CGC Kathleen Moore 100ton Crane Services
Coast Guard · BASE MIAMI(00028)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 52050PR260000515 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 52050PR260000515. Applicable North American Industry Classification Standard (NAICS) codes are: 238990 (All Other Specialty Trade Contractors) This requirement … (show all)
is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15. The Government will award a contract resulting from this solicitation to the responsible offer or whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of materials and equipment b. Cost of labor Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 12 OCT 2026. Quotes are to be received no later than close of business (3 p.m.) on 02 October 2026 and are to be sent via e-mail to Angel.melendez@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Angel Melendez 12100 SW 152nd Street Miami, FL 33177. Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in SAM (www.sam.gov). Wage determinations: 2015-4543 *SCOPE OF WORK DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD BASE MIAMI BEACH SPECIFICATIONS FOR CGC Kathleen Moore 100ton Crane Services General: United States Coast Guard Base Miami Beach is accepting proposals for qualified the Contractor shall furnish all crane services, rigging equipment, operators necessary to safely remove the extract the existing main diesel engines (MDEs) and install new MDEs aboard CGC Kathleen Moore. Services shall be performed in accordance with applicable Coast Guard specifications, drawings, and safety requirements. Location: United States Coast Guard Base Miami Beach 100 MacArthur CSWY Miami Beach, FL 33139 Examination of Site: It is HIGHLY ENCOURAGED that bidders carefully inspect the work in place and verify the amount of work necessary to complete the job. Prospective bidders arrange for a tour of the job site by calling the point of contact, LT Allie Doris at (786)299-7906 or by e-mail at carrie.a.doris@uscg.mil, at least 3 working days in advance. I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility�s normal operations. Normal operating hours are from 6:30am to 2:30pm Monday thru Friday except federal holidays. Any work during other hours shall be requested in writing at least 5 working days in advance and must be approved by the Contracting Officer. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the Contracting Officer�s Representative (COR) to coordinate all construction efforts onboard Coast Guard Facilities. LT Allie Doris - COR Carrie.A.Doris@uscg.mil 786-299-7906 Mr. Bryan Goltz Bryan.W.Goltz@uscg.mil 786-350-9700 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer�s Representative of lost time due to accidents is required. Provide two copies of workman�s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer�s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor�s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor�s expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall always wear company identification and carry personal identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. X: Regulations while onboard Coast Guard Base Miami Beach: 1.Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events. 2.The construction site shall always be maintained in a clean condition. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate. 3.Contractors are welcome to eat breakfast & lunch on Base in the base galley at cost. Breakfast is served from 0630-0730 daily & lunch will be served from 1130-1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty. 4.There is one smoking area on base located in the central northern parking lot covered by the tiki hut. No smoking is permitted anywhere else on base. 5.Contractors are welcome to utilize the Base�s Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it. 6.Traffic Regulations: a)10 mph speed limit b)No use of cell phones is permitted while driving vehicles or operating heavy machinery c)All personnel shall obey all marked traffic signals including stop signs & stop lights. 7.Absolutely no firearms or weapons of any kind are allowed onboard Base. 8.Only American citizens and permanent resident aliens are allowed onboard Base. Absolutely no foreign nationals are permitted on the premises. 9.Notice shall be given to the Coast Guard�s representative 1 week in advance of any planned power, water, sewage or lighting outages. 10.The contractor shall provide a consolidated list of all contracted personnel including their driver�s license numbers (or other valid gov�t
Who won similar work
3 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 238990.
| Winner | Awards | Value | Last |
|---|---|---|---|
| PHOENIX MARINE LLC | 1 | $67K | Oct 16, 2025 |
| GOVGLOBAL CONSULTING LLC | 1 | $60K | Aug 20, 2026 |
| Nine3Six Solutions LLC | 1 | $21K | May 8, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Aug 20, 2026GOVGLOBAL CONSULTING LLC$60KSecurity fence at Coast Guard Air Station Clearwater Florida
- Oct 16, 2025PHOENIX MARINE LLC$67KUSCGC Raymond Evans Crane Services
- May 8, 2025Nine3Six Solutions LLC$21KCrane rental with operator for Coast Guard Cutter Joshua Appleby St. Petersburg, FL
Competitive landscape
For the 3 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied U.S. Coast Guard (USCG) since 2024 (0 filings)
- 0 of their lobbyists list a past U.S. Coast Guard (USCG) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 433 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.