SolicitationPosted May 2, 2025·Responses due May 15, 2025

58--RECEIVER SUBASSEMBL - AND OTHER REPLACEMENT PARTS

NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT MECH

Stage
Open solicitation
NAICS
334412
Value
Not stated
Solicitation
N0010425RUA51
Set-aside
None stated
PSC
5998
Place
Not stated
Contact
Telephone: 7176052541 (AMBER.L.WALE.CIV@US.NAVY.MIL)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation N0010425RUA51 in this department, oldest first.

Early notice
  • Dec 14, 2024
    Pre-solicitation
    Open
  • Apr 2, 2025
    Pre-solicitation
    Open
Solicitation
  • Dec 23, 2024
    Solicitation
    Open
  • Feb 4, 2025
    Solicitation
    Open
  • Apr 2, 2025
    Solicitation
    Open
  • May 2, 2025 · this notice
    Solicitation
  • May 9, 2025
    Solicitation
    Open
  • May 22, 2025
    Solicitation
    Open
  • Jun 12, 2026
    Solicitation
    Open
Award
  • Jun 12, 2026
    Award Notice
    LOCKHEED MARTIN CORPORATION · $1.6M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA- 0019AA|see RFP for QTY|365 days ADOC|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO RECEIVING REPORT AND INVOICE|N/A|HQ0338|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY … (show all)

OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334412|750|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| FACSIMILE PROPOSALS (OCT 1997)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Electronic spreadsheet| TYPE OF CONTRACT (APR 1984)|1|FIRM FIXED PRICE| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA (MAY 2024))|1|| THE PURPOSE OF THIS AMENDMENT IS TO CANCEL CLINS 0004, 0012,0016 AND 0017 FROM THE RFP. CLAUSES ARE UPDATED WITHIN. NO OTHER CHANGES ARE MADE AT THIS TIME. \ THE PURPOSE OF THIS AMENDMENT IS TO EXTEND PROPOSAL DUE DATE TO 1800 ON 15 MAY 2025. NO OTHER CHANGES ARE MADE AT THIS TIME. \ THE PURPOSE OF THIS AMENDMENT IS TO: 1.) EXTEND THE PROPOSAL DUE DATE TO 17 APR 2025. 2.) ADD CLAUSE FAR 52.211-8 FOR 365 DAYS AFTER DATE OF CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. \ A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to amber.l.wale.civ@US.NAVY.MIL. B. General Requirements: MIL-STD Packaging, Government Source Inspection Required. C. All freight is FOB Origin. D. This RFQ is for a BUY/Procurement. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. G. Your quote should include the following information for justification purposes: - New procurement unit price____________________ - Total Price _____________________ - Procurement delivery lead time (PTAT) _________________ days - Award to CAGE _______________ - Inspection & Acceptance CAGE, if not at Award to CAGE _____________ - Cost breakdown requested, including profit rate (if feasible). - Quote expiration date _______________ (90 Days minimum is requested). - Delivery Vehicle (If Delivery Order requested)(e.g. if your CAGE has a current BOA/IDIQ) H. Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide an official letter and/or email from the OEM confirming that your company is an authorized distributor of their items. I. For any proposal above the Truthful Cost and Pricing Data threshold, refer to DFARS 252.215-7009 Proposal Adequacy Checklist. J. A Subcontracting Plan is required with a proposal exceeding the threshold at FAR 19.702. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 8359257-1 02769 20529126-2; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in MIL-STD-1686. 3.5 Marking - This assembly and its piece parts shall be physically identified in accordance with MIL-STD-130. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to

Who won similar work

5 award notices on SAM.gov in the last 24 months. Matched by: Same office (NAVSUP WEAPON SYSTEMS SUPPORT MECH), same product/service code (PSC) 5998 and NAICS 334412.

Single-winner award sizes (5): middle half $565K to $1.8M, median $686K; range $193K to $49.7M.

WinnerAwardsValueLast
RAYTHEON COMPANY · $RTX · $68.9B2$50.4MJul 23, 2026
RAM-SYSTEMS GMBH Ottobrunn 85521 DEU1$1.8MAug 7, 2025
KAMPI COMPONENTS CO INC1$565KApr 6, 2026
HAMILTON SUNDSTRAND CORPORATION · $RTX · $68.9B1$193KDec 9, 2024

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Investor context
  • $RTX reported $68.9B revenue in FY2025. The median single-winner award in these 5 past awards, $686K, is under 0.1% of that. 10-K

One award's total value against one year of revenue; many awards are paid over several years.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (0 filings)
  • 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
  • $386K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 1 of the past winners are listed companies
  • 0 insider buys and 4 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.