled installation. What is the greatest supply chain, scheduling, or technical risks you foresee for a project of this type at Fort Belvoir, and how would the PDB delivery method help mitigate them? 6. Teaming & Subcontractor Integration: Under a PDB model, how and when do you plan to onboard your critical subcontra
46 award notices on SAM.gov in the last 24 months. Matched by: Same office (W072 ENDIST LOUISVILLE), same NAICS 236220.
Single-winner award sizes (46): middle half $6.6M to $22.1M, median $13.0M; range $95K to $134.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Howard W. Pence, Inc. | 4 | $30.4M | Sep 30, 2026 |
| Butt Construction Company | 4 | $23.9M | Sep 24, 2025 |
| BENAKA, INC. | 2 | $42.8M | Jan 15, 2026 |
| Gideon Contracting, Limited | 2 | $12.7M | Sep 18, 2025 |
| T & T CONSTRUCTION ENTERPRISES, LLC | 2 | $502K | Oct 1, 2026 |
| Harper Construction Company | 1 | $134.4M | Sep 18, 2025 |
| MESSER CONSTRUCTION CO Cincinnati OH 45203 USA | 1 | $82.5M | Sep 21, 2026 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.